Ready mix concrete - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Ready mix concrete? On this page you'll find 200 study documents about Ready mix concrete.

Page 2 out of 200 results

Sort by

Concrete Flatwork Tech and Flatwork Finisher Exam Questions And Answers
  • Concrete Flatwork Tech and Flatwork Finisher Exam Questions And Answers

  • Exam (elaborations) • 14 pages • 2024
  • Available in package deal
  • Concrete Flatwork Tech and Flatwork Finisher Exam Questions And Answers (Ch. 1, #1) It is important that the _______ _______ read and understand project specifications - answerfinishing foreman (Ch. 1, #2) If the crew can place and finish 100yd^3 (m^3) of concrete per hour, the producer's rate should be about ____ yd^3(m^3) per hour. - answer100 (Ch 1, #3) True or False: Concrete is sold by the ton. - answerFalse (sold by volume) (Ch. 1, #4) Delays in discharging concrete trucks can resu...
    (0)
  • $12.49
  • + learn more
Cast-in-place, Pre-cast, and Prestressed concrete exam 2024 with 100% correct answers
  • Cast-in-place, Pre-cast, and Prestressed concrete exam 2024 with 100% correct answers

  • Exam (elaborations) • 5 pages • 2024
  • Cast-in-place concrete correct answersconcrete deposited, formed, cured, and finished in its final position on site as part of a structure; transported to the site in an unhardened state, primarily as ready-mix, and placed in forms Uses correct answers1. most foundations and slab-on-ground 2. walls, beams, columns, floors, roofs 3. large portions of bridges, pavements, and other infrastructure Traditional Forms correct answerstraditional concrete forming technique uses temporary forms, t...
    (0)
  • $16.99
  • + learn more
ACI Flatwork Questions & Answers | 100% Correct Answers | Verified | Latest 2024 Version
  • ACI Flatwork Questions & Answers | 100% Correct Answers | Verified | Latest 2024 Version

  • Exam (elaborations) • 9 pages • 2024
  • Available in package deal
  • It is important that the ____________ __________ read and understand project specifications. - finisher foreman If the crew can place and finish 100 yd3 of concrete per hour, the producer's delivery rate should be about _____ yd3 per hour. - 100 Concrete is sold by the ton? - False Delays in discharging concrete trucks can result in the concrete being hard to: - pump, place, and finish When there is room for two concrete trucks ready to discharge into a pump hopper, placement is faster ...
    (0)
  • $8.99
  • + learn more
ACI Flatwork Questions and Answers Latest Updated 2024
  • ACI Flatwork Questions and Answers Latest Updated 2024

  • Exam (elaborations) • 7 pages • 2024
  • ACI Flatwork Questions and Answers Latest Updated 2024 It is important that the ____________ __________ read and understand project specifications. finisher foreman If the crew can place and finish 100 yd3 of concrete per hour, the producer's delivery rate should be about _____ yd3 per hour. 100 Concrete is sold by the ton? False Delays in discharging concrete trucks can result in the concrete being hard to: pump, place, and finish When there is room for two con...
    (0)
  • $17.99
  • + learn more
Concrete Code Final UPDATED Exam  Questions and CORRECT Answers
  • Concrete Code Final UPDATED Exam Questions and CORRECT Answers

  • Exam (elaborations) • 6 pages • 2024
  • Concrete Code Final UPDATED Exam Questions and CORRECT Answers Water used to batch ready mix concrete shall be measured by? - Correct Answer- Weight or volume During initial curing, cylinders of 5000psi concrete shall be stored within a temperature range of _____? - Correct Answer- 60* F to 80* F Whenever strength tests are cast, what other tests should be performed? - Correct AnswerTemperature, slump, and air content
    (0)
  • $7.99
  • + learn more
Concrete Test 2024 Questions and Answers with complete solution
  • Concrete Test 2024 Questions and Answers with complete solution

  • Exam (elaborations) • 5 pages • 2024
  • Concrete Test 2024 Questions and Answers with complete solution What's the maximum time a concrete truck can wait after leaving the batch plant and still be poured? - Answer ️️ -90 minutes When should floor slabs be sawcut and how deep? - Answer ️️ -Sameday, 1/4 of the thickness of the slab The function of dowels at a construction joint is? - Answer ️️ -To prevent differential settlement of the slabs What is the maximum number of rotations of the drum of a ready mixed concret...
    (0)
  • $11.49
  • + learn more
NASCLA Test 2 questions & answers rated A+
  • NASCLA Test 2 questions & answers rated A+

  • Exam (elaborations) • 15 pages • 2023
  • NASCLA Test 2Slump Test- Used to measure the consistancy of concrete - correct answer Quality Concrete, chap 2 Air Entrainment concrete contains many microscopic bubbles - correct answer Quality Concrete, chapt 2 Seven day compression strength - correct answer Quality Concrete, chapt 2 Types of Portland Cement - correct answer Quality Concrete, chapt 2 fly ash - correct answer Quality Concrete, chapt 2 water-cement ratio (weight ratio) determines quality and durability - correct a...
    (0)
  • $17.99
  • + learn more
NASCLA Test 2 Advanced Test Guide Questions 2024.
  • NASCLA Test 2 Advanced Test Guide Questions 2024.

  • Exam (elaborations) • 15 pages • 2024
  • NASCLA Test 2 Advanced Test Guide Questions 2024. Slump Test- Used to measure the consistancy of concrete - correct answer Quality Concrete, chap 2 Air Entrainment concrete contains many microscopic bubbles - correct answer Quality Concrete, chapt 2 Seven day compression strength - correct answer Quality Concrete, chapt 2 Types of Portland Cement - correct answer Quality Concrete, chapt 2 fly ash - correct answer Quality Concrete, chapt 2 water-cement ratio (weight ratio) determi...
    (0)
  • $11.49
  • + learn more
Concrete Practice Test #1 Questions with 100% Verified Correct Answers
  • Concrete Practice Test #1 Questions with 100% Verified Correct Answers

  • Exam (elaborations) • 5 pages • 2024
  • Available in package deal
  • Concrete Practice Test #1 Questions with 100% Verified Correct Answers Lap splices shall not be used for bars larger than____? - Correct Answer #11 During transport of concrete test cylinders, the samples shall be.... - Correct Answer Cushioned to prevent damage from jarring For proper curing, concrete shall be maintained at a temperature above ____and in a moist condition for at least seven days, unless accelerated curing is used. - Correct Answer 50 degrees Tolerance for longitudinal...
    (0)
  • $9.49
  • + learn more
General contractor Practice Questions and Answers (100% Pass)
  • General contractor Practice Questions and Answers (100% Pass)

  • Exam (elaborations) • 34 pages • 2024
  • General contractor Practice Questions and Answers (100% Pass) In a post tensioned Beam what is the minimum size bar used to support the beam? - Answer️️ -#4 Bar What is the minimum height between finished floor and joist in the kitchen is 48" on center? - Answer️️ -7 FT How thick does a load bearing masonry need to be on a single story building? - Answer️️ -6 inches What chemical is used for high heat concrete - Answer️️ -retarder when mechanical equipment is on the roof...
    (0)
  • $12.49
  • + learn more