Advance Rigger Latest Test – Questions And Verified Answers
Advance Rigger Latest Test – Questions And Verified Answers 
 
 
The operational quadrant between the left-or-right-side outriggers is - Correct Answer over-the-side 
 
Cranes are typically built to be - Correct Answer longer than they are wide 
 
In a multiple-crane lift, the crane with the greatest net capacity must always be - Correct Answer closest to the loads center of gravity 
 
Leverage is defined as - Correct Answer the power applied to a lever to cause the load to move 
 
The quadra...
- Exam (elaborations)
- • 6 pages •
Advance Rigger Latest Test – Questions And Verified Answers 
 
 
The operational quadrant between the left-or-right-side outriggers is - Correct Answer over-the-side 
 
Cranes are typically built to be - Correct Answer longer than they are wide 
 
In a multiple-crane lift, the crane with the greatest net capacity must always be - Correct Answer closest to the loads center of gravity 
 
Leverage is defined as - Correct Answer the power applied to a lever to cause the load to move 
 
The quadra...