100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
In Class Quiz 1&@ CA$23.00
Add to cart

Exam (elaborations)

In Class Quiz 1&@

 4 views  0 purchase

Comes with questions and answers

Preview 3 out of 17  pages

  • March 23, 2023
  • 17
  • 2022/2023
  • Exam (elaborations)
  • Questions & answers
All documents for this subject (2)
avatar-seller
xxxxxx1
Quiz 1




GC: General Conditions: Standardized provisions, define code of conduct, expectation between parties.
A significant piece will remain standard, generally acceptable industry wide.
SC: Supplementary Conditions/Special Conditions: Address the uniqueness, amend or change the GC
which is universally applied.
Construction specifications in conjunction with Construction drawings, read two together
testing and inspectionthe desired level of quality from that material. -> can get from drawings but
elementary/more specific details like fire rating, hardware, software, what test doesn’t have to pass,
timber, what wood do you need. Cannot be graphically be present




All of them.
Lecture script: Scope of work: drawings & technical specifications. Need both.
But I think the general conditions, construction drawings and technical specifications are correct answer.
General Condition: General conditions are all of those items that will not form part of the actual
product, once the project has been finalized. The items included under the general conditions are all of
those tools, resources, and equipment needed to build a project, but not directly related to the physical
construction activities, and that you can be entitled to be compensated for. This list includes
descriptions of some of the most common items you can include in your construction costs.
For example, pre-development fee, utilities, vehicles, office trailers, etc.

,I think the last one is not correct because the contractor will provide the unit rate for BOF.
Option 1: Once a contract is signed, the bill of quantities can be used to create payment applications as
the work progresses. The contractor notes the quantities completed each month on the form and
multiplies it by the price for each item to get the invoice amount.
Option 2: Correct
Option 3: Once prepared, the BOQ is given to contractors to provide pricing for the project. Because the
materials and quantities are already given, this allows them to focus on pricing instead of doing takeoffs.
After its complete, the pricing is returned to the owner for review and contractor selection.
Option 4: Start preparing a bill of quantities by breaking the work down into items that can be quantified
or measured. This breakdown is often based on standard work breakdown structures, like CSI codes. The
breakdown works best when it’s organized by subcontractor packages, which makes it easier for general
contractors to bid the work.
The list of work items includes a short description, the quantity, and the unit of measure. From there,
the contractor prices the work listed on the bill of quantities, based on the drawings and specifications
they have been provided.




B
The BOQ does not have the unit rate.

, It can be amended during the construction phase




A shop drawing is a drawing or set of drawings produced by the contractor, supplier, manufacturer,
subcontractor, consultants, or fabricator. Shop drawings are typically required for prefabricated
components
It is usually prepared by the sub-trade and manufacturer after the bidding is awarded.




Offer: the statement of terms and conditions to which the offeror is willing to be bound.
Acceptance: Willingness to abide by the essential terms and conditions of the contract.
Consideration: Each party must provide something of value to exchange with the other(does not have to
be money)

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller xxxxxx1. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for CA$23.00. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

50064 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
CA$23.00
  • (0)
Add to cart
Added