100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Michigan Builders Exam – Questions With Solutions CA$34.71   Add to cart

Exam (elaborations)

Michigan Builders Exam – Questions With Solutions

 3 views  0 purchase

Michigan Builders Exam – Questions With Solutions

Preview 4 out of 31  pages

  • March 18, 2024
  • 31
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
All documents for this subject (795)
avatar-seller
LeCrae
Michigan Builders Exam – Questions With Solutions

What is not a step in lead paint safety? ✔️Ans - using a shopvac

Each one gallon of water added to one yard of concrete will... ✔️Ans -
Reduce the PSI strength by 150.

A construction lien can be placed on? ✔️Ans - Residential, and Commercial
property.

Trench boxes are used.... ✔️Ans - to protect workers in deeper excavation.

About how much does a yard of dirt weigh? ✔️Ans - 2000-3000 lbs

The board shall consist of _____voting members, and ______ member's shall
represent the general public. ✔️Ans - 9, 3

Who is responsible in providing an employee personal protection equipment?
✔️Ans - The employer

The first thing that should be done with a worker is to---? ✔️Ans - Make
sure that they are trained!

What is often placed under the sill plate on powered walls to smooth uneven
spots? ✔️Ans - Sill sealer

What's the purpose of concrete forms? ✔️Ans - Retaining moisture in the
concrete.

In concrete estimating- the formula to determine cubic yards is? ✔️Ans -
LxWxT /27

What kind of outlet should electric powered tools be connected to? ✔️Ans -
GFI

The bottom chord lateral restraint is a min ________ feet on center? ✔️Ans -
15

,What type of tool uses gun powder loads to shoot fasteners? ✔️Ans -
Powder-actuated tools

Standard precut studs are usually ____ long for a 8' wall ✔️Ans - 92' 5/8"

If different textured soils are encountered in the side of an excavation, each
soil type of excavation shall be cut to the proper angle of.... ✔️Ans - Repose

How do you measure a board ( in feet)? ✔️Ans - Thickness X Width X
Length / 12

Who prepares the notice of commencement? ✔️Ans - The homeowner

What's the best combination of R-Values and U-Values to be energy efficient?
✔️Ans - High R, Low U

When backfiling be careful not to damage--- ✔️Ans - The basement walls.

If you have reason to believe your project involves working in the presence of
asbetos what should you do? ✔️Ans - Stop working.

When estimating basement walls, what's the correct formula? ✔️Ans - L x
W x H / 27

Which wall is going to give you extra studs for your three stud center?
✔️Ans - BYwalls

What's the correct formula to use to measure board feet? ✔️Ans - W x T x
L/ 12xpcs
or W x Tx L/144 xpcs

What does CSI format refer to? ✔️Ans - Splitting up documents for a
construction project into 16 sections.

Vapor retarder is often _____or______ thick plastic sheating. ✔️Ans - 6, or 8
mil

A basement has to have a minimum of what R-Value? ✔️Ans - R -10

,A keyway is usually how wide when a 2 x 4 is used to form it? ✔️Ans - 3.5"

What is the notch called in the spread footing? ✔️Ans - keyway

What is the fine for failing to provide worker's compensation insurance?
✔️Ans - $1,000 &,or not less than 30 days or more than 6 month for each
day's offense.

A worker's disability extending beyond 7 consecutive days, (not including the
date of injury) must be requested by which form? ✔️Ans - WC-100

There are ______Cubic feet in a cubic yard ✔️Ans - 27

Make sure the bottom of your trench is _____? ✔️Ans - solid and stable

How much is paid in worker's compensation ? ✔️Ans - Generally, workers
receive 80% of their after tax-wages

In order to be paid for worker's compensation, a worker must have a wage
loss of---? ✔️Ans - at least one week.

Worker's compensation is a ? ✔️Ans - no-fault insurance.

What should the diameter of a foundation drain pipe be? ✔️Ans - 4 inches

Occupation I and I include? ✔️Ans - Acute and Chronic.

Part 603, lead exposure is part of what requirement? ✔️Ans - Miosha

Check your ____ to make sure your corners are square. ✔️Ans - Diagnals

The main components of a conventional system? ✔️Ans - Floor joists,
girder, posts, and columns.

A ________ is an assembly of full length studs @ the corner of a building.
✔️Ans - Corner Post

Plate layout identifies the location of _____? ✔️Ans - -Studs in the wall,
-Location of doors,

, -Location of windows.

For underlayment _________ asphalt saturated felt may be used. ✔️Ans -
Number 30.

For ice damns, solids sheating should be applied above the laves line to a point
at least ______ inside the interior wall. ✔️Ans - 24

When layering wood shingles, how much spacing should be left for exposure?
✔️Ans - 1/4"

Wall studs should be #2 or better SPF @ ________ inches on center, unless
otherwise noted. ✔️Ans - 16'

For gutters, once you have a gutter that exceeds ______, you need to put in an
expansion joint. ✔️Ans - 60'

Metal gutters slope at least _____ for every ______ towards the downspout.
✔️Ans - 1", 16'

The purpose of a plot and grading plan is....? ✔️Ans - To build a house at
the proper elevation for storm runoff.

Who shall promulgate rules according to Act 299? ✔️Ans - The board

Under what conditions can you make non-vented crawl spaces? ✔️Ans -
With the proper vapor barrier and insulation.

PACM means ✔️Ans - Presumed asbestos containing material.

The two most common kinds of mortar joints are? ✔️Ans - Concave and V
joints

What would make a house rack? ✔️Ans - Wind

How long is a "lecausre" valid once it's issued? ✔️Ans - 3 years

Anchor bolts are supposed to be a max of how many feet apart in MI? ✔️Ans
- 6 feet

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller LeCrae. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for CA$34.71. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

78121 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
CA$34.71
  • (0)
  Add to cart