Nccco core 202 - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Nccco core 202? On this page you'll find 30 study documents about Nccco core 202.

Page 3 out of 30 results

Sort by

NCCCO CORE 2024 TEST QUESTIONS ALL ANSWERED
  • NCCCO CORE 2024 TEST QUESTIONS ALL ANSWERED

  • Exam (elaborations) • 9 pages • 2024
  • NCCCO CORE 2024 TEST QUESTIONS ALL ANSWERED Before leveling a mobile crane on outriggers, an operator should ensure: - ANSWERthere is no weight of the crane bearing on any tires Operating a mobile crane with a long boom, on uneven ground, what support condition should be considered? - ANSWER- Keeping 90 degree angle between cylinder rod and pad What is the primary purpose fir a rooster sheave or auxiliary boom point sheave? - ANSWER- Separate the boom hoist lines How many randomly brok...
    (0)
  • $9.29
  • + learn more
NCCCO CORE | Questions and Correct Solutions | Latest Update 2024/2025 | Graded A+
  • NCCCO CORE | Questions and Correct Solutions | Latest Update 2024/2025 | Graded A+

  • Exam (elaborations) • 13 pages • 2024
  • Available in package deal
  • NCCCO CORE | Questions and Correct Solutions | Latest Update 2024/2025 | Graded A+ Before leveling a mobile crane on outriggers, an operator should ensure: - Answer -there is no weight of the crane bearing on any tires Operating a mobile crane with a long boom, on uneven ground, what support condition should be considered? - Answer -Keeping 90 degree angle between cylinder rod and pad What is the primary purpose fir a rooster sheave or auxiliary boom point sheave? - Answer -Separate the...
    (0)
  • $11.99
  • + learn more
Nccco Core + Specialty Test Prep | Questions and Correct Solutions | Latest Update 2024/2025 | Graded A+
  • Nccco Core + Specialty Test Prep | Questions and Correct Solutions | Latest Update 2024/2025 | Graded A+

  • Exam (elaborations) • 16 pages • 2024
  • Available in package deal
  • Nccco Core + Specialty Test Prep | Questions and Correct Solutions | Latest Update 2024/2025 | Graded A+ ASME B30.5 - Answer -Mobile and Locomotive cranes, all types ASME B30.3 - Answer -Tower Cranes ASME B30.23 - Answer -Personel Lifting Regs OSHA 29 CFR 1926.1400 Series - Answer -Cranes & Derrick's used in Construction regs. Rotation Resistant Wire Rope - Answer -2 randomly broken wires in 6 diameters. 4 randomly broken wires in 30 diameters. Safety factor 5.0 Safety factor perso...
    (0)
  • $11.99
  • + learn more
NCCCO Core exam | Questions and Correct Solutions | Latest Update 2024/2025 | Graded A+
  • NCCCO Core exam | Questions and Correct Solutions | Latest Update 2024/2025 | Graded A+

  • Exam (elaborations) • 13 pages • 2024
  • Available in package deal
  • NCCCO Core exam | Questions and Correct Solutions | Latest Update 2024/2025 | Graded A+ A frequent inspection is: Daily to monthly 1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? Boom Up (Appendix A to Subpart CC of Part 1926--Standard Hand Signals) 2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross rating...
    (0)
  • $10.99
  • + learn more
NCCCO CORE 2024 TEST QUESTIONS ALL ANSWERED
  • NCCCO CORE 2024 TEST QUESTIONS ALL ANSWERED

  • Exam (elaborations) • 9 pages • 2024
  • NCCCO CORE 2024 TEST QUESTIONS ALL ANSWERED Before leveling a mobile crane on outriggers, an operator should ensure: - ANSWERthere is no weight of the crane bearing on any tires Operating a mobile crane with a long boom, on uneven ground, what support condition should be considered? - ANSWER- Keeping 90 degree angle between cylinder rod and pad What is the primary purpose fir a rooster sheave or auxiliary boom point sheave? - ANSWER- Separate the boom hoist lines How many randomly brok...
    (0)
  • $9.49
  • + learn more
NCCCO Core Exam Outline | Questions and Correct Answers | Latest Update 2024/2025 | Graded A+
  • NCCCO Core Exam Outline | Questions and Correct Answers | Latest Update 2024/2025 | Graded A+

  • Exam (elaborations) • 11 pages • 2024
  • Available in package deal
  • NCCCO Core Exam Outline | Questions and Correct Answers | Latest Update 2024/2025 | Graded A+ These materials should be used when setting up on soft surfaces such as soft ground, asphalt or backfilled material - Answer -Timber or steel On crawler cranes, which boom position creates the greatest ground pressure - Answer -Over the corner Allows the weight of the crane and load to be distributed over a greater surface area. Should be used under outrigger floats at all times. - Answer -Blo...
    (0)
  • $10.99
  • + learn more
NCCCO Core Exam | Practice Questions and Answers Graded A+ | 2024/2025 Guide
  • NCCCO Core Exam | Practice Questions and Answers Graded A+ | 2024/2025 Guide

  • Exam (elaborations) • 20 pages • 2024
  • NCCCO Core Exam | Practice Questions and Answers Graded A+ | 2024/2025 Guide NCCCO Core Exam | Practice Questions and Answers Graded A+ | 2024/2025 Guide NCCCO Core Exam | Practice Questions and Answers Graded A+ | 2024/2025 Guide
    (0)
  • $8.99
  • + learn more
NCCCO CORE 2024 TEST QUESTIONS ALL ANSWERED
  • NCCCO CORE 2024 TEST QUESTIONS ALL ANSWERED

  • Exam (elaborations) • 9 pages • 2024
  • NCCCO CORE 2024 TEST QUESTIONS ALL ANSWERED Before leveling a mobile crane on outriggers, an operator should ensure: - ANSWERthere is no weight of the crane bearing on any tires Operating a mobile crane with a long boom, on uneven ground, what support condition should be considered? - ANSWER- Keeping 90 degree angle between cylinder rod and pad What is the primary purpose fir a rooster sheave or auxiliary boom point sheave? - ANSWER- Separate the boom hoist lines How many randomly brok...
    (0)
  • $9.89
  • + learn more