Ironworker - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Ironworker? On this page you'll find 21 study documents about Ironworker.
Page 2 out of 21 results
Sort by
-
Orientation Training for Ironworkers chapter 2 - Safety Exam Questions & Answers 100% Correct
- Exam (elaborations) • 2 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
PPE - ANSWER-Personal Protection Equipment 
 
OSHA - ANSWER-Occupational Safety and Health Administration 
 
toprails - ANSWER-horizontal barriers on the top of the system 
 
midrails - ANSWER-barriers installed between the top edge of a guardrail system and the waling/working level 
 
uprights - ANSWER-vertical members that support other parts of the guardrail system 
 
toeboards - ANSWER-a small barrier that installs on all open sides of the work platform 
 
portable ladders - ANSWER-straight ...
-
Reinforcing Steel || A+ Guaranteed.
- Exam (elaborations) • 19 pages • 2024
-
Available in package deal
-
- $12.89
- + learn more
what must be large enough and in the right places to accommodate building movement from earthquakes? correct answers A:Gaps or joints between cladding 
 
Why: The cladding on the outside of some buildings can sustain damage and even fall off if it does not allow the building to flex when the ground shakes. Precast concrete cladding, with or without stone facing, is heavy. The steel connections holding it to the building must be strong enough to allow the building to move in an earthquake withou...
-
Ironworker NCCER
- Exam (elaborations) • 6 pages • 2024
-
- $7.99
- + learn more
Ironworker NCCER
-
Ironworker NCCER
- Exam (elaborations) • 6 pages • 2024
-
- $7.99
- + learn more
Ironworker NCCER
-
Ironworker NCCER
- Exam (elaborations) • 6 pages • 2024
-
- $7.99
- + learn more
Ironworker NCCER
Fear of missing out? Then don’t!
-
OSHA 3115 - Fall Protection || Already Passed.
- Exam (elaborations) • 7 pages • 2024
-
Available in package deal
-
- $10.89
- + learn more
What is a competent person correct answers A Competent person means one who is capable of identifying existing and predictable hazards in the surroundings or working conditions which are unsanitary, hazardous, or dangerous to employees, and who has authorization to take prompt corrective measures to eliminate them 
 
Qualified Person correct answers One who, by possession of a recognized degree, certificate, or professional standing, or by extensive knowledge, training, and experience, has succe...
-
Ironworker NCCER (1
- Exam (elaborations) • 6 pages • 2024
-
- $7.99
- + learn more
Ironworker NCCER (1
-
SSPC - C3 - Unit 1 Questions and Answers 100% Solved correctly
- Exam (elaborations) • 2 pages • 2024
- Available in package deal
-
- $7.29
- + learn more
What is the highest percentage of lead usage is for manufacturing? - Answer-Battery 
What is the 3 primary sources of lead in the environment today include lead in? - Answer-Air , Soil and 
Water 
which is the principal source of lead to the industrial painter is through exposure to? Air , Water or Soil - 
Answer-Soil 
I what year lead was banned from residential ? - Answer-1970 
What is the allowance concentration of lead in pain packaged for sale to the retail market? - Answer-0.06 
% or 600 p...
-
Struck by Hazards OSHA-10 Questions & Answers Solved 100% Correct!!
- Exam (elaborations) • 6 pages • 2024
- Available in package deal
-
- $7.99
- + learn more
A construction worker was moving tar paper in a bucket to the top of a building. The bucket tilted, and 
the rolls spilled out, striking a worker in the head causing blunt force trauma. What type of event is this? 
- Struck-by 
A crew of ironworkers and a crane operator were unloading a 20-ton steel slab from a low-boy trailer 
using a 50-ton crawler crane with a 90-foot lattice boom. The operator was inexperienced using this 
crane and did not know the length of the boom. Further, no one had de...
-
CSLB Concrete C8 License Practice Test #4 Questions And Well Explained Answers
- Exam (elaborations) • 11 pages • 2024
-
- $7.99
- + learn more
CSLB Concrete C8 License Practice Test 
#4 Questions And Well Explained 
Answers 
 
 
 
 Which of the following factors directly impact each other in the process of cost estimation for a 
concrete building project? - answer Interest rate, Holding cost, Cost escalation 
 
 Which of the following points are true about Work Breakdown Structure (WBS) in the planning 
of a construction project? - answer Decomposing of a task into doable, measureable, estimable , 
and schedulable units 
 ...
Do you wonder why so many students wear nice clothes, have money to spare and enjoy tons of free time? Well, they sell on Stuvia! Imagine your study notes being downloaded a dozen times for $15 each. Every. Single. Day. Discover all about earning on Stuvia