ACG CxA
AABC - ANS-Associated Air Balance Council

ASHRAE - ANS-American Society of Heating, Refrigerating and Air-Conditioning Engineers

ANSI - ANS-American National Standards Institute

ASTM - ANS-ASTM International, formerly known as American Society for Testing and Materials

ISO - ANS-International Organization for Standardization

ASME - ANS-American Society of Mechanical Engineers

NFPA - ANS-National Fire Protection Association

SMACNA - ANS-Sheet Metal and Air Conditioning Contractors' National Association

What does EBCx stand for? - ANS-Existing Building Commissioning

What does FIM stand for? - ANS-Facility improvement measure

What does NETA stand for? - ANS-International Electricl Testing Associaiton

What does NFPA stand for? - ANS-National Fire Protection Associaiton

What does NICET stand for? - ANS-National Institute for Certificaiton in Engineering Technology

What does CFR stand for? - ANS-Current Facility Requirements

Define ACG - ANS-AABC Commissioning Group. A non-profit association dedicated to the
advancement of the building commissioning industry

What does AABC stand for? - ANS-Associated air balance council

What does AI stand for? - ANS-Analog Input

What does AO stand for? - ANS-Analog Output

What does ATC stand for? - ANS-Automatic Temperature Controls

What does BAS stand for? - ANS-Building Automation system

,What does CA stand for? - ANS-Commissioning Authority

What does CT stand for? - ANS-Cooling Tower

What does CHWR stand for? - ANS-Chilled water return

What does CHWS stand for? - ANS-Chilled water supply

What does CWR stand for? - ANS-Condenser water return

What does CWS stand for? - ANS-Condenser water supply

What does DDC stand for? - ANS-Direct Digital Control

What does DI stand for? - ANS-Digital Input

What does DID stand for? - ANS-Design Intent Document

What does DO stand for? - ANS-Digital output

Define FPT - ANS-Functional Preformance Test. Process of testing the DDC/BAS/EMS in every
possible condition and verifying correct equipment response. This is the "Heart of the
commissioning process".

What does HVAC stand for? - ANS-Heating, Ventilation & Air Conditioning

What does IAQ stand for? - ANS-Indoor Air Quality

What does LEED stand for? - ANS-Leadership in Energy and Environmental Design, USGBC
trademarked "Green Building Rating System"

What doesO&M stand for? - ANS-Operation and Maintenance

What does OA stand for? - ANS-Outside Air

What does PM stand for? - ANS-Preventive Maintenance

What does RFP stand for? - ANS-Request for proposal

What does RFT stand for? - ANS-Resolution Tracking Form

What does SVC stand for? - ANS-System Verificaiton Checklist

,Define TAB - ANS-Testing, Adjusting, and Balancing or Test and Balance. Process of controlling
air and water flow through HVAC equipment. Recommended that a third party be directly
contracted with owner

What does TBE stand for? - ANS-Test and Balance Engineer

What does USGBC stand for? - ANS-United States Green Building Council

What does ECM stand for? - ANS-Energy Conservation Measure

What does ANSI stand for? - ANS-Americans National Standards Institute

What does ASTM stand for? - ANS-American Society for Testing and Materials International

What does ISO stand for? - ANS-International Organization for Standards

What does ARI or AHRI stand for? - ANS-Air Conditionaing, (Heating), and Refrigeration Instiute

What does ACCA stand for? - ANS-Air Conditioning Contractors of America

Define UL - ANS-Underwriters Laboraories - Demonstrates safety, conformance, sustainablility,
etc.

What does ASME stand for? - ANS-American Society for Mechanical Enginners

What does SMACNA stand for? - ANS-Sheet Metal and Air Conditioning Contractos National
Institute

Define Commissioning - ANS-A systematic process that facilities and ensure the required
communication, coordination testing, and verification and results in the delivery of a building
whose HVAC systems preform as intended.

During what phase should Commissioning be incorporated? - ANS-For best results
Commissioning should be included in all phases of the design and construction process

Typically how much does Commissioning cost? - ANS-Comprehensive HVAC Comissioning cost
2%-5% of HVAC construction cost

Define RFQ - ANS-Request for Qualifications. Document asking for details concerning previous
relevant Cx experience. Information includes:

Define Re-Commissioning - ANS-Periodically Re-commissioning systems that were
commissioned when they were new. The purpose is to diagnose the cause of ongoing,

, unresolved problems or as part of a planned preventive maintenance program to prevent issued
from arising over time.

Define Retro-Commissioning - ANS-Commissioning of existing systems that were not
commissioned when they were new.

Name the different contruciton models - ANS-Plan and spec, Design- Build

What is included in the Pre-design phase for Comprehensive HVAC Cx? - ANS-1. Cx is
established as part of project
2. Owner select CxA
3. Develop Cx Scope
4. CxA review design intent document

What is included in the Design phase for Comprehensive HVAC Cx? - ANS-1. Review design to
ensure it accommodates Cx
2. Write Cx specifications defining contractor responsibilities
3. Establish project schedule

What is included in the Construction phase for Comprehensive HVAC Cx? - ANS-1. CxA
reviews contractor submittals
2. CxA updated Cx plan
3. Cx process is coordinated-through project schedule, Cx plan, and commissioning meetings
4. Carry out document systems verification checks
5. Carry out the document equipment and system start-ups
6. TAB agency completes and documents test and balance work

What is included in the Acceptance phase for Comprehensive HVAC Cx? - ANS-1. Carry out
functional performance tests on all HVAC systems
2. Train the O&M staff for effective, ongoing operations and maintenance of all systems
3. Provide full documentation

What is included in the Post-Acceptance phase for Comprehensive HVAC Cx? - ANS-1. Correct
any deficiencies, and carry out any required re-testing
2. Carry out any required "off-season" tests
3. Update documentation as required

What is the purpose of ASHRAE Guideline 0? - ANS-"...to describe the commissioning process
capable of verifying that a facility and its systems meet the OPR."

What is a systems manual? - ANS-"A system-focused composite document that includes the
operation manual, maintenance manual, and additional information of use to the Owner during
the Occupancy and Operations Phase."

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller modockochieng06. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for CA$11.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

66579 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
CA$11.49
  • (0)
  Add to cart