Millwright Rigging & Lifting Exam Questions With Verified Answers 2024/2025
- Exam (elaborations) • 17 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
Millwright Rigging & Lifting Exam 
Questions With Verified Answers 2024/2025 
The breaking strength of rope is 
a. force needed to pull rope 
b. force needed to tear rope 
c. force needed to break the rope 
d. force needed to stretch rope - answerc. force needed to break the rope 
What are spreader beams used for? 
a. calculate loads 
b. use on heavy lods 
c. support loads during lifts 
d. support long loads during lifts - answerd. support long loads during lifts 
What are equalizer beams used f...
-
Millwright - Rigging and Hoisting Exam Questions With Verified Answers
- Exam (elaborations) • 12 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
Millwright - Rigging and Hoisting Exam 
Questions With Verified Answers 
1. Of a block and tackle with five rope falls and minimum friction, how much force is needed to 
retain 
250lbs? 
a. 50 lbs 
b. 100 lbs 
c. 250 lbs 
d. 75 lbs - answera. 50 lbs 
250lbs/5 = 50 lbs 
2. What diameter rope is needed to support two tons using a vertical lift? 
a. ½" 
b. ¾" 
c. 1" 
d. ¼" - answera. ½" 
3. What is the standard safety factor to consider for a platform supporting people? 
a. 1 : 1 
b. 5 : 1...
-
NCCCO Mobile Crane Core Study guide to help prepare you for the mobile crane core written exam
- Exam (elaborations) • 33 pages • 2024
-
Available in package deal
-
- $10.00
- + learn more
Signal Person Qualifications (OSHA) 
1926.1428 
Hoisting Personnel (OSHA) 
1926.1431 
Authority to Stop (OSHA) 
1926.1418 
Powerline Safety (OSHA) 
1926.1407 thru 1926.1411 
Scope (OSHA) 
1926.1400 
Inspections (OSHA) 
1926.1412 
Tower Cranes (OSHA) 
1926.1435 
Wire Rope Inspections (OSHA) 
1926.1413 
Mobile Cranes (ASME) 
B30.5 
Slings (ASME) 
B30.9 
Hooks (ASME) 
B30.10 
Jack's (ASME) 
B30.1 
Personnel lifting systems (ASME) 
B30.23 
Tower Cranes (ASME) 
B30.3 
Rigging Hardware (ASME) 
B30.26...
-
Millwright - Rigging and Hoisting Exam Questions With Verified Answers Graded A+
- Exam (elaborations) • 8 pages • 2024
-
- $10.50
- + learn more
Millwright - Rigging and Hoisting Exam Questions With Verified Answers Graded A+ 
1. Of a block and tackle with five rope falls and minimum friction, how much force is needed to retain 
250lbs? 
 
a. 50 lbs 
b. 100 lbs 
c. 250 lbs 
d. 75 lbs 
a. 50 lbs 
 
250lbs/5 = 50 lbs 
 
 
2. What diameter rope is needed to support two tons using a vertical lift? 
 
a. ½" 
b. ¾" 
c. 1" 
d. ¼" 
a. ½" 
 
 
3. What is the standard safety factor to consider for a platform supporting people? 
 
a. 1 : 1...
-
OECP Top Common Tested Questions and CORRECT Answers 2024
- Exam (elaborations) • 12 pages • 2024
-
- $7.99
- + learn more
What is the safety factor for pendants or standing ropes? 3/1 for normal operations 
2.5/1 for boom erection 
Safe working load (SWL) is ______ Rated Strength 
The effective weight of an erected extension would be higher or lower than its actual weight? 
Higher 
How much twist is allowed in a crane hook? None 
What is the horizontal distance a stand takes for one complete rotation around the ropes core? 
Rope lay or lay length 
What deficiencies are you looking for in pendants or standing rope...
Get paid weekly? You can!
-
Mobile Crane Questions Test 1 Questions and Answers | Latest Update | Graded A+
- Exam (elaborations) • 8 pages • 2024
-
Available in package deal
-
- $10.09
- + learn more
Mobile Crane Questions Test 1 
 
Questions and Answers | Latest Update | 
 
Graded A+ 
 
According to ANSI B30.23 personnel platform lifts should not be made with wind in excess of: 
20 mph 
 
After the crane has been checked out before lifting a personnel basket, the crew should: Have 
a pre-lift meeting 
 
All hazards and potential problems should be discovered during the: Pre-lift site inspection. 
 
By order of hitch strength, which is the correct answer? Basket, vertical, choker. 
 
During ...
-
COO Practice Written Exam Questions and Answers
- Exam (elaborations) • 28 pages • 2024
-
Available in package deal
-
- $12.00
- + learn more
What are some hazards for mobile cranes excavations? - Vibrations from other equipment, previously excavated soils 
When do you consider the weight of the wire rope to be part of the load for deductions? - Multi part reeve when extra line is not necessary to make the pick 
You never take the weight of the wire rope on top of the boom as a deduction? - True 
What best describes a luffing jib? - Boom with a dedicated winch that acts independent of the main boom. 
Where does most boom damage come f...
-
COO Practice Written Exam Questions and Answers
- Exam (elaborations) • 28 pages • 2024
-
Available in package deal
-
- $12.00
- + learn more
What are some hazards for mobile cranes excavations? - Vibrations from other equipment, previously excavated soils 
When do you consider the weight of the wire rope to be part of the load for deductions? - Multi part reeve when extra line is not necessary to make the pick 
You never take the weight of the wire rope on top of the boom as a deduction? - True 
What best describes a luffing jib? - Boom with a dedicated winch that acts independent of the main boom. 
Where does most boom damage come f...
-
Rigging--with 100% correct answers 2024/2025
- Exam (elaborations) • 1 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
Rigging--with 100% correct answers 2024/2025Determine if this statement is true or false. The two types of wire rope center core designs are fiber core and independent wire rope core. - correct answer true Page 2 
 
What is the percentage gain in strength using an IWRC versus a fiber core wire rope? - correct answer 7.5 Page 3 
 
What characteristic increases in a wire rope by using a rope with more strands and more wires in the strands? - correct answer Flexibility 
 
Determine if this statemen...
-
Millwright's Formula's 2
- Exam (elaborations) • 4 pages • 2024
-
Available in package deal
-
- $7.99
- + learn more
Millwright's Formula's 2 
 
Wire rope 
SWL ANSWER Rule of thumb. 
3/8 " Dia. Is rated for 1 ton. Every 1/8" in Dia. Larger is 1 more ton. 
 
Basket hitch ANSWER Sling doubled to hook. 
SWL =SWL1 x (H/L) 
x 2 
 
Choker hitch 
Over 450 ANSWER Sling choker through eye and back to hook. 
SWL = SWL1 x 3/4 
 
Choker hitch 
Less than 450 ANSWER SWL = SWL1 x A/B 
 
Double basket hitch ANSWER SWL = SWL1 x H/L x 4 
 
Woodruff keys ANSWER First # is x 1/32" for width. 
Second # is x 1/8" for Dia. 
E....