QUESTIONS WITH SOLUTIONS
ALREADY PASSED!
RWPCR 1 - ANSWER ✔ Rail Operations Control Center (ROCC)
shall
never authorize train or equipment movement in the opposite direction
of normal traffic flow without confirmation of clear track.
RWPCR 2 - ANSWER ✔ There shall be a dedicated
Watchman/Lookout anytime there is equipment movement within any
work zone or when work is conducted on an "active" revenue track.
RWPCR 3 - ANSWER ✔ There shall be no fouling of the Authority
Roadway unless it is ABSOLUTELY necessary to perform your job.
RWPCR 4 - ANSWER ✔ All employees, regardless of rank or title,
shall be RWP trained and qualified before entering the Authority
Roadway.
RWPCR 5 - ANSWER ✔ Employees shall expect, and be vigilant of,
train or equipment movement in all directions at all times.
RWPCR 6 - ANSWER ✔ There shall be no clearing of workers or
equipment to any track at any time.
RWPCR 7 - ANSWER ✔ Rail Roadway Maintenance Machines
(RMM) shall not operate at speeds more than 5 mph within any working
limits and shall be prepared to stop within ½ the range of visibility, be
on the lookout for Roadway workers, obstructions, broken rail and
misaligned switches.