Nicet - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Nicet? On this page you'll find 1372 study documents about Nicet.
Page 3 out of 1.372 results
Sort by
-
NICET HIGHWAY CONSTRUCTION LEVEL 3 EXAM 2024 | ALL QUESTIONS AND CORRECT ANSWERS | LATEST UPDATE
- Exam (elaborations) • 49 pages • 2024
-
- $20.99
- 1x sold
- + learn more
NICET HIGHWAY CONSTRUCTION LEVEL 3 EXAM 2024 | ALL QUESTIONS AND CORRECT ANSWERS | LATEST UPDATE
-
NICET LEVEL 1 HIGHWAY CONSTRUCTION EXAM QUESTIONS AND ANSWERS
- Exam (elaborations) • 10 pages • 2024
- Available in package deal
-
- $12.49
- 1x sold
- + learn more
NICET LEVEL 1 HIGHWAY CONSTRUCTION EXAM 
QUESTIONS AND ANSWERS 
Acceptance - Answer-The written acceptance by the Department of the Work. 
acceptance testing - Answer-Testing conducted by the Department to measure the 
degree of compliance to the Contract 
actual cost - Answer-The computed cost using calculations provided 
addendum - Answer-A Contract revision or response to a Contractor inquiry issued after 
advertisement and before the opening of bids. 
as-built quantity - Answer-The quantity ...
-
NICET Inspect & Test LVL 2 Exam Questions and Answers
- Exam (elaborations) • 7 pages • 2024
- Available in package deal
-
- $11.49
- 1x sold
- + learn more
NICET Inspect & Test LVL 2 Exam 
Questions and Answers 
While testing a fire alarm system at a correctional facility, it is determined that the 
general fire alarm signal requires human intervention to be initiated. This is permitted 
using a _____ feature? 
A. Pre signal 
B. Positive alarm sequence 
C. Manual initiation 
D. Alarm verification - Answer-A. Pre Signal 
NFPA 72 23.8.1.1.2(3)(a) 
Consider a 50′ x 50′ room with a 12′ ceiling. What is the minimum intensity required for a 
ceilin...
-
NICET Highway Construction Inspector Level III Practice Exam 1 (56 passed new update questions and answers)
- Exam (elaborations) • 16 pages • 2024
-
Available in package deal
-
- $8.99
- 1x sold
- + learn more
NICET Highway Construction Inspector Level III Practice Exam 1 (56 passed new update questions and answers) 
During installation of traffic loops in the pavement, which three statements apply prior to and during the installation of loop wire? (Choose 3). 
 
a)	Do not allow vehicular traffic over an open saw cut. 
b)	Do not overlap saw cuts at the corner. 
c)	Thoroughly clean the saw cut of foreign material. 
d)	Use a plastic sleeve where loop wire crosses a joint.
-
NICET Practice Fire Alarm Systems Level III practice exam with complete questions and answers.
- Exam (elaborations) • 30 pages • 2024
-
- $12.49
- 1x sold
- + learn more
NICET Practice Fire Alarm Systems Level III practice exam with complete questions and answers.
And that's how you make extra money
-
Nicet Level 2: Concrete Exam Questions and Answers 2024
- Exam (elaborations) • 6 pages • 2024
- Available in package deal
-
- $11.49
- 1x sold
- + learn more
Nicet Level 2: Concrete Exam Questions and Answers 2024 
What is the testing frequency for concrete? - Answer-every 50 yards 
When should you take cylinder samples? - Answer-Every 100 yards 
What are the components on a batch ticket? - Answer-1. Ticket Number 
2. Plant 
3. Project Number 
4. Mix ID 
5. Time of Batch 
6. Time arrival 
7. Time Discharge 
8. Time Completed 
9. Mix proportions 
When should concrete samples should not be taken? - Answer-Before 10% and 90% of 
truck has been discharge...
-
NICET Fire Alarm Systems Level 1 Study Guide Q/A Updated.
- Other • 15 pages • 2023
-
- $8.49
- 2x sold
- + learn more
NICET Fire Alarm Systems Level 1 Study Guide 
Nicet level 1 Study Guide questions and answers.
-
Nicet Level 1 water-based systems Practice Exam Questions and Answers 100% Pass
- Exam (elaborations) • 5 pages • 2024
- Available in package deal
-
- $11.49
- 1x sold
- + learn more
Nicet Level 1 water-based systems Practice Exam 
Questions and Answers 100% Pass 
What is a purpose of a control valve - Answer-Control Flow to water based fire 
protection system 
The gauge on the quick opening device shall indicate _____ as compared to the gauge 
on the system side of the dry pipe valve? - Answer-the same pressure 
What type of test shall be provided when a valve is returned to service to determine that 
the valve is open? - Answer-Valve status test 
What is a fire service mai...
-
NICET Level 2 NFPA 25: Standard for Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems Exam 2024
- Exam (elaborations) • 5 pages • 2024
- Available in package deal
-
- $11.49
- 1x sold
- + learn more
NICET Level 2 NFPA 25: Standard for 
Inspection, Testing, and Maintenance 
of Water-Based Fire Protection 
Systems Exam 2024 
Chapter 1 - Answer-Administration 
Chapter 2 - Answer-Referenced Publications (Other NFPA Standards) 
Chapter 3 - Answer-Definitions 
Chapter 4 - Answer-General Requirements (Owner's Chapter) 
Chapter 5 - Answer-Sprinkler Systems (Heads, Hangers, Waterflow Alarm Devices, AF 
Systems, Dry Pipe Systems) 
Chapter 6 - Answer-Standpipe & Hose Systems 
Chapter 7 - Answer-Hydra...
-
NICET Level 2 ITM of Water Based Systems | 155 Questions with 100% Correct Answers | Verified | Latest Update 2024
- Exam (elaborations) • 14 pages • 2023
-
- $15.49
- 2x sold
- + learn more
When placing a LOTO on a system, how many locks should be applied? - As many locks as their are 
personnel working on the system. 
A ladder must be able to support ____ times the weight of the expected load - 3.3 
It is acceptable to enter into a confined space without an attendant, but only if all other precautions and 
PPE are taken. - False 
A defective air pressure gauge on the supply air of a dry pipe system is considered a _____ - Critical 
deficiency 
When taking a sprinkler system out of...
Did you know that on average a seller on Stuvia earns $82 per month selling study resources? Hmm, hint, hint. Discover all about earning on Stuvia