100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Unit 11 D Guranteed template - Site Engineering for Construction £10.49   Add to cart

Essay

Unit 11 D Guranteed template - Site Engineering for Construction

 12 views  0 purchase

As long as you paraphrase everything, change the fonts, change the images, and as long the scenario remains pretty similar, I see no reason as to why you CAN'T get a D for this assignment. Buy it if you don't believe me, Trust me PURCHASE & you will NOT regret it. I will be posting more of assignm...

[Show more]

Preview 2 out of 17  pages

  • August 24, 2023
  • 17
  • 2021/2022
  • Essay
  • Unknown
  • A+
All documents for this subject (1)
avatar-seller
sulimaanmohammed
USE YOUR OWN FONTS AND IMAGES AND MAKE

SURE YOU PARAPHRASE ALL OF THIS. DON’T

IGNORE THIS BECAUSE YOU WILL PAY THE

PRICE AND IT WON’T TAKE YOU MUCH TIME!!!!!!

THANK YOU :) geodetic-surveying/
methods/


(P.S AGAIN USE YOUR OWN FONTS PLEASE)




Linear, levelling, angular measurements


When survey work is carried out, the whole
proposed area must be investigated before
starting measurements. This is done by a survey
framework, which consists of lines and angle
lengths which forms the initial shape of the land.




For linear surveys, survey framework consists of well-conditioned triangles, which are
approximately 30’-120’ degrees, due to its accurate shape whereas polygonal shapes are
used for transverse surveys.
At a certain point of a survey line, a survey station is positioned after a baseline is
framed out (the longest line between points). In order to prevent systematic errors, a
check line is provided to measure the extent of accuracy of the plotted measurements.
The basic units for angular measurements are important to consider because it makes
surveying calculations in the land and sets out surveying, using angles. The 3 main factors
to consider of measurements is:

,  A circle is 360 degrees.
 A degree consists of 60 minutes.
 A minute is made up of 60 seconds.
 = D*, M’, S”




Whole circle bearings


WCB’s are important for a surveyor to calculate, when trying to
calculate the direction of a survey line, which is measured in a
clockwise motion from the North. It differs to a reduced bearing,
which are measured from north or south or towards east and
west. A surveyor can connect lines with its flowed direction using
an open traverse or a closed traverse: an open traverse
surveys different start and end points such as a river canal
bearings-to-whole-circle- whereas a closed traverse starts and ends with its initial point
bearing/
such as mapping out a construction site.


Offset measurements:




2
BTEC Assignment Brief v1.0
BTEC Internal Assessment QDAM January 2015

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller sulimaanmohammed. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for £10.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

66579 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy revision notes and other study material for 14 years now

Start selling
£10.49
  • (0)
  Add to cart