Exam (elaborations)
Chapter 13: Control Charts and Sampling Strategy
- Course
- Institution
The process mean and sample mean are the same. - ANS FALSE Two samples from the same population and taken at the same point in time are likely to have the same sample mean. - ANS FALSE A line chart is constructed from a scatter plot. - ANS TRUE A control chart must have an UCL and LCL but it is...
[Show more]