NERC

Liberty University

Here are the best resources to pass NERC. Find NERC study guides, notes, assignments, and much more.

All 27 results

Sort by

NERC EXAM| FINAL ASSESSMENT| 317 QUESTIONS| 52 PAGES COMPLETE SOLUTIONS 100% CORRECT ANSWERS|
  • NERC EXAM| FINAL ASSESSMENT| 317 QUESTIONS| 52 PAGES COMPLETE SOLUTIONS 100% CORRECT ANSWERS|

  • Exam (elaborations) • 54 pages • 2023
  • NERC EXAM| FINAL ASSESSMENT| 317 QUESTIONS| 52 PAGES COMPLETE SOLUTIONS 100% CORRECT ANSWERS| When using a dynamic schedule and the energy profile in an hour is >250 MW and the actual hourly integration deviates from the hourly energy profile by ____ the tag must be modified. A. 100 MW B. 10% C. 50 MW D. 25% Correct Answer B. 10% Dry steam plants, flash steam plants, and binary cycle power plants are the three main types of what kind of generating plant? A. Nuclear generators B. C...
    (0)
  • $10.08
  • + learn more
NERC Standards quiz answered
  • NERC Standards quiz answered

  • Exam (elaborations) • 15 pages • 2023
  • NERC Standards| 120 questions| with complete solutions How Many Active Standards are in BAL (Resource and Demand Balancing) - CORRECT ANSWER There are 8 Active Standards Listed Below: BAL-001-2 Real Power Balancing Control Performance Related Information Subject to Enforcement BAL-001-TRE-1 Primary Frequency Response in the ERCOT Region Related Information Subject to Enforcement BAL-002-3 Disturbance Control Standard - Contingency Reserve for Recovery from a Balancing Contingency Event Sub...
    (0)
  • $5.99
  • + learn more
KNOWN NERC EXAM QUESTIONS WITH SOLUTIONS (A+ GRADED)
  • KNOWN NERC EXAM QUESTIONS WITH SOLUTIONS (A+ GRADED)

  • Exam (elaborations) • 9 pages • 2023
  • KNOWN NERC EXAM QUESTIONS WITH SOLUTIONS (A+ GRADED)
    (0)
  • $9.99
  • + learn more
NERC book quiz questions answered with complete solution
  • NERC book quiz questions answered with complete solution

  • Exam (elaborations) • 14 pages • 2023
  • You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due to a large loss of load in the contingent BA. If your generator governor control systems responded to the frequency deviation approximately how much of a generation change would you BA experience? - correct answer -4MW Net actual interchange minus Net scheduled interchange is what? - correct answer Inadvertent interchange Suppose your interconnection operators at 59.97 Hz from one minute after ...
    (0)
  • $3.99
  • + learn more
NERC Prep - Bal, Int, & Trans Test| 61 questions| with complete solutions
  • NERC Prep - Bal, Int, & Trans Test| 61 questions| with complete solutions

  • Exam (elaborations) • 12 pages • 2022
  • What group can approve a change in the Disturbance Recovery Period for an Interconnection? a. NERC Interconnection Working Group b. NERC Operating Committee c. NERC Regional Council d. NERC Disturbance Analysis Working Group correct answer: b. NERC Operating Committee What is the first thing an operator should do after a relay operation? a. Check power system stabilizers b. Notify adjacent Transmission and Balancing areas c. Check targets and equipment d. Notify their PSE tha...
    (0)
  • $9.49
  • + learn more
NERC Standards| 120 questions| with complete solutions
  • NERC Standards| 120 questions| with complete solutions

  • Exam (elaborations) • 13 pages • 2022
  • How Many Active Standards are in BAL (Resource and Demand Balancing) correct answer: There are 8 Active Standards Listed Below: BAL-001-2 Real Power Balancing Control Performance Related Information Subject to Enforcement BAL-001-TRE-1 Primary Frequency Response in the ERCOT Region Related Information Subject to Enforcement BAL-002-3 Disturbance Control Standard - Contingency Reserve for Recovery from a Balancing Contingency Event Subject to Enforcement BAL-002-WECC-2a Contingency Reserve R...
    (1)
  • $10.49
  • + learn more
NERC Class| 98 questions| with complete solutions
  • NERC Class| 98 questions| with complete solutions

  • Exam (elaborations) • 10 pages • 2022
  • Frequency Bias and Jointly Owned Units (JOU) correct answer: BAs that use dynamic schedule or pseudo-ties for a jointly owned unit share responsibility for it in their bias settings. Fixed schedules for JOU require host BA to include total response for them in their bias setting. Frequency Bias and BA frequency response correct answer: BAs must maintain a frequency bias that is equal to or greater than the BA frequency response. If the frequency bias is less than the frequency response, A...
    (1)
  • $8.49
  • + learn more
NERC flashcard set Reliability coordinator (RC) 220 questions| with complete solutions
  • NERC flashcard set Reliability coordinator (RC) 220 questions| with complete solutions

  • Exam (elaborations) • 16 pages • 2022
  • What entity balances generation and monitors/employs contingency reserves? correct answer: Balancing Authority (BA) What entity has the widest system view and is the "supervisor"? correct answer: Reliability coordinator (RC) What entity monitors transmission lines and operates tap-changers, breakers, capacitors, etc? correct answer: Transmission Operators (TOP) What is a group of BAs that have agreements to help cover each other's reserve and regulation requirements? correct answe...
    (0)
  • $12.49
  • + learn more
NERC Reliability Standard numbers and titles.
  • NERC Reliability Standard numbers and titles.

  • Exam (elaborations) • 6 pages • 2022
  • BAL-001-0.1a correct answer: Real Power Balancing Control Performance BAL-STD-002-0 correct answer: Operating Reserves (WECC) BAL-003-0.1b correct answer: Frequency Response and Bias BAL-004-0 correct answer: Time Error Correction BAL-004-WECC-01 correct answer: Automatic Time Error Correction BAL-005-0.1b correct answer: Automatic Generation Control BAL-006-2 correct answer: Inadvertent Interchange COM-001-1.1 correct answer: Telecommunications COM-002-2 correct ...
    (0)
  • $6.49
  • + learn more
NERC text 130 questions with complete solutions
  • NERC text 130 questions with complete solutions

  • Exam (elaborations) • 22 pages • 2022
  • Operating reserve may be provided by which of the following? A. LTCs B. Capacitor banks C. Voltage regulators D. Interruptible loads correct answer: D. Interruptible loads Which of the following is the responsibility of a reserve sharing group (RSG)? A. Complying with DCS as if it was a single control area B. Proving regulation service for neighboring RSGs C. Ensuring each control area in the group maintains 50% blackstart capability D. Complying with the control performance standard...
    (0)
  • $9.49
  • + learn more