Ironworker nccer 1 - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Ironworker nccer 1? On this page you'll find 3 study documents about Ironworker nccer 1.
All 3 results
Sort by
-
IRONWORKER NCCER QUESTIONS AND ANSWERS 100% GUARANTEED PASS! 2024
- Exam (elaborations) • 9 pages • 2024
- Available in package deal
-
- CA$18.64
- 3x sold
- + learn more
IRONWORKER NCCER QUESTIONS AND ANSWERS 100% GUARANTEED PASS! 2024 
ASSUMING A GRIP DISTANCE OF 1", WHAT IS THE MINIMUN LENGTH OF THE BOLT REQUIRED FOR A 
3/4" DIAMETER BOLT? - ANS-2 1/4" 
THE LOCATION OF BRIDGING DEPENDS ON THE LENGTH OF THE: - ANS-SPAN 
BEFORE BUNDLES OF DECK CAN BE LANDED ON A BAR JOIST, WHAT ACTION MUST BE COMPLETED? - 
ANS-JOIST MUST HAVE BRIDGING INSTALLED 
WHEN MATERIALS ARE BEING HOISTED TO AN UPPER LEVEL, A TAG LINE IS USED TO: - ANS-HELP 
CONTROL THE LOAD 
ITEMS...
-
Ironworker NCCER (1
- Exam (elaborations) • 6 pages • 2024
-
- CA$11.46
- + learn more
Ironworker NCCER (1
-
2nd Year NCCER Practice Test Questions And Answers 2024-2025, CHAPTER 1 CORE CURRICULUM NCCER TEST REVIEW QS&AS 2024, nElectrician NCCER Questions With Correct Answers 2024, Hand Tools (NCCER) Questions With Correct Answers 2024, IRONWORKER NCCER QUESTION
- Package deal • 29 items • 2024
-
- CA$212.32
- + learn more
2nd Year NCCER Practice Test Questions And Answers 2024-2025 
On drawings, heavy lines that show exterior walls are referred to as ___________________. 
a) object lines 
b) leader lines 
c) extension lines 
d) dimension lines - ANS-a) object lines 
Lines on drawings used to indicate an area that has been cut away and shown in a section view are 

As you read this, a fellow student has made another $4.70
How did he do that? By selling his study resources on Stuvia. Try it yourself! Discover all about earning on Stuvia