100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
IEC 3A QUESTIONS AND ANSWERS FULLY SOLVED CA$20.92   Add to cart

Exam (elaborations)

IEC 3A QUESTIONS AND ANSWERS FULLY SOLVED

 7 views  0 purchase
  • Course
  • IEC
  • Institution
  • IEC

Exam of 110 pages for the course IEC at IEC (IEC 3A)

Preview 4 out of 110  pages

  • October 16, 2024
  • 110
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • IEC
  • IEC
avatar-seller
IEC 3A

The purpose of connecting the main bonding jumper is to ___.
Select one:
a.lead stray currents away from the equipment
b.minimize static electricity
c.provide an effective path for ground-fault current
d.minimize shock hazard - answer2020 NEC: 100_Bonding Jumper, Main
The correct answer is: provide an effective path for ground-fault current

Which of the following determines the severity of an electric shock?I. the path taken by
current through bodyII. the length of time current flowsIII. the amount of current flowing
Select one:
a.II & III only
b.I & II only
c.I & III only
d.I, II & III
e.II only - answerThe correct answer is: I, II & III

Electricians must be concerned with height transitions between areas with different ___
heights.
Select one:
a.roof
b.ceiling
c.both a and b
d.neither a nor b - answerThe correct answer is: both a and b

As used in reference to construction drawing, CAD is an abbreviation for ___.
Select one:
a.Cylindrical Area Dimensions
b.Computer Aided Drafting
c.Centered Air Diffuser
d.Copper or Aluminum Device - answerThe correct answer is: Computer Aided Drafting

BCES Panel LD is located in Main Electrical Room (D154). Conduits can be stubbed
up, turned, and then extended through the ___ wall to the required outlets.I. north II.
east III. south IV. west
Select one:
a.I or II only
b.III or IV only
c.II or III only
d.any of these - answerThe correct answer is: I or II only

,___ is a special moisture-resistant type of gypsum board attached to wall studs and
used in damp areas, such as in bathrooms.
Select one:
a.Durock®
b.Greenboard - answerThe correct answer is: Greenboard

On building project drawings, references made to above finished floor and above floor
are equivalent.
Select one:
a.True
b.False - answerThe correct answer is: False

The wood used in BCES walls to provide substantial support for wall-hung equipment
and millwork is fire-treated lumber.
Select one:
a.True
b.False - answerThe correct answer is: True

___ is a special cement-based type of board attached to wall studs and used in wet
areas, such as in bathrooms.
Select one:
a.Wonderboard®
b.Durock®
c.Hardibacker®
d.any of these - answerThe correct answer is: any of these

The conduit for the drinking fountains on the east side of BCES Corridor D130 can be
installed straight up from the box, through the stud wall behind the equipment.
Select one:
a.True
b.False - answerAs discussed in the curriculum manual, this is a chase-type, half wall,
Type G. The conduit must be routed to an adjacent wall.
The correct answer is: False

On the BCES plans, "SIM" is an abbreviation for ___.
Select one:
a.simulated
b.similar
c.striated imitation marble
d.scaled in metrics - answerThe correct answer is: similar

On architectural plans, "O.H." is an abbreviation for ___. O.H. typically appears adjacent
to detail callouts.
Select one:
a.or higher

,b.opposite hand
c.overhead
d.on hold - answer@ Rm A112 Detail 4 on Dwg A8.1 shows O.H.This detail shows 24"-
deep millwork on the left and 30"-deep millwork on the right For Rm A112 the millwork
detail is Opposite Hand (mirror image) because the deeper portion is on the left.
The correct answer is: opposite hand

Revisions to construction drawings are indicated by ___.
Select one:
a.a numbered, triangular symbol near the revised area or item
b."clouding" around the revised area or item
c.both a and b
d.neither a nor b - answerboth a and b

As a consideration for the receptacle outlet box installation in BCES Room B114, the
stud-to-finish dimension is ___.
Select one:
a.1"
b.5/8"
c.17/8"
d.11/4"
e.11/8" - answer5/8" rock + 3/8" for tile = 1"
The correct answer is: 1"

The walls in BCES Mechanical Room C109 are ___.
Select one:
a.painted CMUs
b.painted sheetrock
c.VWC over sheetrock
d.none of these - answerThe correct answer is: painted sheetrock

BCES Room D136 has a(n) ___ ceiling.
Select one:
a.13'-0"
b.9'-2"
c.open to deck
d.9'-0"
e.19'-0"
f.14'-4" - answerThe correct answer is: 13'-0"

The BCES finish schedule for Area B includes walls finished with ___.I. VWC II. FRP III.
epoxy paint
Select one:
a.I only
b.I & II only
c.II only

, d.I, II & III
e.II & III only
f.I & III only - answerThe correct answer is: I & II only

The floor finish in BCES Room D132 is ___.
Select one:
a.sealed concrete
b.ceramic tile
c.VCT
d.carpet - answerThe correct answer is: VCT

The walls in BCES Room B114 are covered with ___.I. paint II. vinyl III. ceramic tile
Select one:
a.II & III only
b.I only
c.III only
d.I & II only
e.I & III only
f.II only - answerThe correct answer is: I & III only

The floor finish in BCES Room A118 is ___.
Select one:
a.carpet
b.sealed concrete
c.VCT
d.ceramic tile - answerThe correct answer is: sealed concrete

The walls in BCES Room B119 are ___.
Select one:
a.VWC over sheetrock
b.ceramic tile
c.painted sheetrock
d.none of these - answerThe correct answer is: VWC over sheetrock

The floor finish in BCES Room D151 is ___.
Select one:
a.ceramic tile
b.quarry tile
c.sealed concrete
d.glazed tile pavers
e.carpet
f.VCT - answerThe correct answer is: quarry tile

The floor finish in BCES Room B136 is ___.I. ceramic tile II. carpet III. VCT
Select one:
a.II & III only

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller julianah420. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for CA$20.92. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

75323 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
CA$20.92
  • (0)
  Add to cart