100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
E&S Certification Questions (1). CA$11.47   Add to cart

Exam (elaborations)

E&S Certification Questions (1).

 3 views  0 purchase

E&S Certification Questions (1).

Preview 2 out of 10  pages

  • August 3, 2024
  • 10
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
All documents for this subject (51)
avatar-seller
modockochieng06
E&S Certification Questions

Although 2/3's of earth's surface is water, what percentage is fresh water? - ANS-3%

What percentage of Maryland residents household water comes from a surface water source? -
ANS-68%

Clean water provides: - ANS-*Critical wildlife habitat
*an important part of Maryland's economy
*enhances recreational opportunities

The average Marylander uses how many gallons of water per day? - ANS-100 gallons

Maryland's healthy water resources can benefit the economy by providing - ANS-*Water for crop
irrigation
*Water for livestock watering
*Electrical power generation
*Good quality fish and shellfish harvests

Natural erosion can be caused by - ANS-*Water
*Ice
*Wind
*Gravity

T or F: Raindrops can strike the soil surface at a velocity of 25-30 ft per second - ANS-True

Sediment pollution is harmful because it: - ANS-*Silts in streams, lakes, ponds, rivers, and the
Chesapeake Bay
*Increases turbidity in water which can kill submerged aquatic vegetation
*Threatens public safety and may increase flooding
*Carries over abundant nutrients into waterways

Sediment runoff to a waterway can result in eutrophication due to - ANS-Excessive algae growth
as a result of increased level of nutrients which enter water bodies attached to soil particles
causing depletion of oxygen

The purpose of requiring erosion and sediment control is to - ANS-Provide a means for land
development while protecting the environment

Land development often accelerates the erosion process because - ANS-*Construction can
cause soils to become compacted, inhibiting the absorption of rainfall

, *Drainage areas are often enlarged during construction, leading to increased runoff velocities
*Vegetation, which helps to diffuse the force of raindrops, is removed

T or F: A Maryland Department of the Environment (MDE) approved inspection report must be
used when conducting self-inspection under the National Pollutant Discharge Elimination
System (NPDES) General Stormwater Permit for Construction Activity. - ANS-True

What year did State law mandate that all counties and municipalities in Maryland establish an
erosion and sediment control? - ANS-1970

Compliance with the NPDES General Permit for Stormwater Associated with Construction
Activity (which an Notice of Intent or NOI is submitted) requires the inspection and
documentation of erosion and sediment controls: - ANS-Weekly and the next day after a rain
event that produces runoff

A NOI (Notice of Intent) must be submitted and coverage obtained under the NPDES General
Permit for Construction Activity for any construction site that disturbs: - ANS-5 acres or more

If working on a construction site in Allegany County the agency with enforcement authority to
conduct erosion and sediment controls inspections would be: - ANS-MDE (Maryland
Department of Environment)

Areas of Special Concern with respect to an erosion and sediment control plan include: -
ANS-*Wetlands and streams
*Highly erodible soils
*Steep slopes

The following type of enforcement action could result from violations of erosion and sediment
control requirements: - ANS-*Administrative penalty
*Criminal penalty
*Stop work order
*Civil Penalty

T or F: Perimeter controls must be installed before mass grading commences. - ANS-True

All erosion and sediment control devices must be - ANS-*Built according to approved design
*Stabilized
*Inspected and approved

In general, an approved erosion and sediment control plan is valid for - ANS-2 years

The enforcement authority is responsible for - ANS-Determining compliance with the
implementation and maintenance of erosion and sediment control practices per the approved
plan

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller modockochieng06. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for CA$11.47. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

79271 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
CA$11.47
  • (0)
  Add to cart