COSC 153 Final QUESTIONS & ANSWERS(RATED A)COMPLETE EXAM BUNDLECOSC 153 Final QUESTIONS & ANSWERS(RATED A)COMPLETE EXAM BUNDLECOSC 153 Final QUESTIONS & ANSWERS(RATED A)COMPLETE EXAM BUNDLECOSC 153 Final QUESTIONS & ANSWERS(RATED A)COMPLETE EXAM BUNDLECOSC 153 Final QUESTIONS & ANSWERS(RATED A)COMP...

[Meer zien]
15 items

COSC 153 correct QUESTIONS & ANSWERS

(0)
€9,45

How many subcontractors and sub-subcontractors are there typically? - ANSWER 10-50 What is crucial about subcontractor coordination? - ANSWER The scope of services What are a necessary requirement for communication? - ANSWER Meetings

Bekijk voorbeeld

COSC 153 2024 LATEST UPDATE CORRECT 100%

(0)
€12,29

Any successful relationship relies on successful ___________ - ANSWER Communication ________ document prepared by a subcontractor or general contractor where they seek clarification and direction on questions related to the contract documents - ANSWER request for information _______ is The fir...

Bekijk voorbeeld

COSC 153 Questions & Solutions

(0)
€9,45

What is the name of the stone carvings dating back to the pyramids that contained the first written regulations pertaining to construction, commonly referred to as the first known building code? - ANSWER Code of Hammurabi By what specific measurement is construction used as an economic indicator ...

Bekijk voorbeeld

COSC 153 - Chapter 13 RQ & Terms Correct 100%

(0)
€9,45

What are the three fundamental objectives of a quality management plan? - ANSWER Do things the right the first time, prevent things from going wrong in the first place, continually improve the construction process. What is the difference between quality control and quality assurance? - ANSWER Con...

Bekijk voorbeeld

COSC 153 Final Daddy Cooke Complete Questions & answers(RATED A)

(0)
€10,40

The historical time frame covering the constructions of pyramids in Egypt is a time when the distinctions between the design and construction professionals identified the following as builders - ANSWER Master Builders During the roman empire, they developed which of the following? 1-concrete, 2-b...

Bekijk voorbeeld

COSC 153 Part 2 Complete Questions & solutions(RATED A)

(0)
€10,40

What are the 4 design stages? - ANSWER Programming Stage, Schematic Design, Design Development, Construction Documents Programing Stage - ANSWER Written statement of the requirements that identify important information. Happens prior to start Schematic Design - ANSWER Create a basic design ide...

Bekijk voorbeeld

COSC 153 GUY COOKE EXAM 2 CORRECT 100%

(0)
€9,45

Name the four fundamental stages of the construction management process after the design stage. - ANSWER Pre construction, procurement, construction and post construction What are the five distinct stages of the design process? - ANSWER programming, feasibility, schematic design, design developme...

Bekijk voorbeeld

COSC 153 Final QUESTIONS & ANSWERS(RATED A)

(0)
€11,35

The Project Phases - ANSWER - Design - Pre-Construction - Procurement - Construction - Post-Construction - Owner Occupancy Phase 1 of Construction - ANSWER Demolition Phase 1 - Demolition - ANSWER - Demo of existing utilities - Demo of physical buildings - Demo of landscaping or other p...

Bekijk voorbeeld

COSC 153 Chapter 7 QUESTIONS & ANSWERS(RATED A)

(0)
€9,45

When does the pre-construction phase take place? - ANSWER Before design is complete and construction begins. What are three ways owners can benefit from alternative project delivery methods? - ANSWER Low cost, high quality, innovation. Define pre-construction services - ANSWER Evaluation activ...

Bekijk voorbeeld

COSC 153 Chapter 5 LATEST UPDATE 2024 CORRECT 100%

(0)
€9,45

Name the four fundamental stages of the construction management process after the design stage. - ANSWER Pre-construction, procurement, construction, and post-construction. What are the four distinct stages of the design process? - ANSWER Programming and feasibility, schematic or conceptual desig...

Bekijk voorbeeld

COSC 153 Chapter 10 QUESTIONS & CORRECT SOLUTIONS(GRADED A)

(0)
€9,45

Identify at least three issues that the superintendent must be concerned with when trying to manage construction operations. - ANSWER Subcontractor coordination, material and equipment deliveries, and productivity. When scheduling subcontractors for the job, you should try to follow three fundame...

Bekijk voorbeeld

COSC 153 Chapter 8 QUESTIONS & ANSWERS(RATED A)

(0)
€9,45

What is a construction estimate? - ANSWER Summary of probable quantities and costs of materials, labor, equipment, and subcontracts to complete a project, including taxes, overhead, and profit, based on the best available information at the time. Name the four primary categories of costs in the ...

Bekijk voorbeeld

Cooke's COSC 153 Exam 3 Review CORRECT 100%

(0)
€9,45

How does the contractor receive clarification from the architect regarding details of the design? - ANSWER Addenda, Change order request, RFI responses, or Submittal approvals What is the purpose of a submittal? - ANSWER Product Data, Product Sample, Color Options, and Product literature The p...

Bekijk voorbeeld

COSC 153 Exam 3 LATEST UPDATE 2024 CORRECT 100%

(0)
€9,45

How does the contractor receive clarification from the architect regarding details of the design? - ANSWER An RFI, Addenda, Change order request, Submittal approvals What is the purpose of a submittal? - ANSWER Product Data Product Sample Color Options Product literature

Bekijk voorbeeld

COSC 153 Guy Cooke final EXAM CORRECT QUESTIONS & ANSWERS(RATED A)

(0)
€10,40

Characteristics of a good estimators would include which of the following? Select all than apply. - ANSWER Visualization Skills Detailed numbers skills Technical abilities Are construction estimates typically organized by construction specification institute division of work? t/f - ANSWER true ...

Bekijk voorbeeld
avatar-seller

Dit zijn jouw voordelen als je samenvattingen koopt bij Stuvia:

Bewezen kwaliteit door reviews

Bewezen kwaliteit door reviews

Studenten hebben al meer dan 850.000 samenvattingen beoordeeld. Zo weet jij zeker dat je de beste keuze maakt!

In een paar klikken geregeld

In een paar klikken geregeld

Geen gedoe — betaal gewoon eenmalig met iDeal, creditcard of je Stuvia-tegoed en je bent klaar. Geen abonnement nodig.

Direct to-the-point

Direct to-the-point

Studenten maken samenvattingen voor studenten. Dat betekent: actuele inhoud waar jij écht wat aan hebt. Geen overbodige details!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper shantelleG. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €31,22. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 70113 samenvattingen verkocht

Opgericht in 2010, al 15 jaar dé plek om samenvattingen te kopen

Begin nu gratis

Laatst bekeken door jou


€149,36 €31,22
  • (0)
In winkelwagen
Toegevoegd