NCIDQ – IDPX EXAM| 232 QUESTIONS| WITH COMPLETE SOLUTIONS
A: Door Schedule Where would it be best to call out the frame material on an entry door? A. door schedule B. finish schedule C. hardware schedule D. finish plan A: 'I' should be used for interior design sheets when an architect's drawings are included as part of the drawing set 'I' is most commonly used when architectural drawings are also included in a drawing set, as a means to easily distinguish between architectural and interiors work. When would be most appropriate for an interior designer to use the prefix letter ‘I’ when numbering a set of construction drawings? A: ‘I’ should be used for interior design sheets when an architect’s drawings are included as part of the drawing set B: ‘I’ should be used for small interior design projects only C: 'I’ should never be used; the letter ‘A’ should always be used for any sheets pertaining to either architectural or interior design D: ‘I’ should always be used for all interior design sheets in a drawing set B: List the information in a proprietary specification. A proprietary specification calls out one single item by brand name, manufacturer, and model number. Proprietary specifications are the most restrictive as they give the interior designer complete control over what is to be installed in a project. Sometimes the specifications include an "or equal" clause (referred to as a "base-bid specification"), which means the substitution of other products will be allowed if the contractor thinks they are equal to the one specified. With a proprietary specification, the interior designer can also require that a sample be submitted to further verify that the item meets the project needs, but requesting a sample alone is not the best way. What is the best way for an interior designer to ensure that the exact product desired will be used in the final design? A: Require that the contractor submit samples of all items before purchasing. B: List the information in a proprietary specification. C: Show the configuration of the product on the drawings, and call it out specifically. D: Write a closed, descriptive specification. B: wall-to-wall carpeting Carpeting is a finish item (like paint or ceiling tile) that is attached to the construction and is typically part of the construction contract. Even though a sculpture is physically attached to the construction, it is commissioned direct
École, étude et sujet
- Établissement
-
Liberty University
- Cours
-
NCIDQ IDPX
Infos sur le Document
- Publié le
- 24 novembre 2022
- Nombre de pages
- 50
- Écrit en
- 2022/2023
- Type
- Examen
- Contient
- Questions et réponses
Sujets
-
ncidq – idpx exam| 232 questions| with complete solutions
Document également disponible en groupe