NERC Final Assessment Exam Correct answers (Already GRADED A)
- Tentamen (uitwerkingen) • 98 pagina's • 2023
-
Ook in voordeelbundel
-
ProfGoodlucK
-
- $10.89
- 1x verkocht
- + meer info
When using a dynamic schedule and the energy profile in an hour is >250 MW and the actual hourly integration deviates from the hourly energy profile by ____ the tag must be modified. 
A. 100 MW 
B. 10% 
C. 50 MW 
D. 25% 
B. 10% 
 
 
Dry steam plants, flash steam plants, and binary cycle power plants are the three main types of what kind of generating plant? 
A. Nuclear generators 
B. Combustion turbine generators 
C. Geothermal generators 
D. Hydroelectric generators 
C. Geothermal generators...

-
NERC Prep - Bal, Int, & Trans Exam Questions and Answers 2023-2024 Graded A+
- Tentamen (uitwerkingen) • 22 pagina's • 2023
-
Ook in voordeelbundel
-
STUDYLAB2023
-
- $15.49
- 2x verkocht
- + meer info
NERC Prep - Bal, Int, & Trans Exam Questions and Answers Graded A+. What group can approve a change in the 
Disturbance Recovery Period for an Interconnection? 
a. NERC Interconnection Working Group 
b. NERC Operating Committee 
c. NERC Regional Council 
d. NERC Disturbance Analysis Working Group 
c. Check targets and equipment - What is the first thing an operator should do after 
a relay operation? 
a. Check power system stabilizers 
b. Notify adjacent Transmission and Balancing areas 
c. Che...

-
NERC EXAM QUESTIONS WITH COMPLETE SOLUTIONS.
- Tentamen (uitwerkingen) • 7 pagina's • 2024
-
techgrades
-
- $11.49
- + meer info
NERC EXAM QUESTIONS WITH COMPLETE SOLUTIONS. 
 
 
 
 
 
A Balancing Authority notices that Operating Reserve has steadily declined throughout the hour. What is the most likely cause? 
 
a) Loss of a large generator in the area 
b) An inaccurate load forecast 
c) Loss of a major transmission line 
d) A malfunction of EMS - correct answer.b) An inaccurate load forecast 
 
Balancing Area A notices that the Interconnection frequency is 59.94 Hz and their ACE is 0. Which of the following could be th...
![2023 AQA GCSE COMBINED SCIENCE: SYNERGY 8465/3F Foundation Tier Paper 3 Physical Sciences Question Paper & Mark scheme (Merged) June 2023 [VERIFIED]](/docpics/5302280/6643c258a7894_5302280_121_171.jpeg)
-
2023 AQA GCSE COMBINED SCIENCE: SYNERGY 8465/3F Foundation Tier Paper 3 Physical Sciences Question Paper & Mark scheme (Merged) June 2023 [VERIFIED]
- Tentamen (uitwerkingen) • 82 pagina's • 2024
- Ook in voordeelbundel
-
Kimmey
-
- $7.99
- + meer info
2023 AQA GCSE COMBINED SCIENCE: SYNERGY 8465/3F Foundation Tier Paper 
3 Physical Sciences Question Paper & Mark scheme (Merged) June 2023 [VERIFIED] 
Friday 9 June 2023 Afternoon Time allowed: 1 hour 45 minutes 
Materials 
For this paper you must have: 
a ruler 
a protractor 
a scientific calculator 
the periodic table (enclosed) 
the Physics Equations Sheet (enclosed). 
Instructions 
Use black ink or black ball-point pen. Pencil should only be used for drawing. 
Fill in the boxes at the top o...

-
NERC question questions with correct answers
- Tentamen (uitwerkingen) • 13 pagina's • 2023
- Ook in voordeelbundel
-
cracker
-
- $16.49
- + meer info
Two phase conductors of a 138kV transmission line come in contact due to a storm, creating a phase to phase fault. The distance relay at each end of the line tripped and isolated the line. What two measured parameters of the line caused the distance relay to operate? 
 
Temperature and length 
MWs and MVARs 
Voltage and current 
Resistance and Impedance CORRECT ANSWER Voltage and current 
 
What is the main cause for having low voltage on the Transmission and Distribution system? 
 
Over gener...

-
PJM Practice Exam 2024 Questions and Answers
- Tentamen (uitwerkingen) • 9 pagina's • 2024
-
BrittieDonald
-
- $12.49
- + meer info
PJM Practice Exam 2024 Questions and Answers 
Real time transmission constraints or contingencies may be alleviated with generators 
operating________. A. below 60 Hz. B. on a new price curve. C. on a new cost curve. 
D. off cost (out of merit). - Correct Answer ️️ -off cost (out of merit) 
What is the minimum size for a solar park to be required to have real and reactive 
power 
telemetry? A. 1 MW. B. 3 MW C. 5 MW D. 7 MW - Correct Answer ️️ -3 MW 
PJM calls for which of the following t...

-
PJM Practice Exam 2024 Questions and Answers
- Tentamen (uitwerkingen) • 9 pagina's • 2024
- Ook in voordeelbundel
-
EmilyCharlene
-
- $12.49
- + meer info
PJM Practice Exam 2024 Questions and Answers 
Real time transmission constraints or contingencies may be alleviated with generators 
operating________. A. below 60 Hz. B. on a new price curve. C. on a new cost curve. 
D. off cost (out of merit). - Correct Answer ️️ -off cost (out of merit) 
What is the minimum size for a solar park to be required to have real and reactive 
power 
telemetry? A. 1 MW. B. 3 MW C. 5 MW D. 7 MW - Correct Answer ️️ -3 MW 
PJM calls for which of the following t...

-
NERC EXAM QUESTIONS WITH VERIFIED ANSWERS
- Tentamen (uitwerkingen) • 11 pagina's • 2024
- Ook in voordeelbundel
-
Exampool
-
- $11.99
- + meer info
A Balancing Authority notices that Operating Reserve has steadily declined throughout the hour. What is the most likely cause? 
 
a) Loss of a large generator in the area 
b) An inaccurate load forecast 
c) Loss of a major transmission line 
d) A malfunction of EMS - Answer b) An inaccurate load forecast 
 
Balancing Area A notices that the Interconnection frequency is 59.94 Hz and their ACE is 0. Which of the following could be the cause of this reading? 
 
a) A net under-generation in Balancin...

-
NERC book quiz| 157 questions| WITH COMPLETE SOLUTIONS
- Tentamen (uitwerkingen) • 12 pagina's • 2024
- Ook in voordeelbundel
-
AdelineJean
-
- $8.99
- + meer info
NERC book quiz| 157 questions| WITH COMPLETE 
SOLUTIONS 
You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due to a 
large loss of load in the contingent BA. If your generator governor control systems responded to the 
frequency deviation approximately how much of a generation change would you BA experience? - 
Answer --4MW 
Net actual interchange minus Net scheduled interchange is what? - Answer -Inadvertent interchange 
Suppose your interconnection oper...

-
NERC Post Assessment Actual Final Exam Questions with all Questions Accurately Answered 2023/2024
- Tentamen (uitwerkingen) • 116 pagina's • 2024
-
Ook in voordeelbundel
-
KieranKent55
-
- $11.99
- + meer info
NERC Post Assessment Actual Final Exam Questions with all Questions Accurately Answered 2023/2024 
 
Auto-load - correct answer a feature on some generators that automatically moves the generator to a target load (mw) level. 
 
Automatic generation control (agc) - correct answer equipment that automatically adjusts generation in a balancing authority area from a central location to maintain the balancing authority's interchange schedule plus frequency bias. Agc may also accommodate automa...