Mw over generating - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Mw over generating? On this page you'll find 76 study documents about Mw over generating.

All 76 results

Sort by

NERC Prep - Bal, Int, & Trans Exam Questions and Answers 2023-2024 Graded A+ Popular
  • NERC Prep - Bal, Int, & Trans Exam Questions and Answers 2023-2024 Graded A+

  • Exam (elaborations) • 22 pages • 2023
  • NERC Prep - Bal, Int, & Trans Exam Questions and Answers Graded A+. What group can approve a change in the Disturbance Recovery Period for an Interconnection? a. NERC Interconnection Working Group b. NERC Operating Committee c. NERC Regional Council d. NERC Disturbance Analysis Working Group c. Check targets and equipment - What is the first thing an operator should do after a relay operation? a. Check power system stabilizers b. Notify adjacent Transmission and Balancing areas c. Che...
    (0)
  • $15.49
  • 1x sold
  • + learn more
NERC Final Assessment Exam Correct answers (Already GRADED A) Popular
  • NERC Final Assessment Exam Correct answers (Already GRADED A)

  • Exam (elaborations) • 98 pages • 2023 Popular
  • When using a dynamic schedule and the energy profile in an hour is >250 MW and the actual hourly integration deviates from the hourly energy profile by ____ the tag must be modified. A. 100 MW B. 10% C. 50 MW D. 25% B. 10% Dry steam plants, flash steam plants, and binary cycle power plants are the three main types of what kind of generating plant? A. Nuclear generators B. Combustion turbine generators C. Geothermal generators D. Hydroelectric generators C. Geothermal generators...
    (1)
  • $11.99
  • 1x sold
  • + learn more
NERC question questions with correct answers
  • NERC question questions with correct answers

  • Exam (elaborations) • 13 pages • 2023
  • Available in package deal
  • Two phase conductors of a 138kV transmission line come in contact due to a storm, creating a phase to phase fault. The distance relay at each end of the line tripped and isolated the line. What two measured parameters of the line caused the distance relay to operate? Temperature and length MWs and MVARs Voltage and current Resistance and Impedance CORRECT ANSWER Voltage and current What is the main cause for having low voltage on the Transmission and Distribution system? Over gener...
    (0)
  • $16.49
  • + learn more
2023 AQA GCSE COMBINED SCIENCE: SYNERGY 8465/3F Foundation Tier Paper 3 Physical Sciences Question Paper & Mark scheme (Merged) June 2023 [VERIFIED]
  • 2023 AQA GCSE COMBINED SCIENCE: SYNERGY 8465/3F Foundation Tier Paper 3 Physical Sciences Question Paper & Mark scheme (Merged) June 2023 [VERIFIED]

  • Exam (elaborations) • 82 pages • 2024
  • Available in package deal
  • 2023 AQA GCSE COMBINED SCIENCE: SYNERGY 8465/3F Foundation Tier Paper 3 Physical Sciences Question Paper & Mark scheme (Merged) June 2023 [VERIFIED] Friday 9 June 2023 Afternoon Time allowed: 1 hour 45 minutes Materials For this paper you must have: a ruler a protractor a scientific calculator the periodic table (enclosed) the Physics Equations Sheet (enclosed). Instructions Use black ink or black ball-point pen. Pencil should only be used for drawing. Fill in the boxes at the top o...
    (1)
  • $7.99
  • + learn more
NERC book quiz Questions and Answers (100% Correct Elaborations)
  • NERC book quiz Questions and Answers (100% Correct Elaborations)

  • Exam (elaborations) • 29 pages • 2023
  • You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due to a large loss of load in the contingent BA. If your generator governor control systems responded to the frequency deviation approximately how much of a generation change would you BA experience? -4MW Net actual interchange minus Net scheduled interchange is what? Inadvertent interchange Suppose your interconnection operators at 59.97 Hz from one minute after midnight to noon and operate a...
    (0)
  • $10.49
  • + learn more
NERC FINAL EXAM QUESTIONS WITH CORRECT AND VERIFIED ANSWERS | LATEST UPDATE GRADED A+ (2023/2024)
  • NERC FINAL EXAM QUESTIONS WITH CORRECT AND VERIFIED ANSWERS | LATEST UPDATE GRADED A+ (2023/2024)

