CYB 210 (CYB-210)
Southern New Hampshire University
All 41 results
Sort by
-
CYB-210-Q2386 Computer Networking 19EW2 Project One: Network Modification
- Exam (elaborations) • 11 pages • 2024
-
- $9.00
- + learn more
Project One: Network Modification Brief CYB-210-Q2386 Computer Networking 19EW2 Professor Jocelyn Abdul-Rasheed Charles L Lang
-
CYB-210 Project One Computer Network Modification
- Summary • 11 pages • 2023
-
- $10.00
- + learn more
CYB-210 Project One Computer Network Modification. This brief will explain the steps that were taken to configure new devices and the network. Screenshots are included for each step for better understanding. Completed the following: Add free guest wireless internet for the customers Install cameras that monitor the front desk and the waiting area. Reconfigure the current network to support the new hardware. The needed hardware is already in the office, so the cameras and wireless rou...
-
CYB-210 Project One Computer Network Modification Brief | CYB-210 Project Two Network Design Rationale | CYB-210 Module 7 Project Two and CYB-210 week 6 Project One: Computer Networking Modification Brief
- Package deal • 7 items • 2023
-
- $33.49
- + learn more
CYB-210 Project One Computer Network Modification Brief | CYB-210 Project Two Network Design Rationale | CYB-210 Module 7 Project Two and CYB-210 week 6 Project One: Computer Networking Modification Brief
-
CYB-210 Project One Computer Network Modification, CYB-210 Project Two Network Design Rationale, CYB-210 Module 7 Project Two, CYB-210 Project Two: Network Diagram and Rationale and CYB-210 week 6 Project One: Computer Networking Modification.
- Package deal • 5 items • 2023
-
- $35.49
- 1x sold
- + learn more
CYB-210 Project One Computer Network Modification, CYB-210 Project Two Network Design Rationale, CYB-210 Module 7 Project Two, CYB-210 Project Two: Network Diagram and Rationale and CYB-210 week 6 Project One: Computer Networking Modification.
-
CYB-210 week 6 Project One: Computer Networking Modification.
- Exam (elaborations) • 11 pages • 2023
- Available in package deal
-
- $19.49
- + learn more
CYB-210 week 6 Project One: Computer Networking Modification. 
The needed hardware is already in the office, so the cameras and wireless router as well as the 
tablet and smart phone were gathered from the equipment closet. To start off the scenario I first 
got the network ready for the new hardware, by reconfiguring the existing switch. After 
selecting the switch and clicking on the CLI, a command was entered to add and name the new 
VLAN for the wireless router’s “Guest” network. The C...
Fear of missing out? Then don’t!
-
CYB-210 Project Two: Network Diagram and Rationale
- Exam (elaborations) • 12 pages • 2023
- Available in package deal
-
- $21.49
- + learn more
CYB-210 Project Two: Network Diagram and Rationale. 
In this scenario we are tasked with combining Subnet1 and Subnet2 into NetworkA, 
configure static routing between NetworkA and Network3 configure DHCP and DNS services, 
and NAT configuration for ping capabilities and communication between the networks. To start I 
decide to delete Subnet2 and shut down the unused port FA0/1 on the Subnet_Router for better 
security. I than moved all the computers and printers from Subnet2 to Subnet1 and reco...
-
CYB-210 Module 7 Project Two
- Exam (elaborations) • 17 pages • 2023
- Available in package deal
-
- $17.49
- + learn more
CYB-210 Module 7 Project Two. 
This project was a little more tricker than the other one. With this project we were given 3 
networks. Networks A and B needed to be connected into one with a new network scheme. 
Network 3 and the new network needed to be connected together. With this being said I added a 
third switch to account for future expansion. I kept the two switches we were given for subnet 1 
and 2 and added a third to connect the networks to that switch and then into the router. Doing ...
-
CYB-210 Project Two Network Design Rationale
- Exam (elaborations) • 3 pages • 2023
- Available in package deal
-
- $12.49
- + learn more
CYB-210 Project Two Network Design Rationale. 
The first requirement is to create a new IP config that combines both Subnet1 and 
Subnet2 into a new network, NetworkA; which must be a Class C network. To do this, we 
removed the switch for Subnet2 and connected all those devices to the switch for Subnet1. The 
switch was renamed to NetworkA_Switch and is now accommodating all devices previously on 
Subnet1 and Subnet2, which have also been renamed accordingly. The IP Address for NetworkA 
is set...
-
CYB-210 Project One Computer Network Modification
- Exam (elaborations) • 11 pages • 2023
-
- $24.49
- + learn more
CYB-210 Project One Computer Network Modification. 
The needed hardware is already in the office, so the cameras and wireless router were 
harvested from the equipment closet. To get the network ready for the new hardware, the 
existing switch was reconfigured first. After selecting the switch and clicking on the CLI, a 
command was entered (see Figure 1) to add and name the new VLAN for the wireless router’s 
“Guest” network. The command was run again to add and name the new VLAN for the ...
-
CYB-210 Project One Computer Network Modification
- Exam (elaborations) • 13 pages • 2023
- Available in package deal
-
- $17.49
- + learn more
CYB-210 Project One Computer Network Modification. 
To place the ports, they are connected to within the appropriate VLAN 70 and 80. Figure 
2 is the VLAN table showing both VLAN 70 and 80 active have been added with switch 
ports assigned Fa0/1, Fa0/2 and Fa0/3. This is done with the CLI command on the switch or 
under ConfigINTERFACEFastEthernet ports. I use the command on CLI. 
Click on CLIenable command, then hit enter. First, configure the appropriate ports on 
switch. Looking at t...
Do you wonder why so many students wear nice clothes, have money to spare and enjoy tons of free time? Well, they sell on Stuvia! Imagine your study notes being downloaded a dozen times for $15 each. Every. Single. Day. Discover all about earning on Stuvia