100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Stationary/Ohio/Boiler Operator Engineer Electric Exam Questions with 100% Correct Answers (A+ Graded) CA$55.17   Add to cart

Package deal

Stationary/Ohio/Boiler Operator Engineer Electric Exam Questions with 100% Correct Answers (A+ Graded)

Upstationary Grade 3 Engineering License Questions with 100% Correct Answers MD Stationary Engineer Questions with 100% Correct Answers Boiler Operator/ Stationary Steam Engineer Exam Questions with Correct Answers NYC High Pressure Boiler License Questions with Correct Answers Stationary Engineer ...

[Show more]
12 items

Stationary Engineer Exam Questions with 100% Correct Answers

(0)
CA$19.59

1x sold

How much clearance from the top of the boiler is needed for a HP boiler that produces 70000 lbs of steam? Correct Answer 7 feet On a gas fired boiler what is the proper gas to air mixture Correct Answer 30%-70% and in special arrangements it can be as high as 100% . ANSWER CHAPTER 11 remember% ...

View example

Stationary Engineer License Practice Grade 4 Questions with 100% Correct Answers

(1)
CA$18.86

2x sold

What is a boiler Correct Answer a closed metal container (pressure vessel) which water is heated to produce steam or heated water What is steam Correct Answer the vapor that forms when water is heated to its boiling point When did the greatest impact of the use of steam power occur Correct Ans...

View example

Stationary Engineer Exam Questions with 100% Correct answers

(0)
CA$17.41

Cl2 Correct Answer Chlorine boiler Correct Answer equipment that provides hot water or steam for various uses PRV Correct Answer PRESSURE RELIEVE VALVE NOWL Correct Answer Normal operating water level BTU Correct Answer British Thermal Unit absolute pressure Correct Answer gauge press...

View example

3rd Class Stationary Steam Engineer License Prep Exam Questions with Correct Answers

(0)
CA$18.86

_________ are necessary for complete combustion Correct Answer time, temperature, mixture, and atomization if the steam pressure gauge indicates 200 PSIG, the absolute pressure is______ Correct Answer 214.7 a boiler is operating at 400 PSI, and the safety valve opens at 410 PSI and closes at 3...

View example

Stationary Engineering Exam Questions with Complete Solutions (Latest 2023)

(0)
CA$17.41

What is the pressure at the base of a vertical foot of water? Correct Answer 0.433 psi How much should the boiler pressure increase when performing a hydrostatic test? Correct Answer 1.5 times the safety valve setting The range of a boiler steam pressure gauge. Correct Answer 1.5 to 2 times th...

View example

Ohio Stationary Steam Engineer Questions with 100% Correct Answers

(0)
CA$17.41

Combustion efficiency may be increased by_____ the primary air Correct Answer Preheating What is the purpose of cinder reinjection? Correct Answer increase efficiency 2 forces of equal intensity acting in opposite directions is? Correct Answer tension What is true about the dew poimt of flu...

View example

Stationary Engineer Local 99 Exam Questions with 100% Correct Answers

(0)
CA$18.14

In a reciprocating feedwater pump, the _______________ A. water piston is larger than the steam piston B. water and steam piston are the same size C. steam piston is larger than the water piston D. steam valve has to be as large as the water valve Correct Answer C. steam piston is larger tha...

View example

Stationary Engineer Electric Exam Questions with 100% Correct Answers (A+ Graded)

(0)
CA$18.86

1x sold

An AC circuit consists only of a pure inductance and a power source. The relationship between the voltage and the current in this circuit is that the Correct Answer current lags the voltage The power factor of a load is equal to the ____________ power divided by the ____________ power. Correct An...

View example

MD Stationary Engineer Questions with 100% Correct Answers

(0)
CA$18.14

Gases of Combustion that cool on Contact with the boiler heating Surface before combushion is completed Cause a(n) _________ Correct Answer Formation of soot and smoke In the event of a flame failure, the programmer will______ Correct Answer Secure the fuel, purge the firebox, and then shut down ...

View example

Upstationary Grade 3 Engineering License Questions with 100% Correct Answers

(0)
CA$18.86

How can you loose your license? Correct answer 1) drinking on the job 2) sleeping on the job 3) negligence 4) unsafe work 5) signing a falsified license application for someone 6) failing to renew your license annually What must you do if you change jobs? Correct answer notify city hall if ...

View example

Boiler Operator/ Stationary Steam Engineer Exam Questions with Correct Answers

(0)
CA$18.14

What is used to keep SO2 down? Correct Answer wet and dry scrubbers A wet scrubber that has been maintained properly has the capability of absorbing ______% of the SO2 in the flue gas Correct Answer 90% Materials of construction of a flue gas scrubber system must be selected to resist what hos...

View example

NYC High Pressure Boiler License Questions with Correct Answers

(0)
CA$18.86

1x sold

The minimum blowdown for a spring loaded safety valve shall be of what percent of set pressure? Correct Answer 10% How is the main steam pressure gages tested? Correct Answer With an inspectors gage Who is in charge of the code for any plumbing installations? Correct Answer The nyc plumbing co...

View example
avatar-seller

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller ExamsGuru. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for CA$55.17. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

75632 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling

Recently viewed by you


CA$220.55 CA$55.17  1x  sold
  • (0)
  Add to cart