100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
CM 1011 Notes Laison Gilbert Questions with 100% Actual correct answers | verified | latest update | Graded A+ | Already Passed | Complete Solution £6.41   Add to cart

Exam (elaborations)

CM 1011 Notes Laison Gilbert Questions with 100% Actual correct answers | verified | latest update | Graded A+ | Already Passed | Complete Solution

 3 views  0 purchase

CM 1011 Notes Laison Gilbert Questions with 100% Actual correct answers | verified | latest update | Graded A+ | Already Passed | Complete Solution

Preview 2 out of 8  pages

  • June 26, 2024
  • 8
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
All documents for this subject (170)
avatar-seller
Hkane
CM 1011 Notes Laison Gilbert
Commercial construction includes: - ANS-Bank, schools, Hotels, Shopping malls, Government
buildings.
F. ALL OF THE ABOVE

Who are the primary players in a construction project? - ANS-Owners,
Design Professionals,
Construction Professionals

What is the name of the weekly magazine dedicated solely to the construction industry? -
ANS-Engineering News Record (ENR)

By whom was the first form of concrete used? - ANS-Romans

Sub-contractors, sub-sub-contractors and sub-sub-sub-contractors under the prime contractor
are entities that directly affect the project and are classified as: - ANS-1st Level of the
Secondary Players

An onsite safety plan should cover any and all possible safety problems inherent with the type of
construction at that site. This is part of: - ANS-Managing Safety

Many construction companies will rotate their new hires through a number of tracks. The entry
level in the field track is the: - ANS-Field Engineer

What sums up the role of an Area Superintendent? - ANS-Assists the Project Superintendent on
large projects

The primary materials used in commercial construction include: - ANS-steel, concrete, glass,
marble, granite, acoustic ceilings.
ALL OF THE ABOVE

What is lean construction? - ANS-Philosophy that focuses on adding value with less work and
the elimination of waste in the building process.

Which of the following is terminology used regarding the in-office work done by the contractor to
assist the actual construction work done in the field? - ANS-Administering the Contract

All of the following are functions of Construction Management except:
A.Financing the project
B.Planning the project
C.Scheduling the project

, D.Estimating the project - ANS-A. Financing the project

Because of early involvement of the construction entity with the planning phase, these two
project delivery methods are similar:
A. Design/build and at-risk CM
B. Design /bid/build and at-risk CM
C. Design/build and Design /bid/build - ANS-A. Design/Build and at-risk CM

Who determines what method of delivery is used on a project? - ANS-Owner

The factors to consider when choosing the delivery method include: - ANS-Cost, time, quality,
design, risk-tolerance, and Owner construction expertise

Which of the following is terminology used regarding used regarding the onsite work done by
the contractor? - ANS-Managing Construction Operations

An estimate is a best-guess of the costs of materials, equipment, and labor to the contractor to
do the project and it includes:
A.General overhead items
B.Profit
C.General overhead items and profit
D.None of the above - ANS-D. None of the above

Which is not a part of the three legged stool of construction?
A.Time
B.Cost
C.Quality
D.Efficiency - ANS-D. Efficiency

The written instructions from an architect or engineer accompanying the project plans pertaining
to the quality of materials and workmanship required for the project is: - ANS-Specifications

A project delivery method in which the owner holds two separate contracts for design and
construction is: - ANS-Design-bid-build method

Which of the following contract types is most popular with design-build project delivery? -
ANS-Cost-plus-fee

What is the tool used to reduce the number of bidders on a public project and to increase the
quality of the contractor pool? - ANS-Prequalification

What is the name of a notification sent to a selected list of contractors, furnishing information on
the submission of bids on a private project? - ANS-invitation for bids

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Hkane. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for £6.41. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

80202 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy revision notes and other study material for 14 years now

Start selling
£6.41
  • (0)
  Add to cart