  • Exam (elaborations) • 13 pages • 2023
  • NERC FINAL EXAM QUESTIONS WITH CORRECT AND VERIFIED ANSWERS | LATEST UPDATE GRADED A+ (2023/2024). Your ACE is a large negative value and system frequency is 59.80 Hz. Your AGC system is pulsing your units down. What should you do? a) Place AGC in flat frequency control b) Place AGC in flat tie line control c) Suspend AGC and investigate d) Do nothing as this is normal - c) Suspend AGC and investigate When two identical generating units are operated in parallel on governor control, and on...
    (0)
  • $19.49
  • + learn more
SOS NERC Prep - RElIABILITY Exam| 200 QUESTIONS AND ANSWERS | GRADED A
  • SOS NERC Prep - RElIABILITY Exam| 200 QUESTIONS AND ANSWERS | GRADED A

  • Exam (elaborations) • 109 pages • 2023
  • The Reliability Coordinator just informed you of a slow time error correction which will begin at the top of the next hour. Your EMS system will not let you change your scheduled frequency. Your Frequency Bias Setting is -100 MW/.1Hz. What action should you take? A) Increase Net Interchange Schedule by 20 MWs. B) Inform the Reliability Coordinator that you cannot participate in the time error correction. C) Decrease Net Interchange Schedule by 20 MWs. D) Increase Net Interchange Sche...
    (0)
  • $11.99
  • + learn more
PJM Practice Exam 2024 Questions and Answers
  • PJM Practice Exam 2024 Questions and Answers

  • Exam (elaborations) • 9 pages • 2024
  • PJM Practice Exam 2024 Questions and Answers Real time transmission constraints or contingencies may be alleviated with generators operating________. A. below 60 Hz. B. on a new price curve. C. on a new cost curve. D. off cost (out of merit). - Correct Answer ️️ -off cost (out of merit) What is the minimum size for a solar park to be required to have real and reactive power telemetry? A. 1 MW. B. 3 MW C. 5 MW D. 7 MW - Correct Answer ️️ -3 MW PJM calls for which of the following t...
    (0)
  • $12.49
  • + learn more
PJM Practice Exam 2024 Questions and Answers
  • PJM Practice Exam 2024 Questions and Answers

  • Exam (elaborations) • 9 pages • 2024
  • Available in package deal
  • PJM Practice Exam 2024 Questions and Answers Real time transmission constraints or contingencies may be alleviated with generators operating________. A. below 60 Hz. B. on a new price curve. C. on a new cost curve. D. off cost (out of merit). - Correct Answer ️️ -off cost (out of merit) What is the minimum size for a solar park to be required to have real and reactive power telemetry? A. 1 MW. B. 3 MW C. 5 MW D. 7 MW - Correct Answer ️️ -3 MW PJM calls for which of the following t...
    (0)
  • $12.49
  • + learn more
 NERC EXAM QUESTIONS WITH VERIFIED ANSWERS
  • NERC EXAM QUESTIONS WITH VERIFIED ANSWERS

  • Exam (elaborations) • 11 pages • 2024
  • Available in package deal
  • A Balancing Authority notices that Operating Reserve has steadily declined throughout the hour. What is the most likely cause? a) Loss of a large generator in the area b) An inaccurate load forecast c) Loss of a major transmission line d) A malfunction of EMS - Answer b) An inaccurate load forecast Balancing Area A notices that the Interconnection frequency is 59.94 Hz and their ACE is 0. Which of the following could be the cause of this reading? a) A net under-generation in Balancin...
    (0)
  • $11.99
  • + learn more