100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
CIV1299H - Asset Management: Quantitative tools and methods CA$20.04
Add to cart

Exam (elaborations)

CIV1299H - Asset Management: Quantitative tools and methods

 6 views  0 purchase

Group assignment final deliverable

Preview 4 out of 55  pages

  • March 24, 2023
  • 55
  • 2022/2023
  • Exam (elaborations)
  • Questions & answers
All documents for this subject (8)
avatar-seller
xxxxxx1
City of Hamilton
City Hall, 71 Main Street West
Hamilton, Ontario,
Canada L8P 4Y5




BRIEFING NOTE
Sanitary and Stormwater Network Infrastructure Plan
TO: City of Hamilton City Council & Committee

PREPARED BY: University of Toronto CIV1288 Consulting Team - Group 3

DATE: July 22, 2022


ISSUE/BACKGROUND

The City of Hamilton currently has a sanitary, storm and combined sewer network (referred to
of 1,100 km, consisting of over 17,300 pipes constructed from 1900 to 2013.
The average sewer pipe is 66 years old, with more than 61% of the pipes operating for more
than 50 years. The average diameter is 555 mm.
Sewer pipes are inspected via CCTV inspections and are assigned a score from 1 (best) to 5
(worst).
The sewer pipes are made of:
o Vitrified clay (VC) 31%
o Concrete (CON) 50%
o Polyvinyl Chloride (PVC) 4%
o Cured in place pipe (CIPP) 12%
o Other (e.g., brick, steel) 3%
Sewer pipes have a typical useful life of 100 years. However, many pipes have already exceeded
useful life:
o Wastewater 12%
o Storm 6%
Without continued maintenance and necessary rehabilitation, the deterioration within the
sewer pipes would lead to issues including but not limited to:
o Sewer blockage/backups -> Public Health and Safety / Odor / Mold
o Surface Overflow -> Public Health / Flooding / Property Damage / Traffic Congestion
o Drinking Water contamination -> Public Health Impact
o Untreated Sanitary/Storm -> Environmental Impacts




ii

,RECOMMENDATION
To stay within the 10-year budget forecast 2021 Recommended Water, Wastewater and
Stormwater Budget Plan (FCS20073) (City Wide) ), the rehabilitation policies below are
recommended to ensure optimal pipe conditions while staying within the forecasted budget
Due to the natural deterioration and characteristics of the different pipe materials,
rehabilitation policies are provided for each pipe material. Only pipes in conditions 3 (fair), 4
(poor) and 5 (immediate attention) are considered for rehabilitation policy.
Recommended 10-Year Rehabilitation Policy
Pipe Policy (% of pipes to be Avg. Rehab Total Cost* Budget
Type rehabilitated) Condition Cost Forecast
3 4 5 Score
VC 0 0.02% 7.1% 2.35 $61,812 $65,522 $75,363
PVC 1.46% 1.57% 7.51% 1.62 $11,119 $11,832 $14,488
CON 0 2.72% 9.11% 1.82 $145,980 $153,903 $187,202
CIPP 0 5.93% 1.08% 2.32 $9,427 $9,965 $10,937
Total $228,338 $241,222 $287,990
*Total cost includes rehabilitation and maintenance
The Asset Management team is to identify further and prioritize pipes based on their criticality
when developing detailed plans.
Alternative rehabilitation policies and scenarios are available and can be found in the report.



Average Pipe Condition Rating

Do Nothing
2.08

+ 7.2 %

Apply Recommendation
1.93


Pipe Condition distribution based on recommendation

Note: For more details on the recommendation above, please refer to the - Asset
.

