Aci certification exam 2 - Study guides, Revision notes & Summaries
Looking for the best study guides, study notes and summaries about Aci certification exam 2? On this page you'll find 79 study documents about Aci certification exam 2.
Page 4 out of 79 results
Sort by
-
ACI Certification Practice Exam Questions and Answers 100% Pass
- Exam (elaborations) • 5 pages • 2024
-
- £9.34
- + learn more
ACI Certification Practice Exam 
Questions and Answers 100% Pass 
For 4x8 cylinders, how many layers and rod strokes to properly consolidate the 
concrete? - Answer- 2 layers, 25 strokes 
For 6x12 cylinders, how many layers and rod strokes to properly consolidate the 
concrete? - Answer- 3 layers, 25 rod strokes 
After rodding each layer, the sides of the molds should be tapped 10-15 times with a 
tapping rod? T/F - Answer- False 
It should be done with a rubber mallet 
When rodding the second a...
-
ACI Certification Exam Questions and Answers 100% Pass
- Exam (elaborations) • 3 pages • 2024
- Available in package deal
-
- £8.53
- + learn more
ACI Certification Exam Questions and 
Answers 100% Pass 
The pressure of method of determining air content can be used on containing _____ 
_____ 
aggregate. - Answer- Relatively Dense 
The pressure method of determining air content cannot be used on concrete containing 
the following types of aggregate: ______,______,______. - Answer- Lightweight, air 
cooled blast furnace slag, or aggregates of high porosity. 
What is the minimum allowable capacity of the measuring bowl used in this test 
meth...
-
ACI Certification Exam | Questions and Correct Answers | Latest Update 2024/2025
- Exam (elaborations) • 7 pages • 2024
- Available in package deal
-
- £9.75
- + learn more
ACI Certification Exam | 
Questions and Correct Answers | 
Latest Update 2024/2025 
2. T/F: When the concrete contains large aggregate, the testing 
technician should wet-sieve the sample before making unit weight tests 
for use in yield computations. - Answer -False 
4. T/F: Samples smaller than 28L (1 .) are allowed on routine air 
content, temperature, and slump tests. - Answer -True 
7. How do you regulate the rate of discharge of the batch from the 
revolving truck drum mixer or agitator? -...
-
ACI Certification Practice Exam | Questions and Correct Answers | Latest Update 2024/2025
- Exam (elaborations) • 5 pages • 2024
- Available in package deal
-
- £10.16
- + learn more
ACI Certification Practice Exam | 
Questions and Correct Answers | 
Latest Update 2024/2025 
For 4x8 cylinders, how many layers and rod strokes to properly 
consolidate the concrete? - Answer -2 layers, 25 strokes 
For 6x12 cylinders, how many layers and rod strokes to properly 
consolidate the concrete? - Answer -3 layers, 25 rod strokes 
After rodding each layer, the sides of the molds should be tapped 10-15 
times with a tapping rod? T/F - Answer -False 
It should be done with a rubber mallet...
-
Study Exam for ACI CertificationConcrete Field Testing Technician Grade 1 CP-1 (12) 2024 Updated
- Exam (elaborations) • 13 pages • 2024
- Available in package deal
-
- £12.19
- + learn more
Study Exam for ACI CertificationConcrete Field Testing Technician Grade 
1 CP-1 (12) 2024 Updated 
ASTM C1064 - CORRECT ANSWER-Standard Test Method For Temperature of 
Freshly Mixed Hydraulic-Cement Concrete 
The sensor of the temperature measuring device shall be submerged a minimum of 
______ inches into the freshly mixed concrete. - CORRECT ANSWER-3" 
The temperature measuring device shall have a capacity of measuring temperature of 
freshly mixed concrete to ± ______ °F throughout a ...
Get paid weekly? You can!
-
ACI Certification Exam Questions With Correct Answers Latest Updated 2024/2025 | Scored A+
- Exam (elaborations) • 4 pages • 2024
- Available in package deal
-
- £10.16
- + learn more
The Method of determining air content of concrete containing lightweight aggregate is the pressure 
method. True or False? Answer - False 
When making a test cylinder from concrete being used in construction, the field technician must also 
measure the slump of the concrete. True or False? Answer - True 
While the technician is checking the slump of the concrete, there is a decided falling away or shearing 
off of concrete from one side of the sample. What should the technician do? Answer - Disr...
-
ACI Certification - Concrete Field Testing Technician - Grade 1 - Test Sample Written Exam Questions - CP-1(17) 100% Correct
- Exam (elaborations) • 4 pages • 2024
- Available in package deal
-
- £7.31
- + learn more
ACI Certification - Concrete Field Testing 
Technician - Grade 1 - Test Sample 
Written Exam Questions - CP-1(17) 100% 
 
Correct 
 
The Method of determining air content of concrete containing lightweight aggregate is the 
pressure method. True or False? False 
 
When making a test cylinder from concrete being used in construction, the field technician must 
also measure the slump of the concrete. True or False? True 
 
While the technician is checking the slump of the concrete, there is a deci...
-
ACI Certification Concrete Field Testing Technician Grade 1 Sample Written Test Exam 2024
- Exam (elaborations) • 2 pages • 2024
-
- £9.75
- + learn more
ACI Certification Concrete Field Testing 
Technician Grade 1 Sample Written Test 
Exam 2024 
The Method of determining air content of concrete containing lightweight aggregate is 
the pressure method. True or False? - CORRECT ANSWER-False 
When making a test cylinder from concrete being used in construction, the field 
technician must also measure the slump of the concrete. True or False? - CORRECT 
ANSWER-True 
While the technician is checking the slump of the concrete, there is a decided ...
-
ACI Certification Exam Questions with Complete Solutions | Verified & Updated 2024
- Exam (elaborations) • 5 pages • 2024
- Available in package deal
-
- £9.34
- + learn more
ACI Certification Exam Questions with Complete Solutions | 
Verified & Updated 2024 
ASTM C172 covers sampling from stationary, paving and truck mixers, and from agitating and 
non-agitating equipment used to transport central-mixed concrete. - Answer ️️ -True 
When the concrete contains large aggregate, the testing technician should wet-sieve the sample 
before making unit weight tests for use in yield computations. - Answer ️️ -False 
Samples should be taken before 10% or after 90% of ...
-
ACI Certification Exam Questions and Answers 100% Pass
- Exam (elaborations) • 3 pages • 2024
- Available in package deal
-
- £8.53
- + learn more
ACI Certification Exam Questions and 
Answers 100% Pass 
The pressure of method of determining air content can be used on containing _____ 
_____ 
aggregate. - Answer- Relatively Dense 
The pressure method of determining air content cannot be used on concrete containing 
the following types of aggregate: ______,______,______. - Answer- Lightweight, air 
cooled blast furnace slag, or aggregates of high porosity. 
What is the minimum allowable capacity of the measuring bowl used in this test 
meth...
That summary you just bought made someone very happy. Also get paid weekly? Sell your revision notes on Stuvia! Discover all about earning on Stuvia