Aci certification 2 - Study guides, Revision notes & Summaries

Looking for the best study guides, study notes and summaries about Aci certification 2? On this page you'll find 102 study documents about Aci certification 2.

Page 4 out of 102 results

Sort by

CCIL CONCRETE TESTING TECHNICIAN  CERTIFICATION -A23.2-3C EXAM |  QUESTIONS & 100% CORRECT ANSWERS  (VERIFIED) | LATEST UPDATE | GRADEA+
  • CCIL CONCRETE TESTING TECHNICIAN CERTIFICATION -A23.2-3C EXAM | QUESTIONS & 100% CORRECT ANSWERS (VERIFIED) | LATEST UPDATE | GRADEA+

  • Exam (elaborations) • 7 pages • 2024
  • Available in package deal
  • CCIL CONCRETE TESTING TECHNICIAN CERTIFICATION -A23.2-3C EXAM | QUESTIONS & 100% CORRECT ANSWERS (VERIFIED) | LATEST UPDATE | GRADEA+ A23.2-3C 1. Scope Correct Answer: This Test Method specifies the procedure for making and curing compression test cylinders and flexural test beams from samples of plastic concrete. Procedures for both field and laboratory work are included. ACI Correct Answer: American Concrete Institute A23.2-3C 3. Summary Correct Answer: This Test Method is u...
    (0)
  • £7.75
  • + learn more
ACI Certification- Concrete Field Testing Technician Grade 1 CP-1 (12) Exam Questions and Answers
  • ACI Certification- Concrete Field Testing Technician Grade 1 CP-1 (12) Exam Questions and Answers

  • Exam (elaborations) • 18 pages • 2024
  • Available in package deal
  • ACI Certification- Concrete Field Testing Technician Grade 1 CP-1 (12) Exam Questions and Answers ASTM C1064 - Answer-Standard Test Method For Temperature of Freshly Mixed Hydraulic-Cement Concrete The sensor of the temperature measuring device shall be submerged a minimum of ______ inches into the freshly mixed concrete. - Answer-3" The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete to ± ______ °F throughout a range of __________...
    (0)
  • £10.46
  • + learn more
ACI Grade 1 Field Testing Certification Practice Test – 100% Solved
  • ACI Grade 1 Field Testing Certification Practice Test – 100% Solved

  • Exam (elaborations) • 10 pages • 2024
  • Available in package deal
  • ACI Grade 1 Field Testing Certification Practice Test – 100% Solved For concrete with aggregates less than 3 inches, the thermometer must remain in the fresh concrete sample a minimum of 5 minutes or until the temperature reading stabilizes. (T or F) -Answer-False (2-5 minutes) The temperature measuring device must be accurate to within 0.1 degree. (T or F) - Answer- The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete throughout a r...
    (0)
  • £9.69
  • + learn more
ACI Certification Exam Questions and Answers 100% Pass
  • ACI Certification Exam Questions and Answers 100% Pass

  • Exam (elaborations) • 3 pages • 2024
  • Available in package deal
  • ACI Certification Exam Questions and Answers 100% Pass The pressure of method of determining air content can be used on containing _____ _____ aggregate. - Answer- Relatively Dense The pressure method of determining air content cannot be used on concrete containing the following types of aggregate: ______,______,______. - Answer- Lightweight, air cooled blast furnace slag, or aggregates of high porosity. What is the minimum allowable capacity of the measuring bowl used in this test meth...
    (0)
  • £8.14
  • + learn more
ACI Certification Practice Exam Questions and Answers 100% Pass
  • ACI Certification Practice Exam Questions and Answers 100% Pass

  • Exam (elaborations) • 5 pages • 2024
  • ACI Certification Practice Exam Questions and Answers 100% Pass For 4x8 cylinders, how many layers and rod strokes to properly consolidate the concrete? - Answer- 2 layers, 25 strokes For 6x12 cylinders, how many layers and rod strokes to properly consolidate the concrete? - Answer- 3 layers, 25 rod strokes After rodding each layer, the sides of the molds should be tapped 10-15 times with a tapping rod? T/F - Answer- False It should be done with a rubber mallet When rodding the second a...
    (0)
  • £8.91
  • + learn more
ACI Grade 1 Field Testing Certification Practice Test - 2024
  • ACI Grade 1 Field Testing Certification Practice Test - 2024