*CIPP rehabilitated (not-new pipes) / trenchless rehabilitation method used to repair existing pipelines




iii

,Table of Contents
1.0 Introduction ............................................................................................................................................. 1
2.0 Methodology............................................................................................................................................ 1
2.1 Input Data ............................................................................................................................................ 1
2.2 Data Cleaning ....................................................................................................................................... 2
2.3 Deterioration Model ............................................................................................................................ 5
2.4 Pipe Conditions in 2022 ....................................................................................................................... 9
2.5 Budget Forecast .................................................................................................................................10
2.6 Rehabilitation Costs ...........................................................................................................................11
2.7 Maintenance Costs ............................................................................................................................12
3.0 Level of Service ......................................................................................................................................12
3.1 Safety .................................................................................................................................................12
3.2 Reliability ...........................................................................................................................................13
3.3 Affordability ....................................................................................................................................... 13
3.4 Service Quality ...................................................................................................................................13
4.0 Results .................................................................................................................................................... 15
4.1 Do Nothing Scenario ..........................................................................................................................15
4.2 Scenario 1 Constrained-Budget Single-Objective Optimization Model..........................................16
4.3 Scenario 2 Constrained-Condition Single-Objective Optimization Model .....................................19
4.4 Scenario 3 Multi-objective Optimization Model ............................................................................21
5.0 Discussion ..............................................................................................................................................23
5.1 Model Comparison and Recommendation........................................................................................24
5.2 Qualitative Criteria in Asset Management Policies ...........................................................................24
5.2.1 Health and Safety........................................................................................................................24
5.2.2 State of Good Repair................................................................................................................... 25
5.2.3 Legislation/Municipality's Policy ................................................................................................ 25
5.2.4 Growth-Orientated Mindset ....................................................................................................... 25
6.0 Recommendation to Stakeholders ........................................................................................................ 25
7.0 Project Limitations .................................................................................................................................26
References ...................................................................................................................................................... i
Appendix A Deterioration Models ............................................................................................................. iii
Appendix B Annual Condition Ratings ...................................................................................................... vii
Appendix C Constraint Budget Single Objective Optimization ................................................................ viii


iv

, Appendix D Constraint Condition Single Objective Optimization .............................................................. x
Appendix E Multi-objective optimization model ...................................................................................... xii
Appendix F Initial Pipe Condition in 2013 ................................................................................................. xv
Appendix G - Constraint Budget Single Objective Optimization Cost Breakdown ..................................... xix
Appendix H - Constraint Condition Single Objective Optimization Cost Breakdown................................. xxi
Appendix I Multi-Objective Optimization Model Cost Breakdown ........................................................xxiii




List of Figures
Figure 1. The Average Age of Different Pipe Types After Modifying The Potential Wrong Date. ................ 3

Figure 2. The Total Length of Pipes Network in The Asset Inventory With Nearly 90% of The Sewer
System Consists of CON or VC Pipes ............................................................................................................. 4

Figure 3. The Condition Rating Distribution of The Pipe Types Among Different Age Groups on The
Inspection Date ............................................................................................................................................. 5

Figure 4. All Pipe Age vs. Pipe Condition Rating Under Different Pipe Type Groups ................................... 6

Figure 5. The Relationship Between Pipe Age and Pipe Condition Rating in the Exponential Regression
for CON Pipes ................................................................................................................................................ 6

Figure 6. Deterioration Plots of Sewer Pipes from NRCC ............................................................................. 8

Figure 7. Predicted Average Service Life of Canada Sewer Pipes ................................................................. 8

Figure 8. Forecasted Future Pipe Conditions of Each Type Next Five Years...............................................15

Figure 9. Pipe Condition Rating in Next Ten Years and Policy Rates on Each Pipe Type in Scenario 1 ......18

Figure 10. Rehabilitation Cost VS Budget Cost on Each Pipe Type .............................................................19

Figure 11. Pipe Condition Rating in Next Ten Years and Policy Rates on Each Pipe Type in Scenario 2 ....20

Figure 12. Pipe Condition Rating in Next Ten Years and Policy Rates on Each Pipe Type in Scenario 3 ....23




v

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller xxxxxx1. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for CA$20.04. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

50064 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
CA$20.04
  • (0)
Add to cart
Added