100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Summary APS1001 Project Management Individual Assignment CA$15.11   Add to cart

Summary

Summary APS1001 Project Management Individual Assignment

 32 views  1 purchase

Summary of 8 pages for the course APS1001 at U of T (N/A)

Preview 2 out of 8  pages

  • March 23, 2023
  • 8
  • 2022/2023
  • Summary
All documents for this subject (3)
avatar-seller
xxxxxx1
Introduction

Project management is the most widely adaptable methodology for project delivery in the

construction industry. However, it would take time for each individual to be proficient in relevant

essential techniques in the professional setting, so I would like to share some of my real-life experiences

on how I practice my project management skills at my workplace. This paper will discuss how the project

management approach helps me to hand over deliverables that meet clients' expectations and

timelines.


Professional Background

I am a Cost Consultant at Altus Group which is a global-leading construction consulting firm

specializing in cost estimation, advisory, and project management. Altus Group like most construction

consulting firms has a project-based business model of the service scope and our cost&project

management department offers tactical services to help owners or contractors to make substantial

preparations for their upcoming projects including cost planning, loan monitoring, and dispute

resolution. Working in the consulting industry over the past two years, I have been actively gaining cost

estimating expertise in hundreds of construction projects including ICI, residential and horizontal

construction.


Cost consulting is a fast-paced and competitive working environment; it has pushed me to

become a diligent worker that can manage multiple projects simultaneously and meet the client`s

deadline as a standard of practice. The following essay will discuss a typical project life cycle of the cost

planning project in my daily operation and explain how I can increase my productivity by using project

management tools. Then I will share an example of my project management experience at my

workplace.

, Overview of the Cost Planning Project
Design-bid-build (DBB) is the most traditional method for general contracting project delivery,

and the linear process includes designing construction packages, bidding, and completing construction.

Nowadays, most residential developers are still embracing the DBB method in Ontario. The owner does

not require the early involvement in the constructability review because the complexity of

the residential project is significantly lower than the public infrastructure project. Moreover, it usually

can secure the lowest first tender with minimal financial risk but it would take a longer time to deliver

the final project (Kubba, 2012).


In the beginning, the owner will hire design consultants for preparing the construction

documents. Once the cost planning document is ready, the owner/architect would ask cost consultants

to check the developing designs and provide a high-level estimation of the project budget with

contingencies. The professional advice from cost consultants can help owners fully understand the

scope of the project and improve the value of the final deliverable within the allowable budget.

Meanwhile, the owner has the opportunity to work on the risk management plan in the earliest possible

time frame such as modifying the design scope, seeking additional financial resources, etc (UKEssays,

2018). For example, If the owner cannot secure loan financing equivalent to the estimated value, the

pre-construction team can modify the design scope within the owner`s affordable budget.


Cost Planning Project Life Cycle

The cost planning projects have the shortest duration and usually are expected to deliver to our

clients in less than two weeks once we receive the design package. They are a major income resource

for our department and I gained most of my project management experience from the cost planning

project. The typical life-cycle of the cost planning project is shown below:

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller xxxxxx1. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for CA$15.11. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

72042 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
CA$15.11  1x  sold
  • (0)
  Add to cart