100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Voice-Data-Video System Drawings and Specifications CA$11.46   Add to cart

Exam (elaborations)

Voice-Data-Video System Drawings and Specifications

 3 views  0 purchase

Voice-Data-Video System Drawings and Specifications

Preview 4 out of 35  pages

  • July 3, 2024
  • 35
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
All documents for this subject (77)
avatar-seller
EXAMQA
Voice-Data-Video System Drawings and
Specifications
Chapter 1: Project Professionals, Design Phases, and the Construction Process

A typical commercial construction project begins with a( n ) __________ seeking to
develop a new or existing property to meets specific needs.

A. Architect
B. Engineer
C. General Contractor ( GC )
D. Owner - ANS-Owner

Chapter 1: Project Professionals, Design Phases, and the Construction Process

The __________ is responsible for all inspections, the final building occupancy approval
sign-off, and the commissioning of all building systems.

A. Architect
B. Engineer
C. General Contractor ( GC )
D. Owner - ANS-General Contractor ( GC )

Chapter 1: Project Professionals, Design Phases, and the Construction Process

The __________ phase gives the owner the first opportunity to see the potential design
and get an approximation of the costs

A. Bidding
B. Construction document
C. Design development
D. Schematic design - ANS-Schematic design

Chapter 1: Project Professionals, Design Phases, and the Construction Process

The __________ are the fully completed design that complies with building codes and
industry standards and are ready for bidding and, ultimately, the construction of the
facility

,A. Addendum
B. Construction documents
C. Drawings
D. Specifications - ANS-Construction documents

Chapter 1: Project Professionals, Design Phases, and the Construction Process

The bidding method is often used for the electrical and VDV system portions of a
project.

A. Competing
B. Cost-plus
C. Labor-only
D. Negotiated/design-assist - ANS-Labor-only

Chapter 1: Project Professionals, Design Phases, and the Construction Process

The __________ bidding method can often save time, provide flexibility, and avoid the
risk of removing completed or partially completed work and starting over.

A. Competitive
B. Cost-plus
C. Labor-only
D. Negotiated/design-assist - ANS-Cost-plus

Chapter 1: Project Professionals, Design Phases, and the Construction Process

Most often, the product selection for private work is specified by __________.

A. Cost
B. Industry standards
C. Specific OEMs
D. Performance - ANS-Specific OEMS

Chapter 1: Project Professionals, Design Phases, and the Construction Process

A( n ) __________ is a document that project managers use to resolve conflicts early in
the process to attempt to eliminate costly corrective measures

,A) Addendum
B) Construction change directive
C) Punch list
D) Request for information ( RFI ) - ANS-Request for information ( RFI )

Chapter 1: Project Professionals, Design Phases, and the Construction Process

A( n ) __________ is typically used to provide clarification and small changes, such as
slightly altering locations or dimensions on a print.

A) Addendum
B) Architect's supplemental instruction ( ASI )
C) Construction change directive
D) Request for information ( RFI ) - ANS-Architect's supplemental instruction ( ASI )

Chapter 1: Project Professionals, Design Phases, and the Construction Process

The end of the construction process includes a( n ) __________ generated by the
architect and the architect's design team outlining work. That remains to be completed,
work not installed as specified, and work requiring adjustment or needing to be cleaned.

A) Addendum
B) Application assurance warranty
C) Architect's supplemental instruction
D) Punch list - ANS-Punch list

Chapter 1: Project Professionals, Design Phases, and the Construction Process

A professional engineer ( PE ) is an individual or commercial firm that specializes in a
particular trade or field of construction.

True or False - ANS-False

Chapter 1: Project Professionals, Design Phases, and the Construction Process

Many OEMS typically provide warranties for VDV systems for a period of 5 years to 25
years

True or False - ANS-True

, Chapter 1: Project Professionals, Design Phases, and the Construction Process

OEM-standardized VDV systems are also known as "proprietary systems."

True or false - ANS-True

Chapter 1: Project Professionals, Design Phases, and the Construction Process

The most common method for bidding on a project from a contractor's perspective is the
labor-only method

True or false - ANS-False - It's the least common method

Chapter 1: Project Professionals, Design Phases, and the Construction Process

The owner of a project determines the parameters of the necessary building space
based on items such as property size and shape, desired interior and exterior spaces,
and available project budget.

True or False - ANS-False

Chapter 1: Project Professionals, Design Phases, and the Construction Process

__________ is the initial design phase that defines the general scope and conceptual
design of a project.

A) Schematic design
B) Drawing development
C) Coordination of requirements
D) Design development - ANS-Schematic design

Chapter 1: Project Professionals, Design Phases, and the Construction Process

__________ is the practice of constructing a building using processes that are
environmentally responsible and resource-efficient throughout the life cycle of the
building.

A) Sustainable building
B) Design building
C) Fast-track building

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller EXAMQA. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for CA$11.46. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

78998 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
CA$11.46
  • (0)
  Add to cart