COSC 153 correct QUESTIONS & ANSWERS
- Exam (elaborations) • 3 pages • 2024
-
Available in package deal
-
- $9.99
- + learn more
How many subcontractors and sub-subcontractors are there typically? - ANSWER 10-50 
 
What is crucial about subcontractor coordination? - ANSWER The scope of services 
 
What are a necessary requirement for communication? - ANSWER Meetings
-
COSC 153 Chapter 8 QUESTIONS & ANSWERS(RATED A)
- Exam (elaborations) • 3 pages • 2024
-
Available in package deal
-
- $9.99
- + learn more
What is a construction estimate? - ANSWER Summary of probable quantities and costs of materials, labor, equipment, and subcontracts to complete a project, including taxes, overhead, and profit, based on the best available information at the time. 
 
Name the four primary categories of costs in the construction estimate. - ANSWER Materials, labor, equipment, and subcontracts. 
 
How are construction estimates typically organized? - ANSWER 1995 CSI Master Format, which utilizes 16 divisions, or t...
-
COSC 153 Chapter 7 QUESTIONS & ANSWERS(RATED A)
- Exam (elaborations) • 3 pages • 2024
-
Available in package deal
-
- $9.99
- + learn more
When does the pre-construction phase take place? - ANSWER Before design is complete and construction begins. 
 
What are three ways owners can benefit from alternative project delivery methods? - ANSWER Low cost, high quality, innovation. 
 
Define pre-construction services - ANSWER Evaluation activities that occur before construction begins, often during the design phase when at-risk CM or design-build is employed as the project delivery method.
-
COSC 153 Chapters 5-7(solved 2025).
- Exam (elaborations) • 5 pages • 2024
-
- $13.99
- + learn more
COSC 153 Chapters 5-7(solved 2025).
-
COSC 153 Chapter 5 LATEST UPDATE 2024 CORRECT 100%
- Exam (elaborations) • 2 pages • 2024
-
Available in package deal
-
- $9.99
- + learn more
Name the four fundamental stages of the construction management process after the design stage. - ANSWER Pre-construction, procurement, construction, and post-construction. 
 
What are the four distinct stages of the design process? - ANSWER Programming and feasibility, schematic or conceptual design, design development, and contract documents.
Make study stress less painful
-
COSC 153 Chapter 10 QUESTIONS & CORRECT SOLUTIONS(GRADED A)
- Exam (elaborations) • 2 pages • 2024
-
Available in package deal
-
- $9.99
- + learn more
Identify at least three issues that the superintendent must be concerned with when trying to manage construction operations. - ANSWER Subcontractor coordination, material and equipment deliveries, and productivity. 
 
When scheduling subcontractors for the job, you should try to follow three fundamental rules. What are they? - ANSWER To resist bringing subcontractors onto the job until you are 100 percent ready for them; to make sure that once you bring them on the job, they have everything they...
-
COSC 153 Chapter 14 fully solved & updated(passed).
- Exam (elaborations) • 3 pages • 2024
-
- $14.99
- + learn more
COSC 153 Chapter 14 fully solved & updated(passed).
-
COSC 153 Chapter 10 fully solved & updated(passed)
- Exam (elaborations) • 0 pages • 2024
-
- $15.49
- + learn more
COSC 153 Chapter 10 fully solved & updated(passed)
Study stress? For sellers on Stuvia, these are actually golden times. KA-CHING! Earn from your study resources too and start uploading now. Discover all about earning on Stuvia