100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
CM 1011 Final exam review Questions with 100% Actual correct answers | verified | latest update | Graded A+ | Already Passed | Complete Solution CA$11.57   Add to cart

Exam (elaborations)

CM 1011 Final exam review Questions with 100% Actual correct answers | verified | latest update | Graded A+ | Already Passed | Complete Solution

 3 views  0 purchase
  • Course
  • Institution

CM 1011 Final exam review Questions with 100% Actual correct answers | verified | latest update | Graded A+ | Already Passed | Complete Solution

Preview 2 out of 12  pages

  • June 26, 2024
  • 12
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
avatar-seller
CM 1011 Final exam review
3D CAD is the same as BIM. - ANS-False

50% of the D.R. Horton construction team are graduates of the LSU CM department. -
ANS-True

A BIM design begins with intelligent objects such as walls, roof, and windows - ANS-True

A BIM file contains construction details, performance characteristics, and product specs. -
ANS-True

A BIM model cannot perform clash detection before the project does to the field. - ANS-False

A BIM model is a 3D representation of the physical and functional characteristics of a building. -
ANS-True

A BIM model serves as a shared knowledge resource for the entire design and build team. -
ANS-True

A change order adjustment amount does not include general overhead and profit. - ANS-False

A claim can only be made after the project is complete. - ANS-False

A clean site is a safe site. - ANS-True

A clear expression of employee concern should be a policy component of a safety manual. -
ANS-True

A company's managerial commitment should include safety. - ANS-True

A comprehensive quality control plan is the best way to control quality during construction. -
ANS-True

A good win-win example is using recycled concrete as a base material for new roadways or
driveways. - ANS-True

A job hazard analysis focuses on jobs and tasks. - ANS-True

A poor quality design is not a contractor risk. - ANS-False

A project control system utilizes the plans, specs, estimate, and schedule. - ANS-True

, A project debriefing is not meant to be a training mechanism. - ANS-False

A project is considered totally complete even if paperwork has not been delivered to the owner. -
ANS-False

A project may go forward without paperwork. - ANS-False

A public project has less governmental involvement than a private project. - ANS-False

A risk mitigation plan happens before construction starts and does not vary thereafter. -
ANS-False

A safety officer at a company must have authority to take corrective actions if a hazard is
identified. - ANS-True

A stop sign is an example of an administrative control. - ANS-True

A tailgate meeting to review safety procedures is risk management. - ANS-True

A zero-punch list should not be a goal of the project. - ANS-False

According to the Brundtland definition of sustainable development, a sustainable society meets
the needs of the present without compromising the ability of future generations to meet their
own needs. - ANS-True

Adding contingencies may be a pre-bid method to offset a risk. - ANS-True

Additional time should always be asked for when processing a change order. - ANS-True

Administrative activities include permitting, submittals, inspections, and testing. - ANS-True

After quality, safety is the number-one priority when managing construction operations. -
ANS-False

All construction risks have to do with jobsite events. - ANS-False

An activity is a task, function, or decision that has a time commitment, or duration, associated
with it. - ANS-True

An objective of sustainability is to reduce consumption of nonrenewable resources, to minimize
waste, and to create better environments. - ANS-True

An OSHA visit may be caused by an employee complaint. - ANS-True

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Hkane. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for CA$11.57. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

80796 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
CA$11.57
  • (0)
  Add to cart