Osh 4308 - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Osh 4308? On this page you'll find 3 study documents about Osh 4308.

All 3 results

Sort by

Unit  V  Journal.docx   OSH 4308  Unit V Journal  Columbia Southern University  Advanced Concepts in Environmental Safety Management (OSH 4308)   Unit V Journal  An environment in which I have experienced potential thermal stressors is on a construction s
  • Unit V Journal.docx OSH 4308 Unit V Journal Columbia Southern University Advanced Concepts in Environmental Safety Management (OSH 4308) Unit V Journal An environment in which I have experienced potential thermal stressors is on a construction s

  • Summary • 2 pages • 2021
  • Unit V J OSH 4308 Unit V Journal Columbia Southern University Advanced Concepts in Environmental Safety Management (OSH 4308) Unit V Journal An environment in which I have experienced potential thermal stressors is on a construction site, during the mid-summer months in Orlando, Florida. The workers on the construction site are exposed to an extremely hot environment, high humidity levels, and a variety of potential heat-related injuries. These workers are required to be in long pants...
    (0)
  • $7.49
  • + learn more
Advanced Concepts Unit II Project Advanced Concepts Unit II Project
  • Advanced Concepts Unit II Project

  • Essay • 6 pages • 2022
  • Acme has a foundry room, which is nearing the point of being outdated in terms of engineering controls. For example, one employee stands near an operation that has a canopy hood exhaust and routinely puts his face in the flow of the hood, causing him to inhale particulates and gases that are directly being drawn into the hood. Part of your evaluation is to make a recommendation for a new type of exhaust system. Which one would you recommend, and why? Respond to the details in each section, a...
    (0)
  • $40.49
  • + learn more
OSH  4308  UNIT  VI  Cynthia  Lawrence .docx   OSH 4308  UNIT VI PROJECT  Columbia Southern University OSH 4308-15D+5B21-S1  ACME Manufacturing has requested a hydrostatics and hydraulics report to show the piping and repairs needed to show the pressure a
  • OSH 4308 UNIT VI Cynthia Lawrence .docx OSH 4308 UNIT VI PROJECT Columbia Southern University OSH 4308-15D+5B21-S1 ACME Manufacturing has requested a hydrostatics and hydraulics report to show the piping and repairs needed to show the pressure a

  • Summary • 3 pages • 2021
  • OSH 4308 UNIT VI Cynthia Lawrence .docx OSH 4308 UNIT VI PROJECT Columbia Southern University OSH 4308-15D+5B21-S1 ACME Manufacturing has requested a hydrostatics and hydraulics report to show the piping and repairs needed to show the pressure and velocity of fluids which presently exist in the tank. This will help ACME to head any loss in their fire suppression system. It is imperative that both the piping and tank receive repairs as they need such. The plans to make these repairs is ...
    (0)
  • $7.49
  • + learn more