  • Exam (elaborations) • 10 pages • 2024
  • Available in package deal
  • ACI Grade 1 Field Testing Certification Practice Test - 2024 For concrete with aggregates less than 3 inches, the thermometer must remain in the fresh concrete sample a minimum of 5 minutes or until the temperature reading stabilizes. (T or F) -Answer-False (2-5 minutes) The temperature measuring device must be accurate to within 0.1 degree. (T or F) - Answer- The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete throughout a range of _...
    (0)
  • £9.69
  • + learn more
ACI Grade 1 Field Testing Certification Practice Test – 100% Solved
  • ACI Grade 1 Field Testing Certification Practice Test – 100% Solved

  • Exam (elaborations) • 10 pages • 2024
  • Available in package deal
  • ACI Grade 1 Field Testing Certification Practice Test – 100% Solved For concrete with aggregates less than 3 inches, the thermometer must remain in the fresh concrete sample a minimum of 5 minutes or until the temperature reading stabilizes. (T or F) -Answer-False (2-5 minutes) The temperature measuring device must be accurate to within 0.1 degree. (T or F) - Answer- The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete throughout a r...
    (0)
  • £9.69
  • + learn more
ACI Certification Practice Exam ALL SOLUTION & ANSWERS 100% CORREECT SPRING FALL-2023/24 EDITION AID GRADE A+
  • ACI Certification Practice Exam ALL SOLUTION & ANSWERS 100% CORREECT SPRING FALL-2023/24 EDITION AID GRADE A+

  • Exam (elaborations) • 4 pages • 2023
  • For 4x8 cylinders, how many layers and rod strokes to properly consolidate the concrete? 2 layers, 25 strokes For 6x12 cylinders, how many layers and rod strokes to properly consolidate the concrete? 3 layers, 25 rod strokes After rodding each layer, the sides of the molds should be tapped 10-15 times with a tapping rod? T/F False It should be done with a rubber mallet When rodding the second and/or third layers, the rod must go through the current ;layer and penetrate the previous laye...
    (0)
  • £10.08
  • 1x sold
  • + learn more
CCIL Concrete Testing Technician Certification - A23.2-3C 2024 A23.2-3C
  • CCIL Concrete Testing Technician Certification - A23.2-3C 2024 A23.2-3C

  • Exam (elaborations) • 4 pages • 2024
  • CCIL Concrete Testing Technician Certification - A23.2-3C 2024 A23.2-3C 1. Scope - Correct Answer This Test Method specifies the procedure for making and curing compression test cylinders and flexural test beams from samples of plastic concrete. Procedures for both field and laboratory work are included. ACI - Correct Answer American Concrete Institute A23.2-3C 3. Summary - Correct Answer This Test Method is used to cast compressive or flexural strength test specimens and cure them on s...
    (0)
  • £6.97
  • + learn more
ACI Certification Practice Exam | Questions and Correct Answers | Latest Update 2024/2025
  • ACI Certification Practice Exam | Questions and Correct Answers | Latest Update 2024/2025

  • Exam (elaborations) • 5 pages • 2024
  • Available in package deal
  • ACI Certification Practice Exam | Questions and Correct Answers | Latest Update 2024/2025 For 4x8 cylinders, how many layers and rod strokes to properly consolidate the concrete? - Answer -2 layers, 25 strokes For 6x12 cylinders, how many layers and rod strokes to properly consolidate the concrete? - Answer -3 layers, 25 rod strokes After rodding each layer, the sides of the molds should be tapped 10-15 times with a tapping rod? T/F - Answer -False It should be done with a rubber mallet...
    (0)
  • £8.91
  • + learn more