100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Level 3 Diploma in Gas Engineering Install £7.49   Add to cart

Essay

Level 3 Diploma in Gas Engineering Install

 2 views  0 purchase

Level 3 Diploma in Gas Engineering Install

Preview 1 out of 3  pages

  • April 28, 2023
  • 3
  • 2022/2023
  • Essay
  • Unknown
  • A
All documents for this subject (4)
avatar-seller
strawbsxo
Appliance type: E.C.A proteus premix 24kw
Meter: U6
Install 4 write-up
I arrived on site in 66 St john's avenue, at 9 am for the decommission of an old
boiler and install the install of a new E.C.A proteus premix 24kw boiler. Before
the removal of the old boiler, I carried out a visual inspection. This is important to
make sure that all visible risks or dangers are seen before starting work so that
the service that I will conduct runs smoothly. My inspection consisted of checking
the appliance for any asbestos, leak's, cracks, inspecting surfaces and internal
walls whilst also looking for signs of corrosion or overheating. When I was
satisfied that there were no visible risks or dangers, I moved onto conducting my
tightness test.
Prior to starting the tightness test I made sure that the U-gauge I was using was
in good working condition and that the water inside of it was level to zero-zero
millibar. I performed this tightness test to make sure that the installation that
was done before is safe. The first test that I performed on the meter was the let–
by test, to ensure that there is no gas that can pass through the valve when it is
turned off, so I isolated all appliances starting farthest from the meter. I removed
the screw from the test point and replaced it with the tube from the U-gauge. I
then put the ECV to the on position, to make pressure, so that the reading within
the U-gauge was at 10 mb (millibar) and then timed it to run for 1 minute. Once I
was fulfilled with my let-by test that proved no gas was passing through when
the ECV was in the off position I moved on to conducting my temperature
stabilisation. Temperature stabilisation is done to allow the water and gas in the
U-gauge to equalise in temperature so the reading from the tightness test will be
accurate.
With the tube still attached to the test point I made sure that the reading on the
U-gauge was back on its original position (zero-zero millibar). I Then turned the
ECV to the on position to allow the pressure to let the water rise to 20 mb,
subsequently timing it for 1 minute. When I was done with my temperature
stabilisation and content that my results were adequate, I moved on to the
tightness test. The tightness test is implemented to test the entire installation
(all pipework and appliances downstream of the meter) for gas escapes. Firstly, I
made sure that the U-gauge was back to the starting off point at zero-zero
millibars, then I turned the ECV to the on position to allow the pressure from the
gas to push the water in the U-gauge to 20 mb which I there after timed for 2
minutes. Finally, When the tightness test procedure was completed and I was
happy with my results, I started preparing myself for the next stage by removing
the tube from the U-gauge and replacing it with the screw immediately.
Following the tightness test I conducted a standing pressure test. Standing
pressure is the pressure of gas with no appliances running but the isolation valve
and ECV turned on. The standing pressure measured at the meter should be 19-
29 mb. I started by turning the ECV handle steadily to the fully on position, while
simultaneously taking a reading from the U-gauge. The reading I got was 25mb
which I was happy with as it was within the range it should be in.
I then continued to prepare my area of work with all my tools like my heat mat,
drills and begun power flushing the system. I then moved on to isolating the

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller strawbsxo. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for £7.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

66579 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy revision notes and other study material for 14 years now

Start selling
£7.49
  • (0)
  Add to cart