Complete Solutions
An experienced engineer is NECESSARY when designing a:
Correct Answers Movable scaffold system.
HH HH
A worker is using a jackhammer to break concrete. For this
work: Correct Answers The worker must be provided with
HH HH
safety glasses, safety shoes, a hard hat, and hearing protection.
Which term is characterized by an organization's request to be
added to a contractor's liability insurance policy? Correct
HH
Answers Additional insured
HH
Bituminous-material melting kettles: Correct Answers Should
HH HH
not be used within 25 feet (7.62 meters) of buildings or
combustible materials.
When employees are actively engaged in underground
construction work, at least one designated person must be on
duty above ground to: Correct Answers Maintain an accurate
HH HH
count of the employees working underground.
.Part of the requirements for respiratory protection training and
use includes a medical evaluation questionnaire. Prior to
respirator use, who should review the questionnaire responses?
Correct Answers Licensed health care professional
HH HH
Establishing written standard operating procedures for
construction tasks is: Correct Answers Best for high-risk work.
HH HH
, What type of loss resulting from an accident is NOT insurable
but is ultimately measurable in a monetary sense? Correct HH
Answers Indirect
HH
A job safety analysis is: Correct Answers Used for evaluating
HH HH
each step of a job to understand its hazards and to identify
hazard controls.
Who MOST influences the safe work habits of subcontractor
employees? Correct Answers First-line supervisor
HH HH
If an employer recommends that employees wear personal
protective equipment to protect them from exposure to
occupational hazards, then: Correct Answers The employer
HH HH
must furnish the personal protective equipment
Where is the FIRST place that an employee on a jobsite should
seek specific health information on a chemical? Correct
HH
Answers Container label
HH
According to the fire tetrahedron model, which ingredients and
process(es) are necessary simultaneously for a fire to continue to
burn? Correct Answers Elevated temperature, oxygen, fuel,
HH HH
and chain reaction
A personnel platform is used by welders during a pre-cast
erection procedure. Which feature of the crane is likely to be
provided expressly for this job? Correct Answers Anti-two-
HH HH
blocking device