100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
RWP Training all Questions & answers solved accurately with Complete Solution Graded A+ latest version CA$18.70   Add to cart

Exam (elaborations)

RWP Training all Questions & answers solved accurately with Complete Solution Graded A+ latest version

 2 views  0 purchase

RWP Training all Questions & answers solved accurately with Complete Solution Graded A+ latest version

Preview 2 out of 10  pages

  • July 6, 2024
  • 10
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
All documents for this subject (31)
avatar-seller
TUTORSON
RWP Training
Absolute Block - CORRECT ANSWER-An absolute block is a section of track
that shall not be occupied by more than 1 train or track equipment

Adjacent Track(s) - CORRECT ANSWER-The track(s) next and parallel with the
track where you are located

Advanced Mobile Flagger(AMF) - CORRECT ANSWER-A watchman/lookout
whose duty is to verbally warn Rail Vehicle Operators of Roadway Workers on
the track ahead. AMF's are required to be RWP lvl 2 or 4 qualified.

Advanced Mobile Flagging - CORRECT ANSWER-The use of a Watchman or
Lookout assigned to a work crew in conjunction with an additional flagger
positioned at the station in advance of the Mobile Work Crews

Advanced Watchman/Lookout - CORRECT ANSWER-A qualified
watchman/lookout who is, in addition to the work zone, watchman/lookout. They
shall always be within sight and audible warning of the next preceding lookout.
The sole duty of advanced watchman is to warn the work zone watchman of the
approach of trains or rail equipment

Ample Time - CORRECT ANSWER-Requires workers to be in a position of
safety not less than 15 seconds before a train or rail equipment moving at the
max speed authorized on that track, can pass the location of the Roadway
Worker; or sufficient levels of protection that permit workers time to clear the
tracks without urgent movement

Ballast - CORRECT ANSWER-The coarse gravel laid to form a bed for a
railroad, for the purpose of holding track in line and surface

Block - CORRECT ANSWER-A length of track with defined limits on which train
movements are governed by the automatic train protection signaling system or
by instruction from Rail Operations Control Center (ROCC)

, Chain Marker - CORRECT ANSWER-A survey stationing marker located every
chain along the tracks identifying the distance, in multiples of 100 ft, to the middle
of the Metro Center platform(or the most inbound end of the rail line, if the line
does not pass through Metro Center). Track locations are expressed to the
nearest foot by a letter representing the line, the track number, a hyphen, the
nearest chain marker inbound from the location, a plus sign and the number of
feet from that chain marker

Clear - CORRECT ANSWER-1.A term used in conjunction with a definite action
so as to release control from one person to another

2. The state of a controlled signal when the proceed/lunar aspect is displayed


3. While on mainline, safely outside the dynamic outline of a train or clearance
envelope for trains or Rail equipment on the active track


4. Safely away from the moving parts of a track switch or electrical circuit


5. Beyond an identified location


6. It SHALL NOT be used in conjunction with radio communications as a means
to respond to a directive

Collector Shoe - CORRECT ANSWER-The carborne device designed to slide on
the third rail to pick up DC propulsion current.

Contractor - CORRECT ANSWER-A person or business entity that is hired by
WMATA to perform work, but is not an employee of WMATA

Controller - CORRECT ANSWER-A person with the authority for controlling
mainline operations

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller TUTORSON. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for CA$18.70. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

84866 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
CA$18.70
  • (0)
  Add to cart