100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
LEED BD+C Exam (1). CA$11.51   Add to cart

Exam (elaborations)

LEED BD+C Exam (1).

 1 view  0 purchase

Exam of 26 pages for the course Millwright. Bearings at Millwright. Bearings (LEED BD+C Exam (1).)

Preview 3 out of 26  pages

  • July 18, 2024
  • 26
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
All documents for this subject (38)
avatar-seller
lydiaomutho
LEED BD+C Exam
When calculating occupied areas in an area of a building, what spaces must be
excluded? - CORRECT ANSWER-Underground or structured parking

Mechanical spaces are included




How do you calculate default occupancy counts for Core and Shell projects? -
CORRECT ANSWER-Using gross floor area, not net or leasable floor area




Are hotel guests visitors or regular occupants of the building? - CORRECT
ANSWER-Regular occupants




Can boats and mobile homes be certified under LEED? - CORRECT ANSWER-No.

Pre-fab or modular structures may be certified once permanently installed.




Who is considered a visitor to the building? - CORRECT ANSWER-Retail customers

Outpatients

Peak Outpatients

Volunteers

Post-secondary higher education students




How do you calculate occupancy counts if the number of occupants is not known
during the LEED certification process? - CORRECT ANSWER-Use default
occupancies tables in Appendix reference guide for LEED C/S.

Tenant occupancy numbers may never exceed the default occupancy table

,Are restrooms and office building lobbies regulary or non-regulary occupied spaces?
- CORRECT ANSWER-They are treated as non-regulary occupied spaces.

However, hotel lobbies are are regularly occupied because people congregate there




Under what conditions can a building be constructed on a dock, pier, jetty, infill or
other manufactured structure in or above water be considered permissable? -
CORRECT ANSWER-The dock, pier, etc. must be previously constructed; the
artificial land previously developed




Which organization is responsible for developing the LEED rating systems and
reference guides? - CORRECT ANSWER-USGBC




What conditions apply to complying with the MPR criterion, use reasonable LEED
boundaries? - CORRECT ANSWER-The gross floor area of the LEED project should
be no less than 2% of the gross land area within the LEED boundary




With which ASHRAE standard is the International Green Construction Code (IgCC)
aligned? - CORRECT ANSWER-ASHRAE 189.1




What is the difference between primary categories and BONUS categories? -
CORRECT ANSWER-Primary: Integrative Process, SS, etc.

Bonus: Innovation, Regional Priority




What two aspects should be modeled in IP Energy Related Systems? - CORRECT
ANSWER-Lighting Levels

Site Conditions

, What is the value of a simple box model? - CORRECT ANSWER-It generates a
basic distribution of energy uses and identifies dominant energy loads.




What are the goals of IP Water Related Systems? - CORRECT ANSWER-Identify at
least one on-site potable water supply source to reduce at least two municipal water
demand components, e.g. outdoor and indoor water demand, process water.




How many people must constitute the project team for the LEED for healthcare
prerequisite for Integrative Project Planning and Design? - CORRECT
ANSWER-Minimum of four key project members, and the owner or owner's
representive




What supply sources can be assessed under IP Water Related Systems? -
CORRECT ANSWER-Site rainwater

Grey water

Municipally supplied non-potable water (purple water)

HVAC equipment condensate




How much of a project's floor area must be complete by the time of LEED BD+C
certification? - CORRECT ANSWER-At least 60% of the gross floor area




What are the criteria for a Neighborhood Development project to comply with project
size requirements? - CORRECT ANSWER-Must contain at least two buildings

Must be no larger than 1500 acres

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller lydiaomutho. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for CA$11.51. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

81989 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
CA$11.51
  • (0)
  Add to cart