US Army Explosive Safety Familiarization Exam with 100% Correct Answers 2024/2025
416 views 9 purchases
Module
US Army Explosive Safety Familiarization
Institution
US Army Explosive Safety Familiarization
Your installation is refurbishing an existing PES facility built in 1968. Do you need to
complete an ESSP? - Correct answer-Yes, and it requires DDESB approval.
As distance from the potential explosion site decreases, the potential for damage to an
exposed site from an explosion.... - Correct an...
us army explosive safety familiarization exam with 100 correct answers 2023
us army explosive safety familiarization exam
us army explosive safety familiarization
Written for
US Army Explosive Safety Familiarization
US Army Explosive Safety Familiarization
Seller
Follow
professoraxel
Reviews received
Content preview
US Army Explosive Safety
Familiarization Exam with 100% Correct
Answers 2023
Your installation is refurbishing an existing PES facility built in 1968. Do you need to
complete an ESSP? - Correct answer-Yes, and it requires DDESB approval.
As distance from the potential explosion site decreases, the potential for damage to an
exposed site from an explosion.... - Correct answer-increases.
Your installation is increasing the NEW for a storage site built in 1969 and storing a
hazard division that was not previously approved for that location. Do you need to
complete an ESSP? - Correct answer-Yes, and it requires DDESB approval.
Intraline distance (ILD) is the minimum distance permitted between... - Correct answer-
two operating buildings.
The purpose of an ESSP is to ensure safety, provide specifications, and... - Correct
answer-establish limits.
You must submit an ESSP for DDESB approval if the installation is... - Correct answer-
building an ES within an existing ESQD arc.
Failing to submit a successful ESSP may result in... - Correct answer-reduced
operational capacity.
Which are the phases of the ESSP process in order? - Correct answer-Development
and Evaluation, Submission, DDESB Review, and Implementation.
The Expedited Approval Request must... - Correct answer-explain why an expedited
approval is required.
Which part of the ESSP package contains background information, site location, and
the reason for the ESSP submission? - Correct answer-ESSP narrative
Which ESSP category addresses facilities and operations that do not completely
conform to deterministic QD criteria or meet the risk-based criteria in DESR 6055.09
Edition 1? - Correct answer-HSP
Which is NOT a common mistake when submitting an ESSP? - Correct answer-Sending
the ESSP to USATCES
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller professoraxel. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for £12.07. You're not tied to anything after your purchase.