100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
CESSWI STUDY GUIDE – QUESTIONS AND ANSWERS CA$17.47   Add to cart

Exam (elaborations)

CESSWI STUDY GUIDE – QUESTIONS AND ANSWERS

 5 views  0 purchase

CESSWI STUDY GUIDE – QUESTIONS AND ANSWERS

Preview 2 out of 10  pages

  • February 13, 2024
  • 10
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
All documents for this subject (253)
avatar-seller
LeCrae
CESSWI STUDY GUIDE – QUESTIONS AND ANSWERS

CESSWI stands for Certified Erosion, Sediment and Storm Water Inspector and
was developed by EnviroCert International, Inc. This certification is intended
to ensure registrants meet the federal requirements of US EPA's NPDES
definition of "Qualified Personnel" and meet state and local regulation
requirements.

Priority Pollutants ✔️Ans - Nutrients
Pathogens
Heavy Metals
Toxics
Sediment
Salts
Detergents
Hydro-Carbons
Oxygen Absorbing Substances

Federal Water Pollution Control Act (1948) ✔️Ans - Later became the
Clean Water Act (CWA)

Clean Water Act (1972) ✔️Ans - Was enacted with the intent of restoring
and maintaining the chemical, physical, and biological integrity of the waters
of the US.

CWA Section 401 - Water Quality Certification ✔️Ans - Requires that any
applicant for a federal permit to conduct any activity, including the
construction or operation of a facility that may result in the discharge of any
pollutant, must obtain certification of those activities from the state in which
the discharge originates.

CWA Section 402 - NPDES Regulations ✔️Ans - Established the National
Pollutant Discharge Elimination System (NPDES) permit program to control
discharges of pollutants from point sources.

National Urban Runoff Program (NURP) ✔️Ans - One purpose of the
program was to identify the characteristics of stormwater discharged through
municipal, separate storm systems (MS4's).

, National Urban Runoff Program (NURP) Results ✔️Ans - Data showed that
stormwater contained many of the same conventional and toxic pollutants
regulated from process outfalls and publicly owned treatment works
(POTW's), sometimes in very high quantities.

Phase I Facility Categories ✔️Ans - Facilities already covered by an NPDES
permit for stormwater

Facilities that engage in industrial activity ("heavy" manufacturing facilities,
large construction sites, transportation facilities, etc.)

Large (>250,000 population) municipal separate storm drain systems (MS4's)

Medium (100,000> population <250,000) municipal separate storm drain
systems (MS4's)

Facilities that the EPA administrator determines to have stormwater
discharges contributing to a violation of water quality, or that are "significant
contributors" of pollutants to waters of the US

Phase II Dischargers ✔️Ans - Those not originally required to obtain
permits

"Light" industrial facilities

Small construction sites (<5 acres)

Small Municipalities (<100,000 population)

CWA Section 404 - Dredge/Fill Permitting ✔️Ans - Established a permit
program to regulate the discharge of dredged or fill material into waters of the
US and is administrated through the Army Corps of Engineers.

Coastal Zone Act Reauthorization (CZARA) 1990 Amendments ✔️Ans -
Requires the development of a Coastal Nonpoint Pollution Control Program
Management Plan for every designated state under coastal zone jurisdiction.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller LeCrae. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for CA$17.47. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

73314 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
CA$17.47
  • (0)
  Add to cart