Package deal
NERC EXAM BUNDLE | UPDATED 2023/24
All NERC exam , with complete study sets
[Show more]All NERC exam , with complete study sets
[Show more]NERC Reliability Coordinator Exam Vocabulary 2023/24 | updated 
 
Accelerating Power - In a GENERATOR, the difference between the MECHANICAL INPUT POWER and the electrical output POWER (assuming no LOSSES). For a GENERATOR's TORQUE ANGLE to change, the GENERATOR must have accelerating POWER. 
Accu...
Preview 4 out of 49 pages
Add to cartNERC Reliability Coordinator Exam Vocabulary 2023/24 | updated 
 
Accelerating Power - In a GENERATOR, the difference between the MECHANICAL INPUT POWER and the electrical output POWER (assuming no LOSSES). For a GENERATOR's TORQUE ANGLE to change, the GENERATOR must have accelerating POWER. 
Accu...
NERC Vocabulary | complete solution latest 2023/24 
 
Adjacent Balancing Authority - A BA whose BA area is interconnected with another BA area either directly or via a multi-party agreement or transmission tariff. 
Adverse Reliability Impact - The impact of an event that results in frequency-relat...
Preview 2 out of 9 pages
Add to cartNERC Vocabulary | complete solution latest 2023/24 
 
Adjacent Balancing Authority - A BA whose BA area is interconnected with another BA area either directly or via a multi-party agreement or transmission tariff. 
Adverse Reliability Impact - The impact of an event that results in frequency-relat...
NERC Reliability Test Bank | WITH COMPLETE SOLUTION 2023/24 
 
A Balancing Authority has a sudden loss of a large block of load in its area. This loss will be seen instantaneously in the change of which of the following values? 
1. Actual Net Interchange 
2. Scheduled Frequency 
3. Scheduled Net Int...
Preview 4 out of 32 pages
Add to cartNERC Reliability Test Bank | WITH COMPLETE SOLUTION 2023/24 
 
A Balancing Authority has a sudden loss of a large block of load in its area. This loss will be seen instantaneously in the change of which of the following values? 
1. Actual Net Interchange 
2. Scheduled Frequency 
3. Scheduled Net Int...
NERC TOP System Operations EXAM QUESTIONS AND ANSWERS | UPDATED 2023/24 
 
At what torque angle of operation does power typically begin to flow from the generator to the system? 
 
A) 90 degrees 
B) 60 degrees 
C) 30 degrees 
D) 10 degrees 10 degrees 
Choose the answer that best describes the oper...
Preview 2 out of 13 pages
Add to cartNERC TOP System Operations EXAM QUESTIONS AND ANSWERS | UPDATED 2023/24 
 
At what torque angle of operation does power typically begin to flow from the generator to the system? 
 
A) 90 degrees 
B) 60 degrees 
C) 30 degrees 
D) 10 degrees 10 degrees 
Choose the answer that best describes the oper...
NERC SOS quiz questions | 2023/24 WITH COMPLETE SOLUTION 
 
If a Balancing Authority does not comply with the Control Performance Standard, the Balancing Authority is not permitted to provide which of the following for any other Balancing Authority entities? - Regulation of other services related t...
Preview 3 out of 26 pages
Add to cartNERC SOS quiz questions | 2023/24 WITH COMPLETE SOLUTION 
 
If a Balancing Authority does not comply with the Control Performance Standard, the Balancing Authority is not permitted to provide which of the following for any other Balancing Authority entities? - Regulation of other services related t...
NERC Test Questions | ACTUAL QUESTION AND ANSWERS | UPDATED 2023/24 
 
What percentage of load gives a 1 Hz change in an island condition? - 6-10% (Think 6-10 day island vacation) 
If ACE is Zero but system Hz is off, what should a system operator do? - Nothing! ACE bias and interchange sche...
Preview 2 out of 11 pages
Add to cartNERC Test Questions | ACTUAL QUESTION AND ANSWERS | UPDATED 2023/24 
 
What percentage of load gives a 1 Hz change in an island condition? - 6-10% (Think 6-10 day island vacation) 
If ACE is Zero but system Hz is off, what should a system operator do? - Nothing! ACE bias and interchange sche...
NERC Final Assessment Correct answers | LATEST questions and answers already passed 
 
When using a dynamic schedule and the energy profile in an hour is >250 MW and the actual hourly integration deviates from the hourly energy profile by ____ the tag must be modified. 
A. 100 MW 
B. 10% 
C. 50 M...
Preview 4 out of 46 pages
Add to cartNERC Final Assessment Correct answers | LATEST questions and answers already passed 
 
