100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Need help? CA$10.88   Add to cart

Class notes

Need help?

 1 view  0 purchase

Lecture notes for class 10

Preview 2 out of 13  pages

  • August 17, 2021
  • 13
  • 2021/2022
  • Class notes
  • Thomas jang
  • All classes
All documents for this subject (12)
avatar-seller
kennywong
10.1 Introduction to the BC Building Code
10.2 Factors Determining the Construction
Requirements of a Building
10.3 Requirements for fire separation and closures
10.4 Requirements for egress
10.5 Accessibility requirements




BCLT 1021; Construction Drawings
BCIT




Primary Purpose of Building Codes:
ƒ To protect public safety and health by providing a minimum standard level
of life safety and health.


Who is responsible for assuring that the building complies with the
current Building Code?
ƒ Each consultant is responsible for their scope and is required to sign the
letters of assurance to the municipality at the time of building permit
application.


Types of Building Regulation
ƒ National Building Code
ƒ Provincial Building Code (ex. BCBC)
ƒ Municipal Building Code (ex. VBC)
ƒ Community Design Guide

2

, ƒ Latter of Assurance (BC Building Code)
Letters of Assurance are uniform, mandatory documents intended to clearly identify
the responsibilities of key individuals in a building project

ƒ Schedule A :
Confirmation of Commitment by Owner and Coordinating Registered Professional
ƒ Schedule B
Assurance of Professional Design and Commitment for Field Review
ƒ Schedule C-A
Assurance of Coordination of Professional Field Review
ƒ Schedule C-B
Assurance of Professional Field Review and Compliance


cf. Latter of Assurance (Vancouver Building Code)
ƒ Schedule A — Confirmation of Commitment by Owner and Coordinating Registered Professional
ƒ Schedule B-1 — Assurance of Professional Design and Commitment for Field Review
ƒ Schedule B-2 — Summary of Design and Field Review Requirements
ƒ Schedule C-A — Assurance of Coordination of Professional Field Review
ƒ Schedule C-B — Assurance of Professional Field Review and Compliance
ƒ Schedule D-1 — Commitment for Building Envelope Professional Review
ƒ Schedule D-2 — Commitment for Building Envelope Professional Review

3




4

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller kennywong. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for CA$10.88. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

77254 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
CA$10.88
  • (0)
  Add to cart