The primary purpose of benching or serrated slopes is to
provide additional area for landscaping
break up the surface flow of runoff on long steep slopes
provide a level area for wildlife crossing
none of the above - ANS-break up the surface flow of runoff on long steep slopes

The Erosion and Sediment Control Responsible Personnel Training Program is a requirement of
the:
EPA
State of Maryland
International laws
None of the above - ANS-State of Maryland

The current Maryland Standards and Specifications for Soil Erosion and Sediment Control
(Handbook) is dated:
1994
2000
2011
2013 - ANS-2011

Although 2/3's of the earth's surface is covered in water, what percentage is fresh water?
50%
25%
3%
10% - ANS-3%

The following is the percent of Maryland residents whose household water comes from a
surface water source.
18%
33%
68%
52% - ANS-68%

While water is a necessity for human life, clean water also:
provides critical wildlife habitat
is an important part of Maryland's economy
enhances recreational opportunities
all of the above - ANS-All of the above

The average Marylander uses how many gallons of water per day?

,30
54
77
100 - ANS-100

Maryland's healthy water resources can benefit the economy by providing
water for crop irrigation
water for livestock watering
electrical power generation
good quality fish and shellfish harvests
all of the above - ANS-all of the above

Natural erosion can be caused by
water
ice
wind
gravity
all of the above - ANS-All of the above

Raindrops can strike the soil surface at a velocity of 25-30 feet per second.
true
false - ANS-True

Sediment pollution is harmful because it:
silts in streams, lakes, ponds, rivers, and the Chesapeake Bay
increases turbidity in water which can kill submerged aquatic vegetation
threatens public safety and may increase flooding
carries over abundant nutrients into waterways
all of the above - ANS-all of the above

Sediment runoff to a waterway can result in eutrophication due to
higher fish populations which deplete the oxygen
turbid water which allows for more plant growth
improved condition for spawning
excessive algae growth as a result of increased level of nutrients which enter water bodies
attached to soil particles causing depletion of oxygen - ANS-excessive algae growth as a result
of increased level of nutrients which enter water bodies attached to soil particles causing
depletion of oxygen

The purpose of requiring erosion and sediment control is to:
cause undue hardship and expense on the developer and contractor
provide jobs for government employees
give incentives to contractors by increasing cost of land development

, provide a means for land development while protecting the environment - ANS-provide a means
for land development while protecting the environment

Land development often accelerates the erosion process because
Construction can cause soils to become compacted, inhibiting the absorption of rainfall
Drainage areas are often enlarged during construction, leading to increased runoff velocities
Vegetation, which helps to diffuse the force of raindrops is removed
all of the above - ANS-All of the above

An MDE approved inspection report must be used when conducting self-inspection under the
NPDES General Stormwater Permit for Construction Activity.
true
false - ANS-True

What year did State law mandate that all counties and municipalities in Maryland establish an
erosion and sediment control?
1992
1985
1970
2001
none of the above - ANS-1970

Compliance with the NPDES General Permit for Stormwater Associated with Construction
Activity (for which an NOI is submitted) requires the inspection and documentation of erosion
and sediment controls:
once a month
twice a month
weekly and the next day after a rain event that produces runoff
when contractor and inspector have arranged a meeting
when all stakeholders in the project have arranged a meeting - ANS-weekly and the next day
after a rain event that produces runoff

A NOI must be submitted and coverage obtained under the NPDES General Permit for
Construction Activity for any construction site that disturbs:
5,000 square feet or more
1 acre or more
½ acre or more
5 acres or more - ANS-1 acre or more

If working on a construction site in Allegany County the agency with enforcement authority to
conduct erosion and sediment controls inspections would be:
Allegany County Dept of Public Works
Maryland Department of Environment
Allegany Soil Conservation District - ANS-Maryland Department of Environment

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller modockochieng06. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for CA$11.17. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

73091 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
CA$11.17
  • (0)
  Add to cart