Nicet level 1 questions - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Nicet level 1 questions? On this page you'll find 338 study documents about Nicet level 1 questions.

Page 2 out of 338 results

Sort by

NICET Highway Construction Inspector Level III Practice Exam 1 (56 passed new update questions and answers)
  • NICET Highway Construction Inspector Level III Practice Exam 1 (56 passed new update questions and answers)

  • Exam (elaborations) • 16 pages • 2024
  • NICET Highway Construction Inspector Level III Practice Exam 1 (56 passed new update questions and answers) During installation of traffic loops in the pavement, which three statements apply prior to and during the installation of loop wire? (Choose 3). a) Do not allow vehicular traffic over an open saw cut. b) Do not overlap saw cuts at the corner. c) Thoroughly clean the saw cut of foreign material. d) Use a plastic sleeve where loop wire crosses a joint.
    (0)
  • $8.99
  • 1x sold
  • + learn more
Nicet Level 1 - Water Based Layout Questions and Answers Graded A+
  • Nicet Level 1 - Water Based Layout Questions and Answers Graded A+

  • Exam (elaborations) • 26 pages • 2023
  • Nicet Level 1 - Water Based Layout Questions and Answers Graded A+ Toggle hangers shall be permitted only for the support of pipe __________ inches or smaller in size under ceilings of hollow tile or metal lath and plaster. 1 2/2 in. (ref. NFPA 13 2016 Sec. 9.2.1.1.2. While conducting a flow test, the chosen hydrant should be ______ As close to the property where the sprinkler system is being installed. (Ref, NFPA 13 Sec. A.24.2.2. or NFPA 291) What formula is used to determine the discharge ...
    (0)
  • $10.49
  • 1x sold
  • + learn more
Nicet Level 1 Water Based Layout Exam Practice Questions and Answers | Verified and Updated
  • Nicet Level 1 Water Based Layout Exam Practice Questions and Answers | Verified and Updated

  • Exam (elaborations) • 20 pages • 2024
  • Nicet Level 1 Water Based Layout Exam Practice Questions and Answers | Verified and Updated Toggle hangers shall be permitted only for the support of pipe __________ inches or smaller in size under ceilings of hollow tile or metal lath and plaster. - Correct Answer️️ -1 2/2 in. (ref. NFPA 13 2016 Sec. 9.2.1.1.2. While conducting a flow test, the chosen hydrant should be ______ - Correct Answer️️ -As close to the property where the sprinkler system is being installed. (Ref, NFPA 1...
    (0)
  • $12.49
  • 1x sold
  • + learn more
NICET LEVEL 1 QUESTIONS AND ANSWERS
  • NICET LEVEL 1 QUESTIONS AND ANSWERS

  • Exam (elaborations) • 7 pages • 2024
  • NICET LEVEL 1 QUESTIONS AND ANSWERS
    (0)
  • $11.49
  • + learn more
NICET Inspect & Test LVL 2 Exam Questions and Answers
  • NICET Inspect & Test LVL 2 Exam Questions and Answers

  • Exam (elaborations) • 7 pages • 2024
  • Available in package deal
  • NICET Inspect & Test LVL 2 Exam Questions and Answers While testing a fire alarm system at a correctional facility, it is determined that the general fire alarm signal requires human intervention to be initiated. This is permitted using a _____ feature? A. Pre signal B. Positive alarm sequence C. Manual initiation D. Alarm verification - Answer-A. Pre Signal NFPA 72 23.8.1.1.2(3)(a) Consider a 50′ x 50′ room with a 12′ ceiling. What is the minimum intensity required for a ceilin...
    (0)
  • $11.49
  • 1x sold
  • + learn more
NICET Soils level 1 questions with correct answers
  • NICET Soils level 1 questions with correct answers

  • Exam (elaborations) • 9 pages • 2023
  • Available in package deal
  • Define C117 - Answer The determination of the amount of material finer than a 75-um (No.200) sieve What is the significance of C136? - Answer -To determine the grading of materials, -compliance of particle size distribution, -provide data for control of production of various aggregate -developing relationships concerning porosity and packing What procedure should always be used unless otherwise specified in c117? - Answer Procedure A What is an appropriate wetting agent to use...
    (0)
  • $12.49
  • 4x sold
  • + learn more
NICET LEVEL 1 QUESTIONS AND ANSWERS | UPDATED NEWEST
  • NICET LEVEL 1 QUESTIONS AND ANSWERS | UPDATED NEWEST

  • Exam (elaborations) • 6 pages • 2024
  • Available in package deal
  • NICET LEVEL 1 QUESTIONS AND ANSWERS | UPDATED NEWEST
    (0)
  • $11.99
  • + learn more
Nicet level 1 Questions and Answers Already Graded A
  • Nicet level 1 Questions and Answers Already Graded A

  • Exam (elaborations) • 16 pages • 2023
  • Nicet level 1 Questions and Answers Already Graded A Whats the maximum coverage area of any fire sprinkler? 225sqft NFPA 14 Standard for the Installation of Standpipe and Hose Systems NFPA 15 Standard for Water Spray Fixed Systems for Fire Protection When was OSHA founded and what does ti stand for? 1971 - the occupational safety and health administration OSHA part 1910? Applies to the general industry OSHA part 1926? Sets forth the safety and health standards under section 107 of the cont...
    (0)
  • $9.99
  • + learn more
NICET level 1 questions with correct answers
  • NICET level 1 questions with correct answers

  • Exam (elaborations) • 33 pages • 2023
  • Available in package deal
  • Whats the maximum coverage area of any fire sprinkler? 225sqft NFPA 14 Standard for the Installation of Standpipe and Hose Systems NFPA 15 Standard for Water Spray Fixed Systems for Fire Protection When was OSHA founded and what does ti stand for? 1971 - the occupational safety and health administration OSHA part 1910? Applies to the general industry OSHA part 1926? Sets forth the safety and health standards under section 107 of the contract work hours and safety standards act In gen...
    (0)
  • $14.99
  • + learn more
NICET Level 1 Questions And Answers Already Passed
  • NICET Level 1 Questions And Answers Already Passed

  • Exam (elaborations) • 14 pages • 2023
  • NICET Level 1 Questions And Answers Already Passed what is the maximum number of 14 AWG RHH conductors which can be installed in 1/2 rigid metal conduit? 4 wires Which of the following would be an appropriate mounting height for a pull station? 3.5'-48" to the actuator What is the minimum flash rate for a visible notification device? 1 flash per second What is the minimum mounting height for audible notification devices? 90" to the top of the device What is the minimum mounting...
    (0)
  • $9.99
  • + learn more