100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Abyc exam questions and answers CA$16.59   Add to cart

Exam (elaborations)

Abyc exam questions and answers

 4 views  0 purchase
  • Course
  • ABYC Marine Electrical
  • Institution
  • ABYC Marine Electrical

Abyc exam questions and answers

Preview 2 out of 6  pages

  • November 12, 2024
  • 6
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • ABYC Marine Electrical
  • ABYC Marine Electrical
avatar-seller
Abyc exam questions and answers

require iion iiall iiwet iiexhaust iisystem ii- iiAnswers ii-an iiindicator iiof iiloss iiof iiexhaust
iicooling iiwater iiis


1" ii- iiAnswers ii-the iilowest iipoint iiof iia iiself-bailing iicockpit iisole iishall iibe iihow iihigh
iiabove iithe iifull iiload iiwater iiline


to iiprevent iibilge iipump iicycling ii- iiAnswers ii-a iicheck iivalve iican iibe iiused iiin iia iibilge
iipump's iidischarge iiline


length iiof iidischarge iipiping ii, iinumber iiand iiradius iiof iibends, iiand iiroughness iiof iiinterior
iisurfaces iiof iipiping iiof iifittings ii- iiAnswers ii-as iiinstalled iiwith iia iigiven iihead iipressure,
iibilge iipump iidischarge iicapacity iimay iibe iireduced iiby iisuch iifactors iias


when iithere iiis iian iienclosed iiaccommodation iicompartment ii- iiAnswers ii-a iihigh iibilge
iiwater iialarm iiis iirequired


a iireadily iiaccessible iimanual iiswitch iiis iirequired ii- iiAnswers ii-for iielectric iibilge iipumps
iiinstallations iithat iiare iiequipped iiwith iian iiautomatic iiswitch


125 iif ii- iiAnswers ii-a iiwater iisystem iiheater iisystem iimust iihave iia iimeans iiof iitempering
iithe iiwater iito


100 iippm ii- iiAnswers ii-according iito iiabyc iia iibiologically iicontaminated iiportable iiwater
iisystem iishould iibe iidisinfected iiwith iia iimixture iiof iichlorine iiand iiwater iihaving iia
iistrength iiof iiat iileast


500 iipounds ii- iiAnswers ii-seacocks iishall iibe iiinstalled iiso iithat iithe iisystem iiwill
iiwithstand iia iistatic iiforce iiof


a iiboat iithat iimeets iilevel iiflotation iiperformance iicriteria iiof iiabyc iih8 ii- iiAnswers ii-which
iiof iithe iifollowing iiwould iibe iiexempted iifrom iirequiring iia iiseacock


be iireadily iiaccessible ii- iiAnswers ii-seacocks, iiwhen iirequired, iishall

seacock ii- iiAnswers ii-abyc iistandards iirequire iithat iiall iipiping, iitubing iior iihose iilines
iipenetrating iithe iihull iibelow iithe iimaximum iiheeled iiwaterline iibe iiequipped iiwith iia


600 iivolts ii- iiAnswers ii-when iiax iiand iidc iiconductors iiare iirun iitogether iior iiinstalled iiin
iithe iisame iiterminal iibox iior iienclosure iion iia iigenerator, iithe iidc iiconductors iishall iihave
iia iiminimum iiinsulation iivoltage iirating iiof

, 3% ii- iiAnswers ii-conductors iiused iifor iipanelboard iifeeders iinavigation iilights, iibilge
iiblowers iishall iibe iisized iifor iia iivoltage iidrop iinot iito iiexceed


they iimust iibe iirated iifor ii2x iithe iisystem iivoltage ii- iiAnswers ii-which iiof iithe iifollowing iiis
iifalse iiregarding iigalvanic iiisolators


sum iiof iithe iirating iiof iithe iimain iishore iipower iidisconnect iicircuit iibreakers ii- iiAnswers ii-
in iidual iishore iipower iicord iiapplication's iiusing iia iisingle iigalvanic iiisolator, iithe iicurrent
iirating iiof iithe iigalvanic iiisolator iishall iinot iibe iiless iithan iithe


in iia iiventilated, iidry, iiand iiaccessible iilocation ii- iiAnswers ii-chargers iiand iiinverters
iishall iibe iiinstalled


specified iiby iithe iiinverter iimanufacturer ii- iiAnswers ii-since iithe iioperation iiof iigfci
iidevices iiis iidependent iiof iithe iiwave iiform iiof iithe iiAC iisource, iiGFCI iidevices iiinstalled
iiin iiinverter iioutput iicircuits iishall iibe


current iiand iivoltage ii- iiAnswers ii-battery iichargers iishall iibe iiselected iiand iiset, iior
iiadjusted, iito iicharge iia iibattery iior iibattery iibank's iiat iithe iiappropriate


pass iithe ii2-1/2 iiminute iifire iitest ii- iiAnswers ii-battery iichargers iishall iimeet iiall iiof iithe
iifollowing iirequirements iiEXCEPT


point iib ii- iiAnswers ii-using iithe iidiagram, iiwhen iiinstalling iian iiinverter iithat iiis iinot
iiignition iiprotected iiaboard iia iivessel iiwith iigasoline iiinboard iiengines, iithe iiinverter
iishould iinot iibe iilocated iiat


insolation iitransformer iior iishore iipower iiconverter ii- iiAnswers ii-according iito iiABYC
iiA32, iiwhen iiparalleling iishore iipower iiand iionboard iipower iisources, iithe iiinstallation
iimust iiinclude iia/an


installed iiso iias iinot iito iidisturb iiwater iiflow iinear iiintake iiand iidischarge iifittings ii-
iiAnswers ii-anodes iiused iiin iicathodic iiprotection iisystems iishall iibe


at iileast ii8 iiga iistranded iicopper iiwire, iiidentified iiby iithe iicolor iigreen iior iigreen iiwith iia
iiyellow iistripe ii- iiAnswers ii-cathodic iibonding iiconductors iimay iibe


shall iibe iibonded iito iithe iicathodic iiprotection iisystem ii- iiAnswers ii-to iiminimize iistray
iicurrent iicorrosion, iimetallic iithru-hull iifittings iiinstalled iibelow iithe iinormal iiaccumulation
iiof iibilge iiwater


-200mV ii- iiAnswers ii-according iito iiABYC iiE-2, iiwhat iiis iithe iiminimum iipotential iishift iito
iiachieve iifull iicathodic iiprotection?

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller millyphilip. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for CA$16.59. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

79373 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
CA$16.59
  • (0)
  Add to cart