Project scope documents - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Project scope documents? On this page you'll find 1592 study documents about Project scope documents.

Page 2 out of 1.592 results

Sort by

COSC 275 Exam 1 Palmer Questions and Answers fully solved 2023
  • COSC 275 Exam 1 Palmer Questions and Answers fully solved 2023

  • Exam (elaborations) • 10 pages • 2023
  • COSC 275 Exam 1 Palmer Questions and Answers fully solved 2023 Estimating: The process of determining the anticipated cost of materials, labor, and equipment of a proposed project. Take-off: The process in which detailed lists are compiled, based on drawings and specifications, of all the material and equipment necessary to construct a project. The cost estimator uses this list to calculate how much it will cost to build the project. Quantities: Measured amounts of construction...
    (0)
  • $30.49
  • 3x sold
  • + learn more
Guidewire Associate Exam Questions and Answers 100% Solved
  • Guidewire Associate Exam Questions and Answers 100% Solved

  • Exam (elaborations) • 16 pages • 2023
  • Available in package deal
  • Guidewire Associate Exam Questions and Answers 100% Solved What are the four main areas of configuration in a Guidewire application? 1. User Interface 2. Data Model 3. Application Logic 4. Integration What are some of the technologies used in InsuranceSuite applications? Page Configuration Format (PCF) files Gosu (programming language) What are some reasons for a non-developer to understand the technology stack? To determine what data is stored and if new requirements need additional d...
    (0)
  • $9.99
  • 4x sold
  • + learn more
WGU C722 FINAL EXAM!!  Q&A – PROJECT MANAGEMENT (Guaranteed Score A+)
  • WGU C722 FINAL EXAM!! Q&A – PROJECT MANAGEMENT (Guaranteed Score A+)

  • Exam (elaborations) • 46 pages • 2023
  • WGU C722 FINAL EXAM!! Q&A – PROJECT MANAGEMENT (Guaranteed Score A+) Three essential drivers that must be achieved to generate positive characteristics in project teams *** Cohesiveness, Trust, Motivation The five stages Dr. Bruce Tuckman (1965) introduced of group development *** Forming, Storming, Norming, Performing, Adjorning Forming *** In this stage, team members may be meeting for the first time. Often, no one really knows much about anyone else on the team. It may be prematur...
    (0)
  • $12.99
  • 3x sold
  • + learn more
UA Local 469 Foreman Certification Practice Test 2024/2025 127 Questions with 100% Correct Answers
  • UA Local 469 Foreman Certification Practice Test 2024/2025 127 Questions with 100% Correct Answers

  • Exam (elaborations) • 13 pages • 2024
  • Available in package deal
  • UA Local 469 Foreman Certification Practice Test 2024/2025 127 Questions with 100% Correct Answers If a foreman from a different trade approaches you claiming that one of your crew members has been injured while working outside of his scope of work, what would be the FIRST action you should take? - Correct Answer Get the crew member medical attention. Which of the following is a true statement with respect to a foreman 's responsibility related to his or her crew? - Correct Answer The forem...
    (0)
  • $9.99
  • 1x sold
  • + learn more
Procore Final Exam Questions and Answers Already Passed
  • Procore Final Exam Questions and Answers Already Passed

  • Exam (elaborations) • 6 pages • 2023
  • Available in package deal
  • Procore Final Exam Questions and Answers Already Passed True or False: When you link an RFI to a drawing, you will see the drawing linked on the RFI's view page. T True or False: Punch List templates are only available for use on Procore's mobile application. T True or False: Observations can only be created using an observation template. F If you are tracking a folder (not a file), when will you receive an email notification from Procore? a. When a new file is added to the tracked folder ...
    (0)
  • $8.99
  • 3x sold
  • + learn more
Unit 9 - Assignment 1 - Investigating Project Management (Grade: Distinction)(Covers Criteria: P1, P2, M1, D1)
  • Unit 9 - Assignment 1 - Investigating Project Management (Grade: Distinction)(Covers Criteria: P1, P2, M1, D1)

  • Essay • 26 pages • 2023
  • This document received DISTINCTION covering aims: P1, P2, M1, and D1 in unit 9: Project Management in Pearson's BTEC level 3 course in Information Technology. Note: This document should ONLY be used for inspiration and all buyers should adhere to guidelines that are in place to avoid potential plagiarism. It covers various topics including, but not limited to: Basics of project management; scope and stages of project management. Project management structures; requirements(functional...
    (0)
  • $10.09
  • 2x sold
  • + learn more
APM PMQ Exam Revision Questions With Verified Answers
  • APM PMQ Exam Revision Questions With Verified Answers

  • Exam (elaborations) • 80 pages • 2023
  • Available in package deal
  • What are the five criteria for a successful project? - Answer Time, cost, quality, risk & benefits Project Management - Answer The application of processes, methods, knowledge, skills and experience to achieve the project objectives Programme Management - Answer The coordinated management of projects and change manage activities to achieve beneficial change Project Success - Answer The satisfaction of stakeholder needs measured by the success criteria as identified and agreed at the sta...
    (0)
  • $14.49
  • 1x sold
  • + learn more
CCMP Test 2023-2024 Questions & Answers 100% ACCURATE!!
  • CCMP Test 2023-2024 Questions & Answers 100% ACCURATE!!

  • Exam (elaborations) • 10 pages • 2023
  • What is included in the contract? - ANSWER-Anything that is referenced as part of the contract. Scope - ANSWER-Which core contract element addresses what the contract is about? When was the contract agreed? - ANSWER-Which of the following is NOT one of the four core elements of a contract? 1,3,4 - ANSWER-Which of the following may be incorporated into the contract? 1.) bid documents 3.) Letters, change orders and specifications. 4.) SOWs, SLAs, RFP, procedures and prices The bid, neg...
    (1)
  • $10.99
  • 1x sold
  • + learn more
RTPM Exam-264 Questions with 100% correct Answers
  • RTPM Exam-264 Questions with 100% correct Answers

  • Exam (elaborations) • 19 pages • 2023
  • 1. What are the two distinct processes of telecommunications project management? - ANSWER-design and implementation/instillation 2. List the nine project constraints. - ANSWER-Cost, time, quality, risk, resources, stakeholders, technology, safety, environment 3. In order for a project to run effectively and efficiently, the ICT professional should create a list of targeted objectives, identifying each _______________ as well as the _______________. - ANSWER-milestones, project's overall o...
    (0)
  • $10.39
  • 4x sold
  • + learn more
BICSI RTPM(solved)latest 2023
  • BICSI RTPM(solved)latest 2023

  • Exam (elaborations) • 28 pages • 2023
  • Available in package deal
  • BICSI RTPM(solved)latest 2023design and implementation/installation Telecommunications project management (TPM) typically consists of two distinct processes: Design PM Tasks Review expression of interest for client Perform a user needs analysis Perform site surveys and meet with client Generate preliminary design submittals Respond to/incorporate client comments Prepare final bid documents/RFP and engineer's cost estimate Issue final RFP package to client Client makes RFP availa...
    (1)
  • $22.99
  • 2x sold
  • + learn more