The wind tapped - Study guides, Revision notes & Summaries

Looking for the best study guides, study notes and summaries about The wind tapped? On this page you'll find 28 study documents about The wind tapped.

All 28 results

Sort by

ACI Concrete Field Technician - Grade 1 Questions & 100% Verified Answers | Latest  Update | Already Graded A+
  • ACI Concrete Field Technician - Grade 1 Questions & 100% Verified Answers | Latest Update | Already Graded A+

  • Exam (elaborations) • 25 pages • 2024
  • Available in package deal
  • 1. A 6 by 12 in [150 mm by 300 mm] cylinder mold can be used for concrete containing aggregate with particles not exceeding _____ in size, without the need for wet sieving the concrete. ☑: 2 in. [50 mm] 2. According to ASTM C1064, what is one reason to take the temperature of concrete? ☑: Verify conformance to a specified requirement for temperature of concrete 3. After completing the strike-off procedure, what must be done before weighing the measure and sample? ☑: Clean off any e...
    (0)
  • £10.54
  • + learn more
ACI Concrete Field Technician - Grade 1 Exam Questions and Answers 2024
  • ACI Concrete Field Technician - Grade 1 Exam Questions and Answers 2024

  • Exam (elaborations) • 15 pages • 2024
  • Available in package deal
  • ACI Concrete Field Technician - Grade 1 Exam Questions and Answers 2024 1. A 6 by 12 in [150 mm by 300 mm] cylinder mold can be used for concrete containing aggregate with particles not exceeding _____ in size, without the need for wet sieving the concrete. - Answer- 2 in. [50 mm] 2. According to ASTM C1064, what is one reason to take the temperature of concrete? - Answer- Verify conformance to a specified requirement for temperature of concrete 3. After completing the strike-off procedur...
    (0)
  • £10.78
  • + learn more
ACI Concrete Field Technician - Grade 1 Exam Questions and Answers 2024
  • ACI Concrete Field Technician - Grade 1 Exam Questions and Answers 2024

  • Exam (elaborations) • 15 pages • 2024
  • Available in package deal
  • ACI Concrete Field Technician - Grade 1 Exam Questions and Answers 2024 1. A 6 by 12 in [150 mm by 300 mm] cylinder mold can be used for concrete containing aggregate with particles not exceeding _____ in size, without the need for wet sieving the concrete. - Answer- 2 in. [50 mm] 2. According to ASTM C1064, what is one reason to take the temperature of concrete? - Answer- Verify conformance to a specified requirement for temperature of concrete 3. After completing the strike-off procedur...
    (0)
  • £10.78
  • + learn more
ACI Certification Exam Questions With Verified Answers Latest UPDATED 2024/2025 | Scored A+
  • ACI Certification Exam Questions With Verified Answers Latest UPDATED 2024/2025 | Scored A+

  • Exam (elaborations) • 19 pages • 2024
  • Available in package deal
  • ACI Certification Exam Questions With Verified Answers Latest UPDATED 2024/2025 | Scored A+. ASTM C1064 Answer - Standard Test Method For Temperature of Freshly Mixed Hydraulic-Cement Concrete The sensor of the temperature measuring device shall be submerged a minimum of ______ inches into the freshly mixed concrete. Answer - 3" The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete to ± ______ °F throughout a range of ____________. Answ...
    (0)
  • £11.98
  • + learn more
ACI Test Questions With Answers Graded A 2024
  • ACI Test Questions With Answers Graded A 2024

  • Exam (elaborations) • 6 pages • 2024
  • Available in package deal
  • The total time allowed between obtaining the first and final portions of a composite sample is - 15 minutes When it is necessary to wet sieve the concrete sample, wet sieving should be performed after the individual samples are remixed into a composite sample (T or F) - F Tests for slump, temperature, and air content must begin within ______ minutes after obtaining the composite sample - 5 minutes Begin molding test specimens within ______ minutes after obtaining the composite sample - ...
    (0)
  • £8.78
  • + learn more
ACI Grade 1 Field Testing Certification Practice Test - Irving Questions and Answers 100% Solved correctly
  • ACI Grade 1 Field Testing Certification Practice Test - Irving Questions and Answers 100% Solved correctly

  • Exam (elaborations) • 10 pages • 2024
  • Available in package deal
  • For concrete with aggregates less than 3 inches, the thermometer must remain in the fresh concrete sample a minimum of 5 minutes or until the temperature reading stabilizes. (T or F) - Answer-False (2-5 minutes) The temperature measuring device must be accurate to within 0.1 degree. (T or F) - AnswerThe temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete throughout a range of _____ to _____ degree F ( ______ to ______ degree C) - Answer-30 to...
    (0)
  • £6.38
  • + learn more
ACI Grade 1 Field Testing Certification Practice Test  Questions & Answers Solved 100% Correct!!
  • ACI Grade 1 Field Testing Certification Practice Test Questions & Answers Solved 100% Correct!!

  • Exam (elaborations) • 9 pages • 2024
  • Available in package deal
  • For concrete with aggregates less than 3 inches, the thermometer must remain in the fresh concrete sample a minimum of 5 minutes or until the temperature reading stabilizes. (True or False) - AnswerFalse The temperature measuring device must be accurate to within 0.1 degrees. (True or False) - AnswerFalse The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete throughout a range of ______ to ______ Fahrenheit ( - AnswerA composite sample is n...
    (0)
  • £6.38
  • + learn more
ACI Test Questions and Answers Guaranteed A+
  • ACI Test Questions and Answers Guaranteed A+

  • Exam (elaborations) • 6 pages • 2024
  • Available in package deal
  • ACI Test Questions and Answers Guaranteed A+ The total time allowed between obtaining the first and final portions of a composite sample is 15 minutes When it is necessary to wet sieve the concrete sample, wet sieving should be performed after the individual samples are remixed into a composite sample (T or F) F Tests for slump, temperature, and air content must begin within ______ minutes after obtaining the composite sample 5 minutes Begin molding test specimens within...
    (0)
  • £14.77
  • + learn more
ACI Concrete Field Testing Technician - Grade 1 (18) Exam Questions and Answers 2024 Correctly done
  • ACI Concrete Field Testing Technician - Grade 1 (18) Exam Questions and Answers 2024 Correctly done

  • Exam (elaborations) • 29 pages • 2024
  • Available in package deal
  • ASTM C1064 - Answer-Standard Test Method For Temperature of Freshly Mixed Hydraulic-Cement Concrete The end of the temperature sensing portion of the temperature measuring device shall be submerged a minimum of ____ into the freshly mixed concrete. - Answer-3 inches [75 mm] C1064, Sec. 8.1 The temperature measuring device shall have a capacity of measuring the temperature of freshly mixed concrete to ± ____ °F (± ____ °C) throughout a range of ____ °F ( ____ °C). - Answer-±1 °F (±...
    (0)
  • £6.70
  • + learn more
millwright level 2 Rigging Questions and Answers 100% correct
  • millwright level 2 Rigging Questions and Answers 100% correct

  • Exam (elaborations) • 4 pages • 2024
  • Available in package deal
  • millwright level 2 Rigging Questions and Answers 100% correct saddle the safe working load of a rigging hook is accurate only when the load is suspended from the ______________ of the hook 15 OSHA requires that a hook be replaced if the throat has opened _____ percent or more from it's original size. Brainpower Read More Previous Play Next Rewind 10 seconds Move forward 10 seconds Unmute 0:05 / 0:15 Full screen 40 A hook that is point loaded could theoretically c...
    (0)
  • £11.58
  • + learn more