Guide and Practice Questions
What is the MAXIMUM penalty for a contractor who undertakes work without the proper
class of license? - Answer- ✔✔$500 fine per day for each day of violation plus penalties
for a misdemeanor.
All Class A contractor licensure applications MUST include - Answer- ✔✔information on
the knowledge, skills, and abilities of the applicant.
What is the PRIMARY purpose of licensing? - Answer- ✔✔Protect the health and
welfare of the public.
When a claimant is paid funds from the Contractors Recovery Trust Fund - Answer-
✔✔the contractor's license is revoked. !!!
The application for licensure MUST include - Answer- ✔✔the business address of the
proposed designated employee.
Which of the following is a requirement for a joint venture? - Answer- ✔✔Either the joint
venture or each contracting party of the joint venture must be licensed.
All of the following must be licensed EXCEPT - Answer- ✔✔a material supplier who
advises a contractor.
How much is the Class A initial license fee? - Answer- ✔✔$200
A licensee's name change MUST be reported to the Board within a MAXIMUM of how
many days? - Answer- ✔✔30 days
According to the Board Rules and Regulations, a full-time employee is one who works a
MINIMUM of how many hours per week? - Answer- ✔✔30 hours.
A firm desiring to be licensed as a Class B contractor MUST have a MINIMUM net
worth of - Answer- ✔✔$15,000.
According to the Board Rules and Regulations, which of the following could be a
qualified individual? - Answer- ✔✔Any full-time employee.
An appeal of the local building official's decision to refuse to grant a modification to the
USBC MUST be made to the local building board within a MAXIMUM of how many
days? - Answer- ✔✔90 days.
, A building official MUST issue a certificate of occupancy for a building that meets all the
requirements for a certificate within a MAXIMUM of how many working days after the
certificate was requested? - Answer- ✔✔5
Additions to buildings MUST comply with - Answer- ✔✔the current code for new
construction.
When MUST the work be stopped following the issuance of a stop work order? -
Answer- ✔✔Immediately
Who is to be in charge of a local building department? - Answer- ✔✔Building official.
Contractors who are assessed a fee to support the Transaction Recovery Fund MUST
pay this fee within a MINIMUM of how many days from when the assessment fee notice
was mailed? - Answer- ✔✔45 days
Contractors will be assessed a fee for the Transaction Recovery Fund whenever the
fund balance is less than - Answer- ✔✔$400,000.
Payments made by the Transaction Recovery Fund to claimants may include an
amount for - Answer- ✔✔attorneys' fees.
A contract for which of the following types of structures may be subject to recovery from
the Transaction Recovery Fund? - Answer- ✔✔Residential only.
A verified claim for payment from the Transaction Recovery Fund MUST occur within a
MAXIMUM of what period of time from the date the claimant was awarded a final
judgment? - Answer- ✔✔12 months.
An appeal of a final decision of a county on an erosion control plan MUST be filed within
a MAXIMUM of how many days? - Answer- ✔✔30 days.
Temporary erosion and sediment control measures MUST be removed within a
MAXIMUM of how many days after the final site stabilization? - Answer- ✔✔30 days.
Which of the following statements about a sole proprietorship is TRUE? - Answer-
✔✔The business, or any part of it, can be sold, altered, or exchanged at will.
What type of business organization allows people to share financial resources? -
Answer- ✔✔Partnership.
Which of the following estimating methods is typically used by the architect rather than
the contractor? - Answer- ✔✔Conceptual estimate.