100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
CESSWI - Sections 1 + 2: Questions & Verified Answers CA$14.46   Add to cart

Exam (elaborations)

CESSWI - Sections 1 + 2: Questions & Verified Answers

 5 views  0 purchase

CESSWI - Sections 1 + 2: Questions & Verified Answers

Preview 2 out of 6  pages

  • February 13, 2024
  • 6
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
All documents for this subject (289)
avatar-seller
LeCrae
CESSWI - Sections 1 + 2: Questions & Verified Answers

Qualified Personnel ✔️Ans - a person knowledgeable in the principles
and practice of erosion and sediment controls who possesses the skills to
assess conditions at the construction site that could impact storm water
quality and to assess the effectiveness of any sediment and erosion control
measures selected to control the quality of storm water discharges from
the construction acitivities

How must the inspector act? ✔️Ans - professional, impartial, courteous,
consistent in every situation, honest and accurate with your response

Why was the CWA enacted? ✔️Ans - To restore and maintain the
chemical, physical and biological integrity of the waters of the U.S.

Section 401 ✔️Ans - If you are involved in construction or industrial
activities that may result in discharge of any pollutant you must obtain
Water Quality Certification

NPDES ✔️Ans - National Pollutant Discharge Elimination System, est.
1972

Section 402 ✔️Ans - Stated that five categories of strormwater
discharges were subjected to permitting

Phase I facilities ✔️Ans - 1987
-those already covered under NPDES
-those that engage in industrial activity
-large (<250,000) municipal separate storm drain system
-medium (>100,000, <250,000) municipal separate storm drain system
-facilities that EPA determines to have stormwater discharges contributing
to violation of water quality

When did IGP and CGP roll out? ✔️Ans - 1992

Phase II dischargers ✔️Ans - -"light" industrial facilities
-small construction sites (<5 acres)
-small municipalities (<100,000 population)

, Section 404 ✔️Ans - established a permit program to regulate the
discharge of dredged fill material into waters of the U.S.

Stormwater is, as defined under EPA's NPDES rules,... ✔️Ans -
stormwater runoff, snow melt runoff, and surface runoff or drainage

Waters of the U.S. ✔️Ans - -all waters that are/were used or may be
susceptible to use in interstate or foreign commerce
-all interstate waters including wetlands
-all other waters such as lakes, rivers, streams, mudflats, sand flats,
wetlands, sloughs, prairie potholes, wet meadows, playa lakes, or natural
ponds
-all impoundments of waters otherwise defined as waters of the U.S.
-tributaries of waters
-the territorial sea
-wetlands adjacent to waters identified in this definition

NOI must be filed by... ✔️Ans - "operator"- person that has day-to-day
supervision and control of activities occurring at a site (may be
owner/contractor)

Who is exempt under Phase II? ✔️Ans - agriculture (only for crop
production), O + G, and forestry

What does Phase II rule require? ✔️Ans - Operators of Phase II
construction sites to obtain an NPDES permit

Construction rainfall erosivity waiver (only for Phase II) ✔️Ans - -low
prediction rainfall potential (i.e. activity occurs in summer)
-determination that stormwater controls are not necessary because TMDL
addresses pollutant of concern or non-impaired waters that don't require
TMDLs

Who are waivers not available to? ✔️Ans - Any construction activity
disturbing 5 acres or greater, or less than five acres if part of a common
plan of development or sale

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller LeCrae. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for CA$14.46. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

67866 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
CA$14.46
  • (0)
  Add to cart