Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

ASSE 15000 Practice Test 3 || with Accurate Answers 100%.

Beoordeling
-
Verkocht
1
Pagina's
9
Cijfer
A+
Geüpload op
13-10-2024
Geschreven in
2024/2025

High priming water levels can adversely affect the operation of supervisory air. What is not a step in testing the water level? correct answers Close the priming level test valve before air discharges The _____ valve shall be supervised closed in the pipeline to the hose valve header correct answers control A diesel fuel storage tank is required to always be a minimum of __ full. correct answers 2/3 A fire pump controller shall be in a fully functional state within ___ seconds of AC power available. correct answers 10 The standpipe system demand shall include 500 gpm for the first standpipe and ___ gpm for each additional standpipe until the total system demand is simultaneously met. correct answers 250 Water motor gongs and pressure switch alarm devices shall be inspected: correct answers quarterly A temporary standpipe used during construction must be at least ___ in diameter correct answers 4 inches Blue color coding on a sprinkler indicates it has a temperature rating between _____. correct answers 250 - 300 degrees F When swapping out pressure gauges, it is important to verify the arrow on the 3-way valve is pointed in the proper direction before removing the gauge and once the gauge is removed, the 3-way valve must be flushed adequately so any debris that may have accumulated does not end up in the new gauge. correct answers True According to NFPA 20, a _____ refill valve shall be used for each water supply tank used for fire protection. correct answers automatic All sprinkler pressure-reducing valves shall be inspected qurterly to verify the valves are in the following condition except: correct answers in the closed position Which type of pipe is not approved for standpipes correct answers CPVC Foam concentrate strainers shall be inspected: correct answers quarterly A fire pump water supply must be ___. correct answers Adequate and dependable The shut-off head shall not exceed ___ of rated head for any pump. correct answers 140%

Meer zien Lees minder
Instelling
ASSE 15000
Vak
ASSE 15000

Voorbeeld van de inhoud

ASSE 15000 Practice Test 3 || with Accurate Answers 100%.
High priming water levels can adversely affect the operation of supervisory air. What is not a
step in testing the water level? correct answers Close the priming level test valve before air
discharges

The _____ valve shall be supervised closed in the pipeline to the hose valve header correct
answers control

A diesel fuel storage tank is required to always be a minimum of __ full. correct answers 2/3

A fire pump controller shall be in a fully functional state within ___ seconds of AC power
available. correct answers 10

The standpipe system demand shall include 500 gpm for the first standpipe and ___ gpm for each
additional standpipe until the total system demand is simultaneously met. correct answers 250

Water motor gongs and pressure switch alarm devices shall be inspected: correct answers
quarterly

A temporary standpipe used during construction must be at least ___ in diameter correct answers
4 inches

Blue color coding on a sprinkler indicates it has a temperature rating between _____. correct
answers 250 - 300 degrees F

When swapping out pressure gauges, it is important to verify the arrow on the 3-way valve is
pointed in the proper direction before removing the gauge and once the gauge is removed, the 3-
way valve must be flushed adequately so any debris that may have accumulated does not end up
in the new gauge. correct answers True

According to NFPA 20, a _____ refill valve shall be used for each water supply tank used for
fire protection. correct answers automatic

All sprinkler pressure-reducing valves shall be inspected qurterly to verify the valves are in the
following condition except: correct answers in the closed position

Which type of pipe is not approved for standpipes correct answers CPVC

Foam concentrate strainers shall be inspected: correct answers quarterly

A fire pump water supply must be ___. correct answers Adequate and dependable

The shut-off head shall not exceed ___ of rated head for any pump. correct answers 140%

, The top hose outlet in a buuilding under construction must be maintained within _____ floors of
the highest forms, staging and similar combustibles at all times. correct answers one

The drain riser shall be equipped with tees that are of the same size as the discharge outlets of the
___ devices to be tested and shall be located at least every other floor. correct answers pressure
regulating

What is the minimum suction pressure required at the pump suction flange when a suction tank is
installed at or above the base of the fire pump running at 150% capacity? correct answers -3

What type of standpipe is not required to be hydrostatically tested at 200 psi or 50 psi in excess
of 150 psi? correct answers manual standpipe

When soldering copper, flux should be applied to ___. correct answers the inside of the fitting
and the outside of the tube

Alternate power, as it pertains to fire pumps, is defined as a power source that is _____> correct
answers reliable and independent of the primary power supply

What percentage of deviation from recorded foam acceptance test specs requires immediate
discussion with the foam manufacturer? correct answers 10 percent

Where installed, circulation relief valves _____. correct answers shall be inspected on the same
frequency as the no-flow (churn) test

A ___ shall be installed where an electric variable speed pressure limiting controller is installed
and the maximum total discharge head, adjusted for elevation, exceeds the pressure of the system
components. correct answers pressure relief valve

A _____ standpipe is used in a high rise building exposed to freezing temperatures. correct
answers class I automatic dry

According to NFPA 20, what are the pressure requirements for the discharge components of a
fire pump? correct answers Maximum total discharge head psi at shutoff and rated speed.

Samples of foam concentrates shall be sent to the ____ or qualified laboratory for quality
condition testing at the frequency recommended by the manufacturer. correct answers
manufacturer

The objective of NFPA 13R is to allow ___ minutes for occupants to escape in case of fire.
correct answers 30

A main drain shall be provided on the standpipe _____ side of the conrol valve. correct answers
system

Geschreven voor

Instelling
ASSE 15000
Vak
ASSE 15000

Documentinformatie

Geüpload op
13 oktober 2024
Aantal pagina's
9
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$11.79
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
SirAnton NURSING, ECONOMICS, MATHEMATICS, BIOLOGY, AND HISTORY MATERIALS BEST TUTORING, HOMEWORK HELP, EXAMS, TESTS, AND STUDY GUIDE MATERIALS WITH GUARANTEED A+ I am a dedicated medical practitioner with diverse knowledge in matters
Bekijk profiel
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
770
Lid sinds
3 jaar
Aantal volgers
438
Documenten
38480
Laatst verkocht
1 dag geleden
Reign Supreme Scholarly || Enlightened.

Get your revised study materials available here and elevate your educational outcomes. I have numerous verified learning materials (Research, Exams Questions and answers, Assignments, notes etc) for different courses guaranteed to boost your academic results. I am dedicated to offering you the best and unique learning content. You are encouraged to inquire further assistance from this end whenever need be. Kindly remember to leave your review, understanding your satisfaction is essential . We highly appreciate clients who always come back for more of the study content we offer, you are extremely valued. All the best.

Lees meer Lees minder
3.7

115 beoordelingen

5
49
4
20
3
22
2
8
1
16

Populaire documenten

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen