Exam (elaborations)

CSI CDT Exam all Questions & answers solved 100% accurately with Complete Solution Graded A+ latest version

 2 views  0 purchase

CSI CDT Exam all Questions & answers solved 100% accurately with Complete Solution Graded A+ latest version

Preview 3 out of 19  pages

  • July 7, 2024
  • 19
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
All documents for this subject (10)
avatar-seller
TUTORSON
CSI CDT Exam
Owner - CORRECT ANSWER-Principle stakeholder - initiates project, assumes
risk, provides funding

AHJ - Authorities Having Jurisdiction - CORRECT ANSWER-Protect public
health, safety and welfare

Design Team - CORRECT ANSWER-Address planning issues, determine design
program, identify codes and regulations, produce procurement and construction
documents, administer construction contract, *provide QA/QC procedures*

Contractor Team - CORRECT ANSWER-Entity that constructs a facility. Uses
management abilities to gather labor forces, subs, and
material/product/equipment suppliers

Supplier Team - CORRECT ANSWER-Furnishes the materials and products for
the facility to be constructed. Fabricator, Distributor, Manufacturer, Supplier.

Facility Life Cycle - CORRECT ANSWER-The life cycle of a facility, from concept
through construction to use and eventual deconstruction.
Project Conception
Project Delivery
Design
Construction Documents
Procurement (Bidding/Negotiating/Purchasing)
Construction
Facility Management

Project Conception - CORRECT ANSWER-Transforms the needs of owner into
clear concept on which project can be designed. Feasibility Study, Programming,
Site Selection, Budgeting.

Project Delivery - CORRECT ANSWER-Determine delivery method to be used.
Factors - qualifications, experience, capacity, project extent, time requirements.

,Design - CORRECT ANSWER-Two Phases: schematic design and design
development. Deliverables include graphic and written design documents and
estimates of project cost.

Schematic Design - CORRECT ANSWER-Overall relationships and functions.
Site plan and area, general size/shape/massing of elements, elevations and
exteriors established, conceptual design criteria identified.
Deliverables - schematic drawings, probable cost, preliminary schedules

Design Development - CORRECT ANSWER-Technical issues of constructibility
and integration of systems and components.
Deliverables - Tech information, outline specifications, updated schedule,
updated cost estimate.

Construction Documents - CORRECT ANSWER-Defined as the written and
graphic documents prepared or assembled by the A/E for communicating the
project design for construction and administering the construction contract.
Construction documents include two major types of documents: Procurement
documents and Contract documents.

Procurement (Bidding/Negotiating/Purchasing) - CORRECT
ANSWER-Acceptance of the contractor's bid or negotiated sum and other
conditions will result in award of a contract and commencement of work.

Construction - CORRECT ANSWER-Responsibilities:
Contractor - perform work, project coordination, comply with project documents.
A/E - construction admin, evaluation services, certify application for payment,
final inspection of work.
Owner - provide information, process payments, approve contract modifications,
accept project upon completion.

Facility Management - CORRECT ANSWER-During occupancy, owners & facility
managers maintain and evaluate the performance of the project and determine
suitability for continuing use.

, OmniClass - CORRECT ANSWER-A multi-table informational framework for
organizing information used by the architectural, engineering, and construction
industry.

UniFormat - CORRECT ANSWER-Uniform classification system for organizing
preliminary construction information into a standard order or sequence on the
basis of systems or assemblies. Particularly useful in conceptual design. Element
Identification.

MasterFormat - CORRECT ANSWER-Arranges related construction practices,
logical groupings of work results, into a series of divisions. 50 division format.
Used for Specifications, data organization, and cost classification.

MasterFormat Groups - CORRECT ANSWER-00 Procurement and Contracting
Requirement Group

Specifications Group
- General Requirements 01
- Facility Construction Subgroup (concrete)
- Facility Services (plumbing/HVAC)
- Site and Infrastructure (Earthwork)
- Process Equipment (WW equipment)

SectionFormat - CORRECT ANSWER-Provides a uniform approach to
organizing specification information by three primary parts. General, Products,
Execution

Sustainable Design - CORRECT ANSWER-Environmental performance of the
facility over course of its life cycle. Takes place at the product and facility level.

Environmental Design Tools - CORRECT ANSWER-National Institute of
Technology (NIST) - Building for Env. and Economic Sustainability (BEES) - for
building products

EPA - Energy Star program - products are rated for sustainability criteria
compliance

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller TUTORSON. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for CA$18.32. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

80435 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
CA$18.32
  • (0)
  Add to cart