When using a dynamic schedule and the energy profile in an hour is >250 MW and the actual hourly integration deviates from the hourly energy profile by ____ the tag must be modified. 
A. 100 MW 
B. 10% 
C. 50 M...
NERC Interchange Transaction | questions and answers 
 
Generating units jointly owned by two or more Balancing Authorities may be modeled in the AGC systems as a "virtual" tie line flow (pseudo-tie). To properly account for the jointly owned unit as a pseudo-tie, each Balancing Authority must inc...
Preview 2 out of 8 pages
Add to cartNERC Interchange Transaction | questions and answers 
 
Generating units jointly owned by two or more Balancing Authorities may be modeled in the AGC systems as a "virtual" tie line flow (pseudo-tie). To properly account for the jointly owned unit as a pseudo-tie, each Balancing Authority must inc...
Practice Test NERC Questions and answers | updated 2024 
 
A transmission line is operating with a voltage phase angle different of 30 degrees between the sending Vs and the receiving bus Vr. If the receiving end load is suddenly increased, the voltage phase angle difference will be? - The phase an...
Preview 2 out of 14 pages
Add to cartPractice Test NERC Questions and answers | updated 2024 
 
A transmission line is operating with a voltage phase angle different of 30 degrees between the sending Vs and the receiving bus Vr. If the receiving end load is suddenly increased, the voltage phase angle difference will be? - The phase an...
NERC RC Exam | UPDATED 2024 questions and answers 
 
Common standard time period for station battery to handle outage of AC power to chargers - 8-12 hours 
Time to restore data exchange redundancy when redundancy testing by RC/TOP/BA deemed unsuccessful - 2 hours 
Transition period to backup contr...
Preview 1 out of 4 pages
Add to cartNERC RC Exam | UPDATED 2024 questions and answers 
 
Common standard time period for station battery to handle outage of AC power to chargers - 8-12 hours 
Time to restore data exchange redundancy when redundancy testing by RC/TOP/BA deemed unsuccessful - 2 hours 
Transition period to backup contr...
NERC book quiz questions | updated 2024 
 
You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due to a large loss of load in the contingent BA. If your generator governor control systems responded to the frequency deviation approximately how much of a generati...
Preview 2 out of 10 pages
Add to cartNERC book quiz questions | updated 2024 
 
You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due to a large loss of load in the contingent BA. If your generator governor control systems responded to the frequency deviation approximately how much of a generati...
SOS NERC Prep - RElIABILITY Exam | latest 2023/24 with complete solution 
 
The Reliability Coordinator just informed you of a slow time error correction which will begin at the top of the next hour. Your EMS system will not let you change your scheduled frequency. Your Frequency Bias Setting is -10...
Preview 4 out of 49 pages
Add to cartSOS NERC Prep - RElIABILITY Exam | latest 2023/24 with complete solution 
 
The Reliability Coordinator just informed you of a slow time error correction which will begin at the top of the next hour. Your EMS system will not let you change your scheduled frequency. Your Frequency Bias Setting is -10...
NERC Certification Practice Questions | updated 2023/24 
 
Which of the following represents a virtual tie-line updated in real time? - pseudo-tie 
Balancing Areas shall analyze forecasted generation availability and reserve levels, and inform their reliability coordinators of actual or potential g...
Preview 1 out of 1 pages
Add to cartNERC Certification Practice Questions | updated 2023/24 
 
Which of the following represents a virtual tie-line updated in real time? - pseudo-tie 
Balancing Areas shall analyze forecasted generation availability and reserve levels, and inform their reliability coordinators of actual or potential g...
NERC Certification Exam | Actual questions and answers 2023/24 
 
True/False 
 
According to the NERC Functional Model, there is no difference between the function and the entity. 
 
A) True 
B) False - B) False 
True/False 
 
Analysis type questions are designed to be the least complex from a huma...
Preview 2 out of 15 pages
Add to cartNERC Certification Exam | Actual questions and answers 2023/24 
 
True/False 
 
According to the NERC Functional Model, there is no difference between the function and the entity. 
 
A) True 
B) False - B) False 
True/False 
 
Analysis type questions are designed to be the least complex from a huma...
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
You can quickly pay through credit card for the summaries. There is no membership needed.
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Stuvia is a marketplace, so you are not buying this document from us, but from seller STUVATE. Stuvia facilitates payment to the seller.
No, you only buy these notes for £11.55. You're not tied to anything after your purchase.
4.6 stars on Google & Trustpilot (+1000 reviews)
80461 documents were sold in the last 30 days
Founded in 2010, the go-to place to buy revision notes and other study material for 14 years now