[Show more]An EXCITER on a traditional generator does what? - ️️Voltage regulation (AVR) if you change the excitation current, you change the voltage. 
 
ECO Min, ECO Max, and EMERG Max are genrator _________________. - ️️Limits 
 
When synchronizing to the interconnection, what needs to be synchronize...
Preview 2 out of 7 pages
Add to cartAn EXCITER on a traditional generator does what? - ️️Voltage regulation (AVR) if you change the excitation current, you change the voltage. 
 
ECO Min, ECO Max, and EMERG Max are genrator _________________. - ️️Limits 
 
When synchronizing to the interconnection, what needs to be synchronize...
Control center facilities must have a minimum of how many days of fuel for the backup generator? - ️️5 days 
 
If PJM ACE shows overgeneration, actual imports are: - ️️Less than scheduled 
 
Who should a generator contact at PJM to clear an outage ticket? - ️️Master Coordinator 
 
To cor...
Preview 2 out of 8 pages
Add to cartControl center facilities must have a minimum of how many days of fuel for the backup generator? - ️️5 days 
 
If PJM ACE shows overgeneration, actual imports are: - ️️Less than scheduled 
 
Who should a generator contact at PJM to clear an outage ticket? - ️️Master Coordinator 
 
To cor...
Actions in low voltage alert? - ️️Review transmission & generation outages 
Request reactive reserve check 
 
Heavy load voltage schedule warning purpose is to have members prepare far max support of voltages on the? - ️️Bulk Power System 
 
Manual load dump warning & reduction of Non-critic...
Preview 3 out of 26 pages
Add to cartActions in low voltage alert? - ️️Review transmission & generation outages 
Request reactive reserve check 
 
Heavy load voltage schedule warning purpose is to have members prepare far max support of voltages on the? - ️️Bulk Power System 
 
Manual load dump warning & reduction of Non-critic...
Which of the following balancing control modes is used by PJM under normal operations? - ️️Tie-Line Bias 
 
Which of the following influences does PJM consider when performing their system load forecast? - ️️Weather Conditions & Day of the Week 
 
All of the following are limits that must be...
Preview 4 out of 37 pages
Add to cartWhich of the following balancing control modes is used by PJM under normal operations? - ️️Tie-Line Bias 
 
Which of the following influences does PJM consider when performing their system load forecast? - ️️Weather Conditions & Day of the Week 
 
All of the following are limits that must be...
Which of the following statements is correct concerning PJM assuming frequency control of the restoration process? 
 
A) PJM assumes control once an external transmission tie has been established. 
B) Once an Area Control Error can be calculated, PJM will assume control. 
C) Whenever it becomes too ...
Preview 4 out of 69 pages
Add to cartWhich of the following statements is correct concerning PJM assuming frequency control of the restoration process? 
 
A) PJM assumes control once an external transmission tie has been established. 
B) Once an Area Control Error can be calculated, PJM will assume control. 
C) Whenever it becomes too ...
Real time transmission constraints or contingencies may be alleviated with generators operating ______________ - ️️off cost out of merit. 
 
Monitoring ___________ may give insights into system constraints. - ️️Monitoring LMP's 
 
PJM calls for _____________ reserves to recover ace so that ...
Preview 3 out of 16 pages
Add to cartReal time transmission constraints or contingencies may be alleviated with generators operating ______________ - ️️off cost out of merit. 
 
Monitoring ___________ may give insights into system constraints. - ️️Monitoring LMP's 
 
PJM calls for _____________ reserves to recover ace so that ...
Which of the following would not be an action to take for low voltages 
A. Increase generator MW output 
B. Remove reactors from the system 
C. Increase generator MVAR output 
D. Place capacitors in service - ️️A. Increase generator MW output 
	 
PJM operates it's 500 KV system so that no post ...
Preview 4 out of 49 pages
Add to cartWhich of the following would not be an action to take for low voltages 
A. Increase generator MW output 
B. Remove reactors from the system 
C. Increase generator MVAR output 
D. Place capacitors in service - ️️A. Increase generator MW output 
	 
PJM operates it's 500 KV system so that no post ...
Real time transmission constraints or contingencies may be alleviated with generators operating________. A. below 60 Hz. B. on a new price curve. C. on a new cost curve. D. off cost (out of merit). - ️️off cost (out of merit) 
 
What is the minimum size for a solar park to be required to have re...
Preview 2 out of 7 pages
Add to cartReal time transmission constraints or contingencies may be alleviated with generators operating________. A. below 60 Hz. B. on a new price curve. C. on a new cost curve. D. off cost (out of merit). - ️️off cost (out of merit) 
 
What is the minimum size for a solar park to be required to have re...
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Stuvia is a marketplace, so you are not buying this document from us, but from seller jackline98. Stuvia facilitates payment to the seller.
No, you only buy these notes for CA$21.04. You're not tied to anything after your purchase.
4.6 stars on Google & Trustpilot (+1000 reviews)
79223 documents were sold in the last 30 days
Founded in 2010, the go-to place to buy study notes for 14 years now