Outage - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Outage? On this page you'll find 1497 study documents about Outage.

Page 4 out of 1.497 results

Sort by

Progression: Construction Coordinator I - II Exam Answered Correctly.
  • Progression: Construction Coordinator I - II Exam Answered Correctly.

  • Summary • 10 pages • 2023
  • Progression: Construction Coordinator I - II Exam Answered Correctly. A chain trencher A return path sweep-and-alignment system is used to adjust which of the following? Anomalies, such as echoes and blind spots, can hide cable faults or cause a technician to misinterpret the signature of a time domain reflectometer (TDR) waveform. What causes an echo on a waveform TDR? As the RF signal travels on the coaxial cable, one portion of the signal may be attenuated more than the others. ...
    (0)
  • CA$14.78
  • 6x sold
  • + learn more
PJM transmission operations quiz Questions with Correct Answers 100% Verified
  • PJM transmission operations quiz Questions with Correct Answers 100% Verified

  • Exam (elaborations) • 22 pages • 2024
  • Available in package deal
  • PJM transmission operations quiz Questions with Correct Answers 100% Verified What is the submission requirement for a planned transmission outage of 20 calendar days that is scheduled to start on October 10 and be considered on time A. September 30 B. April 1 C. October 1 D. September 1 - Correct Answer B. April 1 Since PJM operates to a 5% voltage drop limit on the 500 KV system which of the following would be considered a violation A. Pre-536KV, post - 507KV B. Pre-545 kV, post ...
    (0)
  • CA$18.84
  • + learn more
Georgia Property & Casualty Exam
  • Georgia Property & Casualty Exam

  • Exam (elaborations) • 28 pages • 2024
  • Which of the following correctly describes a principal difference between a dwelling policy and a homeowners policy? A.) A dwelling policy only covers the dwelling, other structures, personal property, fair rental value, and additional living expenses. It does not cover liability. B.) Both policies are almost identical, except that the homeowners policy focuses on the more expensive homes. C.) A dwelling policy requires that the owner occupy the dwelling. D.) Although any one- to four-fami...
    (0)
  • CA$20.29
  • + learn more
PJM Transmission Exam Study Guide | Questions with 100% Correct Answers | Verified| Latest Updated 2024.
  • PJM Transmission Exam Study Guide | Questions with 100% Correct Answers | Verified| Latest Updated 2024.

  • Exam (elaborations) • 39 pages • 2024
  • PJM Transmission Exam Study Guide | Questions with 100% Correct Answers | Verified| Latest Updated 2024. During System Restoration, what is the optimal Frequency Range? 59.75 - 61 Hz The 500 kV system has normal bus voltages between? 500 to 550 kVRead More When Connecting 2 islands, the operator must match? Voltage, Phase Angle and Frequency What are the Minimum Source Requirements for a 500kV line? (Gen/mile and load/mile) 30 MW Gen/mile of energized 500 kV and 20 MW Load/mile of energi...
    (0)
  • CA$20.29
  • + learn more
NERC PREP TEST 101| 200 Questions| accurate Answers| Latest Update
  • NERC PREP TEST 101| 200 Questions| accurate Answers| Latest Update

  • Exam (elaborations) • 38 pages • 2024
  • NERC PREP TEST 101| 200 Questions| accurate Answers| Latest Update 1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? a. Generator MVAR output would increase b. All system capacitors would trip off-line c. Generator MVAR output would decrease d. All automatic reactors would connect to the system - ANSWER a. Generator MVAR output would increase 2. When system conditions are s...
    (0)
  • CA$20.29
  • + learn more
Secure Email Gateway: Fundamentals Warrior Certification Exam | 100% Correct Answers | Verified | Latest 2024 Version
  • Secure Email Gateway: Fundamentals Warrior Certification Exam | 100% Correct Answers | Verified | Latest 2024 Version

  • Exam (elaborations) • 13 pages • 2024
  • Category :Greylisting Policy When a sender retries delivery of a message to Mimecast, what is the the minimum and maximum amounts of time that Mimecast will accept a previously Deferred Message? - If the MTA retries after 60 seconds and before the 12 hour upper limit, the message is accepted Category: Auto Allow Policy Which Policy is not bypassed based by an Auto Allow entry? - Content Examination Category: External Directories External Directories are where an Administrator goes to rese...
    (0)
  • CA$16.66
  • + learn more
PJM Transmission Exam Study Guide | Questions with 100% Correct Answers | Verified| Latest Updated 2024.
  • PJM Transmission Exam Study Guide | Questions with 100% Correct Answers | Verified| Latest Updated 2024.

  • Exam (elaborations) • 39 pages • 2024
  • PJM Transmission Exam Study Guide | Questions with 100% Correct Answers | Verified| Latest Updated 2024. During System Restoration, what is the optimal Frequency Range? 59.75 - 61 Hz The 500 kV system has normal bus voltages between? 500 to 550 kVRead More When Connecting 2 islands, the operator must match? Voltage, Phase Angle and Frequency What are the Minimum Source Requirements for a 500kV line? (Gen/mile and load/mile) 30 MW Gen/mile of energized 500 kV and 20 MW Load/mile of energi...
    (0)
  • CA$18.84
  • + learn more
PJM Questions & Correct Answers | Latest  Update |Already Graded A+
  • PJM Questions & Correct Answers | Latest Update |Already Graded A+

  • Exam (elaborations) • 47 pages • 2024
  • During System Restoration, what is the optimal Frequency Range? : 59.75 - 61 Hz The 500 kV system has normal bus voltages between? : 500 to 550 kV When Connecting 2 islands, the operator must match? : Voltage, Phase Angle and Frequency What are the Minimum Source Requirements-(500kV+) for a 500 kV? : 30 MW Gen/mile of energized 500 kV and 20 MW Load/mile of energized 500 kV When will PJM issue a Minimum Generation Alert? : When expected generation levels fall within 2500 MW of normal op...
    (0)
  • CA$19.56
  • + learn more
Cole's EHS NEHA Exam Study Guide | 270 Questions and Correct Answers 2024/2025 Updated
  • Cole's EHS NEHA Exam Study Guide | 270 Questions and Correct Answers 2024/2025 Updated

  • Exam (elaborations) • 20 pages • 2024
  • Available in package deal
  • Cole's EHS NEHA Exam Study Guide | 270 Questions and Correct Answers 2024/2025 Updated How do you filter out giardia lambia? - Answer - Rapid sand filtration Pharmaceuticals in water treatment plants are - Answer - Both solid and liquid Which mosquito is the highest cause of encephalitis in the US? - Answer - Culex What is it called when milk is heated to 191-212 - Answer - Pasteurization Order of priority: power outage at restaurant, chlorine gas leak at pool, no hand sink at food fest...
    (0)
  • CA$18.84
  • + learn more
NERC TEST 200 Exam Questions and Answers Latest 2024/2025 (100% Verified)
  • NERC TEST 200 Exam Questions and Answers Latest 2024/2025 (100% Verified)

  • Exam (elaborations) • 54 pages • 2024
  • NERC TEST 200 Exam Questions and Answers Latest 2024/2025 (100% Verified) When system conditions are such that emergency procedures are expected to be implemented, which of the following actions should be considered first? a. Shed firm load b. Implement Active Load Management c. Return outaged equipment to service d. Request a voltage reduction - c. Return outaged equipment to service 3. If your transmission path is rated for 1200 MW and 1000 MW are scheduled on it, but due to parallel fl...
    (0)
  • CA$26.09
  • + learn more