Bill of materials bom Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Bill of materials bom? On this page you'll find 104 study documents about Bill of materials bom.

Page 2 out of 104 results

Sort by

CPIM Part 1 Test Questions With Verified Answers
  • CPIM Part 1 Test Questions With Verified Answers

  • Exam (elaborations) • 17 pages • 2024
  • Available in package deal
  • 4 Ps - Answer `Product, Price, Promotion, Place Competitive Priorities/Performance Objectives - Answer Cost, Quality, Time, Flexibility Which trends are easiest to forcasat - Answer Stable demand Master Scheduling forcast/horizon - Answer Physical units at end item level/3-18 months Seasonal Index - Answer Period Average Demand/Average Demand of All Periods Qualitative Techniques - Answer Based on opinion, subjective (market research/business planning/medium to long term) Quant...
    (0)
  • $11.49
  • + learn more
WGU C215 Study Guide – FINAL Question with 100 % correct answers | Verified | updated
  • WGU C215 Study Guide – FINAL Question with 100 % correct answers | Verified | updated

  • Exam (elaborations) • 24 pages • 2024
  • Available in package deal
  • 1st Generation ERP - Enterprise Resource Planning. - These were interface software's that managed routine activities These were also designed for internal purposes only, not to support supply chain 2nd Generation ERP - Enterprise Resource Planning. - These were designed to help with the decision-making processes necessary to manage company supply chains. Basically, answering the question of whether to do business with a supplier or customer with the ERP software answering the question of ...
    (0)
  • $7.99
  • + learn more
SQE 189 Questions Correct Answers|2024
  • SQE 189 Questions Correct Answers|2024

  • Exam (elaborations) • 11 pages • 2024
  • 3 ways a dealer can qualify for team up - ️️3 million in qualified invoiced purchase 2-3 million and 10% growth 1.6-2 million and 20% growth a dsr wants to submit a warranty claim, is there a tool on hrp for that - ️️yes, quick claim A&D - ️️Architecture and design address of HON HQ - ️️200 Oak St, Muscatine IA 52761 are cantilever brackets included with systems worksurfaces - ️️no are specials an COM's allowed on fast track - ️️yes BDM - ️️Business Developme...
    (0)
  • $8.49
  • + learn more
PLM Final || Already Graded A+.
  • PLM Final || Already Graded A+.

  • Exam (elaborations) • 5 pages • 2024
  • Two biggest seasons for fashion? correct answers Fall and Spring What is used more basic or fashion colors? correct answers Basics because they are less expensive and are a easier sell. Mood Board correct answers The inspiration or theme. This is where trends and colors are based off of. Strike-off correct answers Sample of fabric for production Lab dip correct answers Lab dip is small swatch of fabric to define color and its recipe before it goes for bulk dyeing. color standard c...
    (0)
  • $10.19
  • + learn more
TXMI 4250 QUESTIONS AND ANSWERS, GRADED A+[LATEST EXAM UPDATES]
  • TXMI 4250 QUESTIONS AND ANSWERS, GRADED A+[LATEST EXAM UPDATES]

  • Exam (elaborations) • 20 pages • 2024
  • TXMI 4250 QUESTIONS AND ANSWERS, GRADED A+ 100% inspection has been proven that it isn't effective because? - -- Very expensive - Operators make many mistakes: from boredom, casualness, & lack of caring 807 & 807A were converted under HTS 9802 in 1988 under what bill? - -Omnibus Trade Bill a French Tailor came up with a 1 thread chain-stitch machine to simulate hand sewing patented in 1830? - -Barthelemy Thimonnier a good tech pack will contain? - -A technical sketch of a garment, front ...
    (0)
  • $10.49
  • + learn more
82 Final Exam Review OPMA 3306 Questions And Answers
  • 82 Final Exam Review OPMA 3306 Questions And Answers

  • Exam (elaborations) • 5 pages • 2024
  • "Projected available balance" is a term referring to unsold finished goods inventory - ️️False 100% inspection is justified when the cost of inspection is low - ️️False A BOM file is also called - ️️Product Tree A BOM file is also called which of the following - ️️Product Tree A free trade zone operates under different rules and laws than a foreign trade zone - ️️False A lot for lot (L4L) lost sizing technique does not take into account setup costs or capacity limitati...
    (0)
  • $7.99
  • + learn more
NCSC Practice Exam
  • NCSC Practice Exam

  • Exam (elaborations) • 17 pages • 2023
  • A consultant needs to verify the make and model of the systems that will be imaged with Foundation. The consultant does not have the Bill of Materials (BOM) available to review. When should the consultant verify the make and model to prepare for the cluster deployment? A. Upon arriving on-site B. When reviewing the Statement of Work (SOW) C. During the Foundation process D. While conducting the Tech Review Call - Answer- D. While conducting the Tech Review Call Which Subnet is reserved fo...
    (0)
  • $12.49
  • + learn more
MISY 5340 Chapter 6 question n answers graded A+ 2023/2024
  • MISY 5340 Chapter 6 question n answers graded A+ 2023/2024

  • Exam (elaborations) • 10 pages • 2023
  • Available in package deal
  • MISY 5340 Chapter 6Which one of the following are key organizational data relevant to the production process? A. Company Code B. Credit Control Area C. Client D. Storage Location E. Plant - correct answer A C D E The master data relevant to the production process are A. Work Centers B. Material Masters C. Bill of Materials D. Client E. Company Code - correct answer A B C Which of the following are statuses that can apply to a BOM? A. On B. Off C. Active D. Inactive E....
    (0)
  • $17.99
  • + learn more
GCSS Army Exam Questions with Correct Answers
  • GCSS Army Exam Questions with Correct Answers

  • Exam (elaborations) • 3 pages • 2024
  • GCSS Army Exam Questions with Correct Answers Available to Promise (ATP) - Answer-The ability to check if the components on a work order are in stock. Batch - Answer-Formerly referred to as "Condition Code." Classifies materiel in terms of readiness for issue. Bill of Material (BOM) - Answer-A maintenance bill of material (BOM) is a complete structured list of the components making up a piece of equipment or assembly. Bill of Materials (BOM) - Answer-An exploded view of a component,...
    (0)
  • $13.39
  • + learn more
PLTW IED EOC Review Terms with Complete Solutions
  • PLTW IED EOC Review Terms with Complete Solutions

  • Exam (elaborations) • 5 pages • 2024
  • PLTW IED EOC Review Terms with Complete Solutions American Society of Mechanical Engineers (ASME) - Answer-1. A professional engineering organization that is known for setting codes and standards for mechanical devices in the United States. ASME drawing standards are found in the Y-14M publications. 2. The acronym for the American Society of Mechanical Engineers. Tolerance - Answer-The total permissible variation in a size or location dimension. Auxiliary View - Answer-An orthographic vie...
    (0)
  • $13.39
  • + learn more